The Science Performance of JWST as Characterized in Commissioning

This paper characterizes the actual science performance of the James Webb Space Telescope (JWST), as determined from the six month commissioning period. We summarize the performance of the spacecraft, telescope, science instruments, and ground system, with an emphasis on differences from pre-launch expectations. Commissioning has made clear that JWST is fully capable of achieving the discoveries for which it was built. Moreover, almost across the board, the science performance of JWST is better than expected; in most cases, JWST will go deeper faster than expected. The telescope and instrument suite have demonstrated the sensitivity, stability, image quality, and spectral range that are necessary to transform our understanding of the cosmos through observations spanning from near-earth asteroids to the most distant galaxies.

Infrared astronomy↗

JWST NIRCam Defocused Imaging Photometric Stability Performance and How It Can Sense Mirror Tilts

We use JWST NIRCam short-wavelength photometry to capture a transit lightcurve of the exoplanet HAT-P-14 b to assess performance as part of instrument commissioning. The short-wavelength precision is 152 ppm per 27 s integration as measured over the full time series compared to a theoretical limit of 107 ppm, after corrections to spatially correlated 1/f noise. Persistence effects from charge trapping are well fit by an exponential function with short characteristic timescales, settling on the order of 5–15 minutes. The short-wavelength defocused photometry is also uniquely well suited to measure the real-time wave-front error of JWST. Analysis of the images and reconstructed wave-front maps indicates that two different hexagonal primary mirror segments exhibited “tilt events,” where they changed orientation rapidly in less than ∼1.4 s. In some cases, the magnitude and timing of the flux jumps caused by tilt events can be accurately predicted with a telescope model. These tilt events can be sensed by simultaneous longer-wavelength NIRCam grism spectral images alone in the form of changes to the point-spread function, diagnosed from the full width at half maximum. They can also be sensed with the fine guidance sensor instrument from difference images. Tilt events possibly from sudden releases of stress in the backplane structure behind the mirrors were expected during the commissioning period because they were found in ground-based testing. Tilt events have shown signs of decreasing in frequency but have not disappeared completely. The detectors exhibit some minor (less than 1%) deviations from linear behavior in the first few groups of each integration, potentially impacting absolute fluxes and transit depths on bright targets, where only a handful of groups are possible. Overall, the noise is within 50% of the theoretical photon noise and read noise. This bodes well for high-precision measurements of transiting exoplanets and other time variable targets.

Everett Schlawin↗

Phasing the Webb Telescope

The James Webb Space Telescope (JWST) is a segmented deployable telescope, currently operating at L2. The telescope utilizes 6 degrees of freedom for adjustment of the Secondary Mirror (SM) and 7 degrees of freedom for adjustment of each of its 18 segments in the Primary Mirror (PM). After deployment, the PM segments and the SM arrived in their correct optical positions to within a ~1 mm, with accordingly large wavefront errors. A Wavefront Sensing and Controls (WFSC) process was executed to adjust each of these optical elements in order to correct the deployment errors and produce diffraction-limited images across the entire science field. This paper summarizes the application of the WFSC process.

JWST↗

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg↗

The Roman Space Telescope Optical System: Status, Test, and Verification

The Nancy Grace Roman Space Telescope (“Roman”) was prioritized by the 2010 Decadal Survey in Astronomy & Astrophysics and is NASA’s next flagship observatory. Launching no earlier than 2026, Roman will explore the nature of dark energy, as well as expand the census of exoplanets in our galaxy via microlensing. Roman will also demonstrate key technology needed to image and spectrally characterize extra-solar planets. Roman’s large field of view, agile survey capabilities, and excellent stability enable these scientific objectives, yet present unique challenges for the design, test, and verification of its optical system. The Roman optical system comprises an optical telescope assembly (OTA) and two instruments: the primary science wide-field instrument (WFI) and a technology demonstration coronagraph instrument (CGI), and the instrument carrier (IC), which meters the OTA to each instrument. This paper presents a status of the optical system hardware as it begins integration and test (I&T), as well as describes key optical test, alignment, and verification activities as part of the I&T program.

space telescope↗

The Roman Space Telescope Optical System: Status, Test, and Verification Update

The Nancy Grace Roman Space Telescope (“Roman”) is NASA’s next flagship observatory. Launching in 2026, Roman will explore the nature of dark energy as well as expand the census of exoplanets in our galaxy via microlensing. Roman’s large field of view, agile survey capabilities, and excellent stability enable these scientific objectives, yet present unique challenges for the design, test, and verification of its optical system. Roman recently completed a comprehensive thermal vacuum test of the Spacecraft bus + Integrated Payload Assembly (SCIPA), followed by integrating the Outer Barrel Assembly (OBA), Solar Array Sunshield (SASS), and Deployable Aperture Cover (DAC) with SCIPA to complete the Observatory. This paper will present an overview of the thermal vacuum optical testing as well as a status of the optical system performance and verification.