Search NASA⌕ Search

Engineering topics

Alabau-Gonzalvo, J

Publications and source records attributed to Alabau-Gonzalvo, J.

The Multi Optical Transition Radiation System

The determination and monitoring of the transverse phase space in ATF2 is crucial in order to meet their performances specifications. Since the beam sizes at the Interaction Point (IP) depend strongly on the aberrations in the Final Focus System (FFS), accurate measurement upstream of the FFS is required to tune the beam sizes at the IP. The beam sizes as well as the emittance are measured in several locations in the beam diagnostic section of the Extraction Line (EXT line) of ATF2. The vertical beam sizes in the diagnostic section are of the order of 10 {mu}m this means that the devices have to image spot sizes as small as 5 {mu}m, with 10% accuracy a 2 {mu}m resolution device is necessary. The ATF2 EXT line is a beam line with low power and low repetition rate that make usable devices using solid targets. In contrast to a ring machine, where an individual bunch can be measured many times as it passes around the ring, the beam size and the emittance measurement in the LC or in the beam lines have to be performed in a single pass. This requires that the wire scan device types (laser or solid) sample across successive bunches within a train, often with an over-estimation of the beam size due to beam position and intensity jitter, and can take up to half a minute to complete the measurement. Although some of these effects could be corrected, as the jitter effect could be subtracted by using the nearby BPMs signals, this can be avoided by using Optical Transition Radiation (OTR) Monitors. These monitors are based on the transition radiation effect, a light cone emitted when the charged particle crosses a metallic interface. This light is emitted in a specular fashion so it can be focused on to a CCD and produces an image of the beam. OTRs are able to take many fast measurements and therefore to measure the emittance with high statistics, giving a low error and a good understanding of the emittance jitter. In this article, simulations of the expected beam sizes and emittance, along with a technical description of the system, its hardware and software implementation are described. Additionally first measurement of the beam size and emittance of the Multi Optical Transition Radiation System located in the Extraction Line of ATF2 are presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

ATF2 Summary and Status

The Accelerator Test Facility (ATF) [1] at KEK was originally constructed as a Damping Ring (DR) demonstration facility for the next generation of electron linear colliders. It consists of a 1.3 GeV s-band linac and a 136m circumference damping ring which can routinely generate 1.6 nC electron bunches with very small vertical emittances (<10pm.rad). Completed in December of 2008, a new extraction line and final focus optics was built, this is referred to as ATF2 [2]. The location of ATF in-relation to the KEK site can be seen in Figure 1. ATF is a general-purpose facility for accelerator physics related R and D activities, with approximately 50% of the available beam time currently devoted to the ATF2 program. The ATF2 extraction line (EXT) and final focus system (FFS) extends about 90 meters from the DR extraction point, a sketch of this system can be seen in figure 2, along with the location of key instrumentation. The primary purpose of the ATF2 beam line is to demonstrate a new style of magnetic focusing optics intended for use at future linear colliders, such as ILC or CLIC based on a local chromaticity correction scheme. The primary goal of the collaboration is to demonstrate the ability of this optics to focus an electron beam of similar emittance to the ILC using a FFS of the same design chromaticity. A comparison of some of the ATF2 design parameters with those of the ILC and CLIC are shown in table 1. With the 1.3 GeV beam energy of ATF2, the target spot size to prove the operability of this optics for ILC is 37nm. This is referred to as 'Goal 1'. In addition, Goal 1 requires the demonstration of stable operations with such a beam size at the Interaction Point (IP). 'Goal 2' is to demonstrate nm-level stability with respect to the IP beam monitors, such as is required for stable beam collisions at ILC or CLIC. A further goal is to attempt to increase the chromaticity of the final focus optics, reducing the IP beta functions to a level where the system more closely resembles the CLIC FFS, and also for some of the newly proposed ILC parameters. It is anticipated that the difficulty of successfully tuning the FFS to deliver design IP beam spot sizes scales with the chromaticity of the system. The design of the achromatic focusing system involves fine cancelation of first, second and third order aberrations at the IP. One needs more accurate cancelation the tighter one attempts to focus the beam, also including more higher order terms. By gradually pushing the system to smaller IP beta functions and higher chromaticity we hope to learn what the limits of such a design are when applied practically. This will give confidence in the design philosophy behind future high-luminosity colliders and in the simulations used to predict their behaviour.

43 PARTICLE ACCELERATORS↗

Optical Transition Radiation System for ATF2

In this paper we present the first measurements performed during the fall 2010 and early 2011 runs. Software development, simulations and hardware improvements to the Multi-Optical Transition Radiation System installed in the beam diagnostic section of the Extraction line of ATF2 are described. 2D emittance measurements have been performed and the system is being routinely used for coupling correction. Realistic beam simulations have been made and compared with the measurements. A demagnifier lens system to improve the beam finding procedure has been designed and will be implemented in a future run. We also discuss further work planned for the subsequent run periods.

43 PARTICLE ACCELERATORS↗