Search NASA⌕ Search

Engineering topics

Argouarch, A.

Publications and source records attributed to Argouarch, A..

RF heating systems evolution for the WEST project

Tore Supra is dedicated to long pulse operation at high power, with a record in injected energy of 1 GJ (2.8 MW × 380 s) and an achieved capability of 12 MW injected power delivered by 3 RF systems: Lower Hybrid Current Drive (LHCD), Ion Cyclotron Resonance Heating (ICRH) and Electron Cyclotron Resonance Heating (ECRH). The new WEST project (W [tungsten] Environment in Steady-state Tokamak) aims at fitting Tore Supra with an actively cooled tungsten coated wall and a bulk tungsten divertor. This new device will offer to ITER a test bed for validating the relevant technologies for actively cooled metallic components, with D-shaped H-mode plasmas. For WEST operation, different scenarii able to reproduce ITER relevant conditions in terms of steady state heat loads have been identified, ranging from a high RF power scenario (15 MW, 30 s) to a high fluence scenario (10 MW, 1000 s). This paper will focus on the evolution of the RF systems required for WEST. For the ICRH system, the main issues are its ELM resilience and its CW compatibility, three new actively cooled antennas are being designed, with the aim of reducing their sensitivity to the load variations induced by ELMs. The LH system has been recently upgraded with new klystrons and the PAM antenna, the possible reshaping of the antenna mouths is presently studied for matching with the magnetic field line in the WEST configuration. For the ECRH system, the device for the poloidal movement of the mirrors of the antenna is being changed for higher accuracy and speed.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Physics and technology in the ion-cyclotron range of frequency on Tore Supra and TITAN test facility: implication for ITER

To support the design of an ITER ion-cyclotron range of frequency heating (ICRH) system and to mitigate risks of operation in ITER, CEA has initiated an ambitious Research & Development program accompanied by experiments on Tore Supra or test-bed facility together with a significant modelling effort. The paper summarizes the recent results in the following areas: Comprehensive characterization (experiments and modelling) of a new Faraday screen concept tested on the Tore Supra antenna. A new model is developed for calculating the ICRH sheath rectification at the antenna vicinity. The model is applied to calculate the local heat flux on Tore Supra and ITER ICRH antennas. Full-wave modelling of ITER ICRH heating and current drive scenarios with the EVE code. With 20 MW of power, a current of 400 kA could be driven on axis in the DT scenario. Comparison between DT and DT(3He) scenario is given for heating and current drive efficiencies. First operation of CW test-bed facility, TITAN, designed for ITER ICRH components testing and could host up to a quarter of an ITER antenna. R&D of high permittivity materials to improve load of test facilities to better simulate ITER plasma antenna loading conditions.

Litaudon, X↗

Commissioning of the ITER-like ICRF antenna for JET

The new JET ion cyclotron resonance frequency (ICRF) ITER-like antenna (ILA), which was assembled during 2006, was commissioned on the JET RF testbed prior to installation on the JET torus. The 4 resonant double loops (RDL) of the ILA were tested at high power at 42 MHz up to 42 kV for 5 s in 10 min intervals. Low power matching studies using a saltwater load placed in front of the ILA have allowed testing and optimizing proposed matching algorithms on single RDLs, paired RDLs and finally on the full array. The upper limit of the frequency range of the ILA appears to be limited to 47 49 MHz due to the effect on the electrical lengths of the connection between the capacitors and the conjugate T point. Capacitor position scans have allowed obtaining the necessary data to confirm the RF model of the RDL which is necessary for the scattering matrix arc detection. The latter is deemed necessary in order to detect arcs at the low impedance conjugate T of the circuit. The antenna was installed onto JET during August 2007 and commissioning on plasma started May 2008. At present the commissioning of the ILA on JET is ongoing in a series of dedicated experimental campaigns.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