Search NASA⌕ Search

Engineering topics

Alonge, Eleanor K.

Publications and source records attributed to Alonge, Eleanor K..

Psyche Science Planning with the Science Opportunity Analyzer

Psyche is a NASA Discovery mission intent on solving mysteries surrounding early planetary formation. The mission spacecraft will journey to (16) Psyche: a metallic asteroid believed to be the exposed core of an early planetesimal. Despite the unique nature of the target asteroid and the mission’s novel science goals, a significant portion of the project’s science planning needs may be met through the use of legacy tools. In particular, the adoption of the Jet Propulsion Laboratory’s (JPL) Science Opportunity Analyzer (SOA) promises to satisfy mission requirements with minimal development effort. Originally developed as a multi-mission science planning tool, SOA can design and visualize observations, perform geometric flight rule checking, model physical phenomena, and much more. The software has been used by the mission since its proposal phase and is expected to continue providing valuable capabilities throughout operations.

Elkins-Tanton, Linda T.↗

The Cassini Solstice Mission: Streamlining Operations by Sequencing with PIEs

The Cassini Solstice Mission (CSM) is the second extended mission phase of the highly successful Cassini/Huygens mission to Saturn. Conducted at a much-reduced funding level, operations for the CSM have been streamlined and simplified significantly. Integration of the science timeline, which involves allocating observation time in a balanced manner to each of the five different science disciplines (with representatives from the twelve different science instruments), has long been a labor-intensive endeavor. Lessons learned from the prime mission (2004-2008) and first extended mission (Equinox mission, 2008-2010) were utilized to design a new process involving PIEs (Pre-Integrated Events) to ensure the highest priority observations for each discipline could be accomplished despite reduced work force and overall simplification of processes. Discipline-level PIE lists were managed by the Science Planning team and graphically mapped to aid timeline deconfliction meetings prior to assigning discrete segments of time to the various disciplines. Periapse segments are generally discipline-focused, with the exception of a handful of PIEs. In addition to all PIEs being documented in a spreadsheet, allocated out-of-discipline PIEs were entered into the Cassini Information Management System (CIMS) well in advance of timeline integration. The disciplines were then free to work the rest of the timeline internally, without the need for frequent interaction, debate, and negotiation with representatives from other disciplines. As a result, the number of integration meetings has been cut back extensively, freeing up workforce. The sequence implementation process was streamlined as well, combining two previous processes (and teams) into one. The new Sequence Implementation Process (SIP) schedules 22 weeks to build each 10-week-long sequence, and only 3 sequence processes overlap. This differs significantly from prime mission during which 5-week-long sequences were built in 24 weeks, with 6 overlapping processes.

Vandermey, Nancy↗