Search NASASearch

Engineering topics

Antreasian, Peter G.

Publications and source records attributed to Antreasian, Peter G..

At least 19 records

Revisiting OSIRIS-REx Touch-And-Go (TAG) Performance Given the Realities of Asteroid Bennu

The Origins, Spectral Interpretation, Resource Identification, and Security–Regolith Explorer (OSIRIS-REx) mission is a NASA New Frontiers mission that launched in 2016 and rendezvoused with the near-Earth asteroid (101955) Bennu in late 2018. Upon arrival, the surface of Bennu was found to be much rockier than expected. The original Touch-and-Go (TAG) requirement for sample collection was to deliver the spacecraft to a site with a 25-meter radius; however, the largest hazard-free sites are no larger than 8 meters in radius. To accommodate the dearth of safe sample collection sites, the project reevaluated all aspects of flight system performance pertaining to TAG in order to account for the demonstrated performance of the spacecraft and navigation prediction accuracies. More-over, the project has base lined on board natural feature tracking instead of lidar for providing the on board navigation state update during the TAG sequence. This paper summarizes the improvements in error source estimation, enhancements in on board trajectory correction, and results of recent Monte Carlo simulation to en-able sample collection with the given constraints. TAG delivery and on board navigation performance are presented for the final four candidate TAG sites.

Berry, Kevin

Osiris-Rex Shape Model Performance During the Navigation Campaign

The Navigation Campaign of the OSIRIS-REx mission began when the first image of Bennu was recorded by the PolyCam high-resolution imager on Au-gust 17, 2018. In the ensuing months, two teams began building shape models based on imagery taken during the Approach and Preliminary survey phases to be used for the transition to landmark navigation in the Orbital A phase. The orbit determination team began analyzing and characterizing the performance and errors associated with each shape model delivery working closely to iterate on the next shape model delivery. By the end of Orbital A, shape models produced by the Altimetry Working Group and JPL exceeded pre-launch performance re-quirements. This paper provides a summary of the analysis performed during operations.

Leonard, Jason M.

Multi-Arc Filtering During the Navigation Campaign of the OSIRIS-REx Mission

The Navigation Campaign of the OSIRIS-REx mission consisted of three phases: Approach, Preliminary Survey and Orbital-A. These phases were designed to optimize the initial characterization of Bennu's mass, shape and spin-state to support a safe orbit insertion and a quick transition to landmark-based optical navigation tracking. The standard orbit determination filtering techniques used to navigate the spacecraft were unable to fit data from these three phases simultaneously due to numerical issues associated with the nonlinear dynamics and the long arc length. Consequently, a multi-arc filtering algorithm was implemented in order to combine the information from each of these arcs. Multi-arc solutions for Bennu's spin state and gravity field are presented here.

French, Andrew S.

OSIRIS-REx Orbit Determination Performance During the Navigation Campaign

The OSIRIS-REx mission Navigation Campaign consists of three sub-phases: Approach,Preliminary Survey, and Orbital A. Approach was designed for initial characterization ofBennu while matching Bennu's heliocentric velocity. Preliminary Survey provided the firstspacecraft-based estimate of Bennu's mass. This phase consisted of five target flybys witha close approach distance of about 7 km. Orbital A was a two-month phase devoted to theNavigation Team learning the close proximity operations dynamics and environment aroundBennu and transitioning from center-finding optical navigation to landmark feature-basednavigation. This paper provides a detailed summary of the orbit determination performancethroughout the Navigation Campaign.

Leonard, Jason M.

Early Navigation Performance of the OSIRIS-REx Approach to Bennu

The New Frontiers-class OSIRIS-REx (Origins, Spectral Interpretation, Resource Identification, Security-Regolith Explorer) mission is the first American endeavor to return a sample from an asteroid. In preparation for retrieving the sample, OSIRIS-REx is conducting a campaign of challenging proximity-operations maneuvers and scientific observations, bringing the spacecraft closer and closer to the surface of near-Earth asteroid (101955) Bennu. Ultimately, the spacecraft will enter a 900-meter-radius orbit about Bennu and conduct a series of reconnaissance flybys of candidate sample sites before being guided into contact with the surface for the Touch and Go sample collection event. Between August and December 2018, the OSIRIS-REx team acquired the first optical observations of Bennu and used them for navigation. We conducted a series of maneuvers with the main engine, Trajectory Correction Maneuver, and Attitude Control System thruster sets to slow the OSIRIS-REx approach to Bennu and achieve rendezvous on December 3, 2018. This paper describes the trajectory design, navigation conops, and key navigation results from the Approach phase of the OSIRIS-REx mission.

