Status of New Models Hosted on the Virtual Test Bed (VTB) in 2024

The National Reactor Innovation Center (NRIC) mission is to support deployment of novel reactor concepts. This is achieved by providing physical and virtual spaces for building and testing various components, systems, and complete pilot plants. The Virtual Test Bed (VTB) represents the virtual counterpart to the physical test bed. It is in development in collaboration with the Department of Energy’s (DOE) Nuclear Energy Advanced Modeling and Simulation (NEAMS) program. The mission of the VTB is to accelerate the deployment and licensing of advanced reactors by leveraging state-of-the-art modeling and simulation (M&S) tools developed by the DOE NEAMS program. This is accomplished by three primary means: (1) openly hosting simulations that showcase analysis capabilities, (2) continuously testing the models hosted against code updates to avoid deprecation, and (3) filling key M&S gaps that are relevant for the physical NRIC test beds. The VTB repository consists of two sub-entities: 1. A documentation website detailing the models (https://mooseframework.inl.gov/virtual_test_bed). 2. A GitHub repository that hosts the corresponding files (https://github.com/idaholab/virtual_test_bed). Previous documentation on the models hosted in the VTB can be found in [1,2,3,4]. These references also include additional background information on the various NEAMS codes showcased in the VTB (which is omitted here for brevity). This paper primarily provides a status update of the most recent additions to the repository.

22 - GENERAL STUDIES OF NUCLEAR REACTORS

Towards Cost-Competitive Microreactors

To assess the cost competitiveness of microreactors, a new tool integrating reactor design calculations with economic models was developed. Using detailed cost data and design specifications from the MARVEL project (85 kWth), the tool estimates costs for a more representative commercial microreactor (20 MWth). The LCOE for a 20 MWth MARVEL-like reactor is estimated at $236/MWh, with an overnight cost of about $12,000/kW (excluding fuel). Mass production could reduce costs by 70%, making the 10th unit cost around $3,700/kWe, which is economically competitive. The new neutronics-economics coupling tool also enables studying the impact of the design parameters on the economic figures of merit. The impact of changing the enrichment and reactor capacity on the LCOE has been studied.

22 - GENERAL STUDIES OF NUCLEAR REACTORS

Technoeconomic Evaluation of Microreactor Using Detailed Bottom-up Estimate (Rev.1)

Microreactors are a novel class of nuclear reactors that are expected to be factory produced, transportable, and self-regulating. They are expected to be several orders of magnitude smaller in size than traditional reactors (with power outputs in the 1–20 MWe range typically). They are primarily envisaged to target niche, remote markets that are difficult to access and where energy costs are high. There has been a scarcity of technoeconomic assessment for these types of reactors due to the scarcity of designs without proprietary restraints (e.g., those that include balance of plants and building layouts) and cost estimates. The primary objective of this report was to develop a transparent, detailed, bottom-up cost estimate for a microreactor. While there is a high degree of uncertainty associated with the projected costs, this work provides a foundation that can built upon and improved to better model the economics of microreactors. The Microreactor Applications Research, Validation, and Evaluation (MARVEL) microreactor was selected for this analysis. This Department of Energy–sponsored demonstration was chosen because (1) its final design was recently completed and (2) a detailed class-3 cost-and-schedule estimation was conducted for it. This provided a strong technical basis for further analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Nuclear Energy Cost Estimates for Net Zero World Initiative – 2024 Update

This report provides recommended parameters for incorporating nuclear energy systems into decarbonization modeling scenarios. The values are primarily intended for the Net Zero World (NZW) Initiative but are expected to prove useful to other related efforts. Both costs and operational metrics are provided in the study for large reactors and small modular reactors (SMR).

29 ENERGY PLANNING, POLICY, AND ECONOMY

MICROREACTOR APPLICATIONS, RESEARCH, VALIDATION, AND EVALUATION (MARVEL) REACTOR ? STATUS, CONSTRUCTION, AND TESTING

The paper presents the current status of the Microreactor Applications, Research, Validation, and Evaluation (MARVEL) microreactor design, qualification testing, fabrication, and high-level construction schedule. An overview of initial criticality, low power physics testing, and start-up testing is included, as well as an overview of the envisioned processes in which end-users can engage the project for access to operational data or specific demonstrations. Designed by the Idaho National Laboratory (INL) under the auspices of the US Department of Energy’s Microreactor Program for construction and operation at the INL, MARVEL is a small, fully functional advanced reactor with UZrH fuel and thermal output of 85 kW. It offers a unique opportunity for scaled demonstrations that can dramatically accelerate the design, licensing, and deployment of commercial microreactors for power production or process heat applications. MARVEL’s objective is to build a small liquid-metal thermal reactor at the INL to demonstrate design and operating processes for microreactors, microgrid integration, and process heat applications. MARVEL finished 90%-final-design in September 2023 and completed an independent project assessment in early 2024. Fabrication of long-lead components and fuel, safety analysis review, and procurement for construction are underway. MARVEL assembly and construction will start in 2025 and fuel loading is expected in mid- 2027. Initial criticality will be performed in a dry condition in late 2027, followed by loading of NaK coolant and start-up testing. Approximately six months later, release for unrestricted operations will enable subsequent testing of microreactor characteristics, microgrid integration and select heat extraction applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Extension of Virtual Test Bed Advanced Modeling and Simulation Capabilities for Fusion Energy

