Beam-induced heating and thermal analysis for the EIC HSR cryogenic helical magnet and BPM assembly
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Anerella, M..
Explore the source record for details and available documents.
The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It is under construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC. This paper will present the program to fabricate the Nb3Sn superconducting magnets. We are reporting the status of the HL-LHC AUP project present the results from horizontal tests of the first fully assembled cryo-assembly.
In the context of high-energy physics, the use of Nb 3 Sn superconducting magnets as a cost-effective and reliable technology depends on improvements in the following areas: long development and manufacturing cycles, conductor degradation after thermal cycling, long training, as well as a demonstration in accelerator magnets with a beam aperture of the full potential of modern Nb 3 Sn conductors. In short, performance, robustness, and cost are the three issues to be addressed. The Magnet Development project (MagDev) of the Swiss Accelerator Research and Technology initiative (CHART) at the Paul Scherrer Institute (PSI) aims to contribute to the solutions to each of these issues, re-thinking the manufacturing and design process. Here in our program, every innovation is to be validated by means of a panoply of fast-turnaround tools: from non-powered and powered samples and coils, tested under background field, to low-field subscale magnets and high field short prototypes. This work presents one element in this panoply of R&D vehicles: a stress-managed Nb 3 Sn coil called BigBOX, impregnated with paraffin wax, and tested, through a collaboration with the Magnet Development Program of the United States (US-MDP), in the background field of Brookhaven National Laboratory (BNL)’s common coils dipole DCC17.
Here, the Electron-Ion Collider (EIC), planned for construction at Brookhaven National Laboratory, will consist of two intersecting beams of intense electrons and high-energy protons or heavier atomic nuclei. The collider will need many demanding components, including high field superconducting magnets for the Interaction Region (IR). It has been decided that a prototype of one such magnet, the B1pF dipole, shall be built, to validate design choices common to all Rutherford cable dipole and quadrupole IR magnets. B1pF is one of several high field magnets in the interaction region whose design is based on the 15.1 mm wide NbTi cable, a cable like the one used in the main dipole coil of the Large Hadron Collider (LHC) at CERN. The current design is based on a single layer coil with an inner diameter of 300 mm and magnetic length of ~3 m which generates a magnetic field at the center of the magnet of about 3.7 T at a current of ~11 kA at design. This paper presents the mechanical design of the B1pF dipole magnet, and the R&D effort associated with the development of the prototype, including tests for successfully winding and curing coils of the needed configuration into proper structural and magnetic elements, and including a multilayer magnetic return yoke which meets field requirements while providing an initial reduced structure suitable for operational testing in an existing test facility.
The US HL-LHC Accelerator Upgrade Project (AUP) is fabricating the MQXFA magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC (HL-LHC). This is the first production of Nb3Sn magnets for a particle accelerator, together with the MQXFB magnets for Q2a and Q2b. Here we show status and some results of MQXFA magnets fabrication and vertical test.
The forward hadron magnets of the planned electron-ion collider (EIC) at Brookhaven National Laboratory (BNL) present a set of unique challenges. In addition to the typical magnet requirements in terms of aperture, gradient, and field quality, the field leakage from the hadron magnets to the electron apertures must be negligible. Due to the close proximity of the two apertures the shielding solution for the electron beam can affect the field quality of the hadron magnets. Here, in this paper, a design for the Q1ApF/Q1BpF low beta quadrupoles based on NbTi Rutherford cable operating at 2K is presented. In this design the electron beam shielding and the required field quality in the hadron magnets are achieved using a set of cutouts in the iron yoke solely without resorting to active shielding. The chosen layout along with the key parameters are presented and their effect on hadron magnets in term of field quality and operational margins are also discussed.
Hybrid magnets are currently under consideration as an economically viable option towards 20 T dipole magnets for next generation of particle accelerators. In these magnets, High Temperature Superconducting (HTS) materials are used in the high field part of the coil with so-called insert coils, and Low Temperature Superconductors (LTS) like Nb 3 Sn and Nb-Ti superconductors are used in the lower field region with so-called outsert coils. The attractiveness of the hybrid option lays on the fact that, on the one hand, the 20 T field level is beyond the Nb 3 Sn practical limits of 15-16 T for accelerator magnets and can be achieved only via HTS materials; on the other hand, the high cost of HTS superconductors compared to LTS superconductors makes it advantageous exploring a hybrid approach, where the HTS portion of the coil is minimized. Here we present in this paper an overview of different design options aimed at generating 20 T field in a 50 mm clear aperture. The coil layouts investigated include the Cos-theta design (CT), with its variations to reduce the conductor peak stress, namely the Canted Cos-theta design (CCT) and the Stress Management Cos-theta design (SMCT), and, in addition, the Block-type design (BL) including a form of stress management and the Common-Coil design (CC). Results from a magnetic and mechanical analysis are discussed, with particular focus on the comparison between the different options regarding quantity of superconducting material, field quality, conductor peak stress, and quench protection.
MQXFA07 did not meet acceptance requirement during vertical test. This report presents the analysis of MQXFA07 components related to the limited test performance, and the damage mechanism as it was understood by the MQXFA team.
The SuperKEKB was designed and constructed as the upgraded accelerator of KEKB. In this accelerator design, the nano-beam scheme of collision was applied and a luminosity of 8 x10 35 cm -2 s -1 was targeted. In the design, the beam final focus system was the key component in the accelerator hardware elements. This final focus system consists of 55 superconducting magnets. In this paper, the designs of the magnets, the cryostats and the cryogenic system are shown, and the field measurement results are reported. The SuperKEKB beam operation with the final focus system started on 2018 March 19, and the magnet quench events up to 2020 December 16 are described.