Antreasian, Peter G.

Orbit Determination Strategy and Simulation Performance for OSIRIS-REx Proximity Operations

The Origins Spectral Interpretation Resource Identification Security Regolith Explorer (OSIRISREx)is a NASA New Frontiers mission to the near-earth asteroid Bennu that will rendez vousin 2018, create a comprehensive and detailed set of observations over several years, collect a regolith sample, and return the sample to Earth in 2023. The Orbit Determination (OD) team isa sub-section of the Flight Dynamics System responsible for generating precise reconstructions and predictions of the spacecraft trajectory. The OD team processes radiometric data, LIDAR, as well as center-finding and landmark-based Optical Navigation images throughout the proximity operations phase to estimate and predict the spacecraft location within several meters. Stringent knowledge requirements stress the OD teams concept of operations and procedures to produce verified and consistent high quality solutions for observation planning, maneuver planning, and onboard sequencing. This paper will provide insight into the OD concept of operations and summarize the OD performance expected during the approach and early proximity operation phases,based on our pre-encounter knowledge of Bennu. Strategies and methods used to compare and evaluate predicted and reconstructed solutions are detailed. The use of high fidelity operational tests during early 2017 will stress the teams concept of operations and ability to produce precise OD solutions with minimal turn-around delay.

Leonard, Jason M.

Optical Navigation Simulation and Performance Analysis for Osiris-Rex Proximity Operations

The OSIRIS-REx mission timeline with OpNav milestones is presented in Figure 1. The first three proximity operations (ProxOps) mission phases focus on Navigation. During these phases, OSIRIS-REx approaches Bennu, conducts equatorial and polar flybys in Preliminary Survey, and inserts into the first mission orbit: Orbit A. During these phases, the OpNav techniques evolve from point-source to resolved-body centroiding to landmark tracking.

Jackman, Coralie D.

Maneuver Strategy for OSIRIS-REx Proximity Operations

The Origins Spectral Interpretation Resource Identification Security Regolith Explorer (OSIRIS-REx) asteroid sample return mission will study and observe asteroid (101955) Bennu (previously known as 1999 RQ36) and subsequently collect and return a sample from the asteroid to Earth for further detailed analysis. After a successful launch in September 2016, the spacecraft will be in cruise phase for two years until arrival at asteroid Bennu in late 2018. At that time, aseries of critical maneuvers will provide an initial characterization of Bennu and the dynamical environment surrounding it, ultimately concluding with a successful capture into orbit about the small asteroid. This paper discusses some of the unique navigation challenges presented by these early operational phases in close proximity to Bennu and shares key observations and results from operational tests that have prepared the operations team and help mitigate the risks posed by these challenges.

Wibben, Daniel R.

Navigation of the GRAIL Spacecraft Pair Through the Extended Mission at the Moon

The GRAIL extended mission (XM) dramatically expands the scope of GRAIL's gravity science investigation by flying the pair of spacecraft at the lowest orbit the flight team can safely support. From the perspective of the Navigation team, the low orbit altitude introduces new challenges. At this lower altitude, navigation is more sensitive to higher-order terms of the gravity field so that orbit determination solutions are more difficult and there is less certainty of achieving maneuver targets. This paper reports on the strategy and performance of the Navigation system for GRAIL's XM. On a weekly basis, the Navigation team provided reference trajectory updates, designed three maneuvers, and reconstructed the execution of those maneuvers. In all, the XM involved 55 planned maneuvers; five were canceled. The results of the Navigation team's efforts, in terms of maintaining the reference-trajectory targets, satisfying requirements, and achieving desired separation distances, are assessed.

orbit

Flying by Titan

The Cassini spacecraft encounters the massive Titan about once every month. These encounters are essential to the mission as Titan is the only satellite of Saturn that can provide enough gravity assist to shape the orbit tour and allow outstanding science for many years. From a navigation point of view, these encounters provide many challenges, in particular those that fly close enough to the surface for the atmospheric drag to perturb the orbit. This paper discusses the dynamics models developed to successfully navigate Cassini and determine its trajectory. This includes the moon's gravity pull with its second degree zonal harmonics J2, the attitude thrust control perturbations and the acceleration of drag.

Pelletier, Frederic J.

