Search NASASearch

Engineering topics

Allmon, Curtis

Publications and source records attributed to Allmon, Curtis.

Space Station Solar Array Joint Repair

In Oct 2007 the International Space Station (ISS) crew noticed a vibrating camera in the vicinity of Starboard Solar Alpha Rotary Joint (SARJ). It had less than 5 months of run time when the anomaly was observed. This approximately 3.2 meter diameter bearing joint supports solar arrays that power the station critical to its operation. The crew performed an EVA to identify what was causing the vibration. It was discovered that one of the 3 bearing tracks of this unconventional bearing had significant spalling damage. This paper discusses the SARJ's unique bearing design and the vulnerability in its design leading to the observed anomaly. The design of a SARJ vacuum test rig is also described along with the results of a life test that validated the proposed repair should extend the life of the SARJ a minimum of 18 years on-orbit.

Loewenthal, Stuart

Test Validation of the Repair to the Space Station Solar Alpha Rotary Joint

The Solar Array Alpha Joint Lubrication Interval Test (SARJ LITE) test rig was built as a method to evaluate the performance of the grease repair on the Starboard SARJ of the International Space Station (ISS) . The on-orbit SARJ was temporarily parked after receiving significant damage on one of its race ring surfaces as a result of inadequate lu brication (high dry contact friction) and unaccounted for roller traction kinematics. In a scaled down rig, flight-like roller bearings wer e preloaded and cycled on a nitrided 15-5 race surface. Grease was ad ded to the track and with instrumentation monitoring performance, trending data will be extracted and used to determine lubrication interva ls for both Port and Starboard ISS SARJ?s. The grease lubrication was found to be effective in eliminating the high friction that contributed to the onorbit race damage.

Allmon, Curtis

Test Validation of the Repair to the Space Station Solar Alpha Rotary Joint (SARJ)

The SARJ LITE (Lubrication Interval Test) test rig was built as a method to evaluate the performance of the grease repair on the Starboard SARJ of the International Space Station(ISS). The on-orbit SARJ was temporarily parked after receiving significant degradation on one of its race ring nitrided surfaces as a result of inadequate lubrication ( high dry contact friction) and unaccounted for roller traction kinematics. In a scaled down rig, flight like roller bearings were preloaded and cycled on a nitrided 15-5 race surface. Grease was added to the track and with instrumentation monitoring performance, trending data will be extracted and used to determine lubrication intervals for both Port and Starboard ISS SARJ's. The grease lubrication was found to be effective in eliminating the high friction that contributed to the on-orbit race degradation.

Allmon, Curtis

Space Station Freedom Solar Array tension mechanism development

A tension mechanism is used to apply a tension force to the Space Station Freedom Solar Array Blanket. This tension is necessary to meet the deployed frequency requirement of the array as well as maintain the flatness of the flexible substrate solar cell blanket. The mechanism underwent a series of design iterations before arriving at the final design. This paper discusses the design and testing of the mechanism.

Allmon, Curtis