Search NASA⌕ Search

Engineering topics

Amini, Amin

Publications and source records attributed to Amini, Amin.

System and method for managing electrical components for energy usage

A system for managing performance of one or more electrical components in real-time includes one or more sensors to provide working conditions of one or more energy consuming devices. The system further includes one or more actuators coupled to and configured to control the one or more energy consuming devices. Additionally, the system includes a computing device in electrical communication with the one or more sensors and the one or more actuators. The system also includes a database capable of retaining an instruction program for the computing device. The computing device includes a processor that is configured to receive data from the one or more sensors, analyze data from the one or more sensors, and execute the instruction program received from the database in order to optimize operation of the one or more energy consuming devices based on one or more criteria.

Chen, Jie↗

ARC algorithm: A novel approach to forecast and manage daily electrical maximum demand

This paper proposes an innovative algorithm for predicting short-term electrical maximum demand by using historical demand data. The ability to recognize in peak demand pattern for commercial or industrial customers would propose numerous direct and indirect benefits to the customers and utility providers in terms of demand reduction, cost control, and system stability. Prior works in electrical maximum demand forecasting have been mainly focused on seasonal effects, which is not a feasible approach for industrial manufacturing facilities in short-term load forecasting. The proposed algorithm, denoted as the Adaptive Rate of Change (ARC), determines the logarithmic rate-of-change in load profile prior to a peak by postulating the demand curve as a stochastic, mean-reverting process. The rationale behind this analysis, is that the energy efficient program requires not only demand estimation but also to warn the user of imminent maximum peak occurrence. This paper analyzes demand trend data and incorporates stochastic model and mean reverting half-life to develop an electrical maximum demand forecasting algorithm, which is statistically evaluated by cross-table and F-score for three different manufacturing facilities. Lastly, the aggregate results show an overall accuracy of 0.91 and a F-score of 0.43, which indicates that the algorithm is effective predicting peak demand in predicting peak demand.

24 POWER TRANSMISSION AND DISTRIBUTION↗