Fracture Failure Analysis for MQXFA Magnet Aluminum Shells

The High-Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP) is approaching the production phase of the US-contributed Q1 and Q3 Interaction Region Quadrupoles (MQXFA). The structures for the MQXFA prototypes were design and inspected by the US-LARP (LHC Accelerator Research Program), AUP developed criteria, which will be used for the pre-series structures. As the first two full-length prototypes with 4.2 m magnetic length, MQXFAP1 and MQXFAP2, were designed and assembled at Lawrence Berkeley National Laboratory (LBNL), and tested at Brookhaven National Laboratory (BNL). The end aluminum short shell of MQXFAP2 was fractured along the shell length during the test, and tests were stopped. Analytical and Finite Element analysis were performed in light of the graded procedure defined in the Structure Design Criteria to investigate the fracture failure for MQXFAP2. In this paper, we report the fracture analysis of the current shell design, including the elasto-plastic simulations with submodel technique, and calculations with Linear Elastic Fracture Mechanics (LEFM). Test material properties are also presented. The results of this analysis explain why the end shell of MQXFAP2 failed, and suggest fillets on the end shell notches to meet the margin specified in the Structural Design Criteria.

43 PARTICLE ACCELERATORS↗

Mechanical Performance of the First Two Prototype 4.5 m Long Nb$_3$Sn Low-$β$ Quadrupole Magnets for the Hi-Lumi LHC Upgrade

The U.S. High-Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP) team is collaborating with CERN in the design and fabrication of the first 4.5 m long MQXFA magnets, a 150 mm aperture high-field Nb$_3$Sn quadrupole magnet that uses the aluminum shell-based bladder-and-key technology. The first two prototype magnets, MQXFAP1 and MQXFAP2, were assem-bled and tested while the first pre-series structure (MQXFA03) was in fabrication. This paper summarizes the mechanical perfor-mance of these prototype structures based on the comparison of measured strain gauge data with finite element model analyses from all load steps to powering. The MQXFAP1 magnet almost reached ultimate current before a short to ground was detected and the test was stopped. The MQXFAP2 magnet experienced a low training performance due to a fractured aluminum shell. MQXFAP1b was rebuilt with a new replacement coil, but an old coil limited the magnet from achieving the ultimate current. The mitigations and analyses of these prototype magnets are discussed in the context of the transition to pre-series production.

43 PARTICLE ACCELERATORS↗