Search NASA⌕ Search

Engineering topics

Abrams, R.

Publications and source records attributed to Abrams, R..

Workshop on a future muon program at FNAL

The Snowmass report on rare processes and precision measurements recommended Mu2e-II and a next generation muon facility at Fermilab (Advanced Muon Facility) as priorities for the frontier. The Workshop on a future muon program at FNAL was held in March 2023 to discuss design studies for Mu2e-II, organizing efforts for the next generation muon facility, and identify synergies with other efforts (e.g., muon collider). Topics included high-power targetry, status of R&D for Mu2e-II, development of compressor rings, FFA and concepts for muon experiments (conversion, decays, muonium and other opportunities) at AMF. This document summarizes the workshop discussions with a focus on future R&D tasks needed to realize these concepts.

43 PARTICLE ACCELERATORS↗

Mu2e Run I Sensitivity Projections for the Neutrinoless Conversion Search in Aluminum

The Mu2e experiment at Fermilab will search for the neutrinoless conversion in the field of an aluminum nucleus. The Mu2e data-taking plan assumes two running periods, Run I and Run II, separated by an approximately two-year-long shutdown. This paper presents an estimate of the expected Mu2e Run I search sensitivity and includes a detailed discussion of the background sources, uncertainties of their prediction, analysis procedures, and the optimization of the experimental sensitivity. The expected Run I discovery sensitivity is , with a total expected background of events. In the absence of a signal, the expected upper limit is at 90% CL. This represents a three order of magnitude improvement over the current experimental limit of at 90% CL set by the SINDRUM II experiment.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

R & D of a Gas-Filled RF Beam Profile Monitor for Intense Neutrino Beam Experiments

We report the R&D of a novel radiation-robust hadron beam profile monitor based on a gas-filled RF cavity for intense neutrino beam experiments. An equivalent RF circuit model was made and simulated to optimize the RF parameter in a wide beam intensity range. As a result, the maximum acceptable beam intensity in the monitor is significantly increased by using a low-quality factor RF cavity. The plan for the demonstration test is set up to prepare for future neutrino beam experiments.

43 PARTICLE ACCELERATORS↗

Using Project X as a Proton Driver for Muon Colliders and Neutrino Factories

The designs of accelerator systems that will be needed to transform Fermilab's Project X [1-3] into a high-power proton driver for a muon collider and/or a neutrino factory are discussed. These applications require several megawatts of beam power delivered in tens or hundreds of short multi-GeV bunches per second, respectively. Project X may require a linac extension to higher energy for this purpose. Other major subsystems that are likely to be needed include storage rings to accumulate and shorten the proton bunches and an external beam combiner to deliver multiple bunches simultaneously to the pion production target.

43 PARTICLE ACCELERATORS↗