A Two-Step Restoration Scheme with DER Controllability for Resilient Distribution Systems
Modern distribution systems have increasing integration of distributed energy resources (DERs). A large number of distribution system DERs are interfaced through a power electronic converter. During grid contingency scenarios these resources have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid's restoration after an adverse event and hence enhancing resilience. In distribution systems, system restoration is an important problem, especially in face of high-impact low-frequency events. This paper proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in DERs for mitigating voltage problems. Simulation studies are performed on the IEEE-123 node feeder system to demonstrate the effectiveness of the proposed method for various cases.