The National Reactor Innovation Center (NRIC) was established to accelerate the deployment of novel reactor concepts. This is achieved by providing physical and virtual spaces for building and testing reactor experiments. The Virtual Test Bed (VTB) represents the virtual counterpart to the physical test beds. It is a collaboration with the Department of Energy’s (DOE) Nuclear Energy Advanced Modeling and Simulation (NEAMS) program with the mission to accelerate the deployment of advanced reactors by facilitating the adoption of advanced modeling and simulation (M&S) tools developed by the DOE. This mission has been carried out by the VTB since 2020 by hosting and featuring dozens of advanced fission nuclear reactor models developed by national laboratories and academia. The charter of the NRIC’s definition of advanced reactors also includes fusion nuclear reactors. As the tools developed by the NEAMS program are increasingly used for modeling fusion energy devices, there is an increasing need to host fusion reactor models on the VTB repository. The VTB will be extended in 2024 to support fusion energy modeling and simulation.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Identifying Nuclear Cost Targets for Competitive Maritime Decarbonization

The shipping industry contributes to a substantial quantity of global carbon emissions. Reaching a “Net-Zero World” will ultimately require complete decarbonization of the existing fleet. Nuclear energy may provide a viable solution toward this end goal. To better understand the economic dynamics of relying on nuclear energy to power maritime fleets, cost targets were identified in this study. Two use cases were considered: (1) nuclear energy is used to generate synthetic fuel (termed synfuel) to power maritime propulsion, and (2) nuclear reactors for vessel propulsion. The study found that in both cases realistic cost targets for nuclear reactor costs could be reached. However, option 2 was deemed to be much more competitive overall but with higher technical risks.

29 - ENERGY PLANNING, POLICY AND ECONOMY

Development of a Computational Framework for Multiphysics Multiphase Species Tracking using NEAMS Tools

This report implements a high-fidelity multiphysics modeling framework using the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program tools to track isotopic species in Molten Salt Reactors (MSRs), with a specific focus on the 91-depletion chain within the Molten Salt Reactor Experiment (MSRE). The model integrates neutronics, thermal-hydraulics, depletion, and thermochemistry to simulate the production, transport, and phase transitions of isotopes under steady-state and transient conditions. The main findings reveal that isotopes such as bromine-91 largely remain in the liquid phase, while others, including krypton-91and yttrium-91, transition to the gas phase, significantly influencing the reactor’s radiological source term. The study also shows that during transients, like a reactivity insertion transient, rapid void formation and the expansion of the liquid-gas interface led to substantial transfers of dissolved isotopes into the gas phase, altering isotope distribution and largely increasing the source term in the off-gas system. Additionally, the research highlights that short-lived isotopes dominate the initial off-gas response during transients, while longer-lived isotopes determine the equilibrium state, underscoring the necessity of dynamic simulations for accurate species tracking and reactor safety analysis. The developed methodology will be applied in the future to the tracking of a larger number of species and introduce other species tracking mechanisms, such as deposition and plating.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Annual Technology Baseline: The 2024 Electricity Update

Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), the National Renewable Energy Laboratory annually provides an organized and centralized set of such cost and performance data. The ATB uses the best information from the Department of Energy national laboratories' energy analysts. The ATB has been reviewed by experts and it includes the following electricity generation and storage technologies: land-based wind, offshore wind, distributed wind, utility-scale solar photovoltaics (PV), commercial-scale solar PV, residential-scale solar PV, concentrating solar power, geothermal power, hydropower, utility-scale battery storage, commercial battery storage, residential battery storage, pumped storage hydropower, nuclear, coal, and natural gas. EIA data for conventional biopower are included for reference. This webinar presentation introduces the 2024 update to the ATB Electricity data and documentation.

battery storage

2024 Annual Technology Baseline (ATB) Cost and Performance Data for Electricity Generation Technologies

These data provide the 2024 update of the Electricity Annual Technology Baseline (ATB). Starting in 2015 NREL has presented the ATB, consisting of detailed cost and performance data, both current and projected, for electricity generation and storage technologies. The ATB products now include data (Excel workbook, Tableau workbooks, and structured summary csv files), as well as documentation and user engagement via a website, presentation, and webinar. Starting in 2021, the data are cloud optimized and provided in the OEDI data lake. The data for 2015 - 2020 are can be found on the NREL Data Search Page. The website documentation can be found on the ATB Website.

Array

Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors

The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.

22 GENERAL STUDIES OF NUCLEAR REACTORS