Navigational Use of Cassini Delta V Telemetry

Telemetry data are used to improve navigation of the Saturn orbiting Cassini spacecraft. Thrust induced delta V's are computed on-board the spacecraft, recorded in telemetry, and downlinked to Earth. This paper discusses how and why the Cassini Navigation team utilizes spacecraft delta V telemetry. Operational changes making this information attractive to the Navigation Team will be briefly discussed, as will spacecraft hardware and software algorithms responsible for the on-board computation. An analysis of past delta V telemetry, providing calibrations and accuracies that can be applied to the estimation of future delta V activity, is described.

Roth, Duane C.

Cassini Orbit Determination Performance during Saturn Satellite Tour: August 2005 - January 2006

During the period spanning the second Enceladus flyby in July 2005 through the eleventh Titan encounter in January 2006, the Cassini spacecraft was successfully navigated through eight close-targeted satellite encounters. Three of these encounters included the 500 km flybys of the icy satellites Hyperion, Dione and Rhea and five targeted flybys of Saturn's largest moon, Titan. This paper will show how our refinements to Saturn's satellite ephemerides have improved orbit determination predictions. These refinements include the mass estimates of Saturn and its satellites by better than 0.5%. Also, it will be shown how this better orbit determination performance has helped to eliminate several statistical maneuvers that were scheduled to clean-up orbit determination and/or maneuver-execution errors.

Rhea

Mars Exploration Rovers orbit determination filter strategy

The successful delivery of the Mars Exploration Rover (MER) landers to well within the boundaries of their surface target areas in January of 2004 was the culmination of years of orbit determination analysis. The process began with a careful consideration of the filter parameters used for pre-launch covariance studies, and continued with the refinement of the filter after launch based on operational experience. At the same time, tools were developed to run a plethora of variations around the nominal filter and analyze the results in ways that had never been previously attempted for an interplanetary mission. In addition to achieving sub-kilometer Mars-relative orbit determination knowledge, the filter strategy and process detected unexpected error sources, while at the same time proving robust by indicating thecorrect solution. Consequently, MER orbit determination set a new standard for interplanetary navigation.

Mars Exploration Rover (MER)

Mars Odyssey interplanetary navigation strategy

The 2001 Mars Odyssey Mission has returned an orbiter to map the planet and search for water. The success of this mission has reestablished confidence in Mars exploration that will pave the way for future orbiters, landers, adn rovers. The spacecraft has completed its journey and is now in the orbital science-gathering phase of the primary mission, which will continue through August 2004. This paper will describe teh strategy that was designed to safely and accurately navigate the spacecraft to Mars, and also relate the in-flight experience.

Odyssey

A Comprehensive Orbit Reconstruction for the Galileo Prime Mission in the J2000 System

The Galileo spacecraft arrived at Jupiter in December of 1995 to begin an orbital tour of the Jovian system. The objective of the tour was up close study of the planet, its satellites, and its magnetosphere. The spacecraft completed its 11 orbit prime mission in November of 1997 having had 16 successful close encounters with the Galilean satellites (including two prior to Jupiter orbit insertion). Galileo continues to operate and will have made an additional 10 orbits of Jupiter by the date of this Conference. Earlier papers discuss the determination of the spacecraft orbit in support of mission operations from arrival at Jupiter through the first 9 orbits. In this paper we re-examine those earlier orbits and extend the analysis through orbit 12, the first orbit of the Galileo Europa Mission (GEM). The objective of our work is the reconstruction of the spacecraft trajectory together with the development of a consistent set of ephemerides for the Galilean satellites. As a necessary byproduct of the reconstruction we determine improved values for the Jovian system gravitational parameters and for the Jupiter pole orientation angles. Our preliminary analyses have already led to many of the results reported in the scientific literature. Unlike the Galileo Navigation Team which operates in the EME-1950 coordinate system, we elected to work in the (J2000) International Celestial Reference Frame (ICRF), the reference frame of the current JPL planetary and satellite ephemerides as well as the standard frame of the international astronomical and planetary science community. Use of this frame permits more precise modelling of the spacecraft and satellite observations. Moreover, it is the frame of choice for all other operational JPL missions and will probably be the frame for future missions for some time. Consequently, our adoption of the ICRF will facilitate the combination of our results with any obtained from future missions (e.g. the proposed Europa Orbiter mission). In addition, our results may be used by the science community, without need of a reference frame conversion.

Jacobson, Robert A.