Search NASA⌕ Search

Engineering topics

Allen, Mark B.

Publications and source records attributed to Allen, Mark B..

Consequence Management Cobalt Magnet 2022 Laboratory Analysis: After Action Report

On May 16-20, 2022, federal mission partners (e.g., DOE Consequence Management, CDC, FDA, FBI, DHS) as well as integrated state, local, tribal, and territorial governments took part in Cobalt Magnet 22 (CM22), a large-scale, week-long radiological incident exercise in Austin, Texas, that linked several important national assets (National Search Program, Radiological Assistance Program, and Consequence Management [CM] personnel) into a single response effort. The exercise had nine (9) overarching Objectives and an additional 162 associated Critical Tasks for all the participating organizations. In total, 13 National Core Capabilities spanning 5 Mission Areas were represented in the final exercise. This exercise enabled a full range of capabilities to be fielded together and examine the operational connection between major assets, discover any resource shortages associated with conducting multiple mission areas simultaneously or in close succession, and identify any challenges related to leadership. This report summarizes nearly 100 successes and observations provided from players and controllers supporting the LA Division, Fly Away Laboratory (FAL) and Gamma Spectroscopist operations. The observations were categorized to align with the FRMAC programmatic functional areas to consider for future improvements: Logistics, CBRN Responder, Laboratory Analysis, Sampling and Monitoring, Health and Safety, Gamma Spectroscopist Operations, Fly Away Laboratory, and the FRMAC Interdivision Interoperability Group (FIIG).

54 ENVIRONMENTAL SCIENCES↗

Software Requirements for a Sample Check-in application in CBRNResponder

In 2021, functional area drills were held that focused on field sample collection and custody transfer at the sample control hotline for the Radiological Assistance Program (RAP) Consequence Management (CM) program. The overarching goal of these drills were to evaluate the current CM processes using the CBRNResponder mobile and web-based applications. There were several needs identified to improve CM processes and to stream/transfer data across multiple devices with and without internet: (1) A sample check-in process is needed to streamline current processes to reduce errors and create efficiencies, (2) the sample check-in application needs to be deployed as a mobile application and on the browser versions when on-line, and (3) the sample check-in process needs to function in an environment with internet connections and also in a standalone mode when internet is not available.

61 RADIATION PROTECTION AND DOSIMETRY↗