Control System of Multi-Port Autonomous Reconfigurable Solar Power Plant (MARS) & HIL Platforms for Design

Multi-port autonomous reconfigurable solar power plant (MARS) provides an attractive alternative to connect photovoltaic (PV) and energy storage systems (ESSs) to high-voltage direct current (HVdc) links and high-voltage alternating current (ac) grids. In this paper, a unique hierarchical control system of MARS is proposed and evaluated. To evaluate the control system and associated algorithms in early-stage research of complex architectures like MARS, it is important to develop unique suitable hardware-in-the-loop (HIL) platforms. In this paper, the HIL platforms for MARS to evaluate the performance of the hierarchical control system and the control algorithms implemented are presented. Further, they help with the design process of control systems. The real-time simulation models and algorithms that are utilized for MARS in the HIL platforms are also discussed in the paper. The HIL experiments of the control system of MARS showcase the capability to provide continuity of operation under faults and frequency support to the power grid during loss of generation. They also showcase the stability of the proposed hierarchical control system of MARS.

14 SOLAR ENERGY↗

EMT Simulation of Large PV Plant & Power Grid for Disturbance Analysis

One of the challenges faced during the analysis of various disturbances with inverter-based resources is the ability to replicate the same disturbance in simulations. The main issue arises from lack of electromagnetic transient (EMT) models and adequate fidelity of models. To overcome this problem, in this paper, EMT simulation of power grid and one of the affected photovoltaic (PV) plants is performed to replicate the observations during the Angeles Forest disturbance in 2018. The processes to (i) develop the EMT model of the power grid from traditional transient stability (TS) data, and (ii) develop high-fidelity EMT model of PV plant from data collected on a PV plant are described in the paper. The requirements in the high-fidelity EMT model of the PV plant are also described. Finally, simulation of the Angeles Forest disturbance is performed and similar simulation results (as compared to the observed disturbances) are observed.

Debnath, Suman↗

Hardware-based Advanced Electromagnetic Transient Simulation for A Large-Scale PV Plant in Real Time Digital Simulator

Power electronics-based resources, such as high-voltage direct current (HVdc) substations, photovoltaic (PV) plants, wind plants, electric vehicle charging stations, and energy storage systems, are increasingly being integrated within the power grid. Recently, multiple reports have emphasized the necessity for high-fidelity electromagnetic transient (EMT) simulations of these large-scale power electronics-based resources to accurately understand their behavior in power grids. However, performing hardware-based EMT simulations with high-fidelity models for such large power electronics systems is challenging due to the small time-step requirements and the involvement of a large number of states. This paper presents the implementation of hardware-based high-fidelity EMT dynamic model of a large-scale PV plant, accomplished through custom model development using the specific-C language in real-time digital simulator hardware (RTDS) and software (RSCAD).

Choi, Jongchan↗

Multi-Port Autonomous Reconfigurable Solar Power Plant

As the penetration level of power electronics increases and remote photovoltaic (PV) generation is integrated into the alternating current (ac) grid, the short-circuit ratio (SCR) at the point of interconnection of a hybrid PV–energy storage system (ESS) plant may be low. Additionally, the inertia of the alternating current (ac) grid may be low. The low SCRs and inertias can lead to reliability challenges in the power grid. These operating conditions require additional reinforcements, such as synchronous condensers, static var compensators, static synchronous compensators, and high-voltage direct current (HVdc) links/grids. HVdc links or grids may also provide the additional capability of connecting the plant to asynchronous grids and/or connecting asynchronous grids, among others. This scenario leads to discrete development of solar inverters, energy storage inverters, HVdc converters, and several transformers. Some of the problems associated with this discrete development and inverter-based generation include increased cost, lower reliability, and reduced efficiency associated with duplication of power electronics (PEs); competing controls of several individual discrete inverter-based generators due to the presence of multiple PEs, which leads to derating of the system; and transient stability problems arising from inverter-based generation, such as voltage/frequency events leading inverter shutdowns, voltage instability and control interactions in the formed weak grid, and harmonics caused by resonances of multiple inverters.

14 SOLAR ENERGY↗

Renewable Integration in Hybrid ac-dc Systems using Multi-port Autonomous Reconfigurable Solar power plant (MARS)

To increase inertia and improve primary frequency response of future grids, grid-forming inverters connecting PV to grid and energy storage systems (ESSs) are likely to play an important role. Moreover, high-voltage direct current (HVdc) links will also be an enabler to transfer remote PV generation and for improved grid stability. That is, with increased penetration of PV, discrete development of PV and ESS connecting to transmission ac grid and HVdc links is one of the solutions for stable operation of grid. Here, an integrated concept for integration of PV and ESS to transmission ac grid and HVdc links is proposed that is named as multi-port autonomous reconfigurable solar power plant (MARS). The proposed integrated development reduces the cost associated with respect to discrete development of PV-ESS systems connecting to transmission ac grid and HVdc links. The integrated development incorporates advanced control methods to provide inertial and primary frequency response, reactive power support, and transient stability to manage PV and ESS resources. In this paper, high-fidelity switched system model of the integrated system and grids are developed and detailed simulation results are provided to showcase the stable operation of the integrated system and provision of grid support functions.

14 SOLAR ENERGY↗

Energy Storage Sizing and Operation of an Integrated Utility-Scale PV+ESS Power Plant

Integration of an energy storage system (ESS) into a large-scale grid-connected photovoltaic (PV) power plant is highly desirable to improve performance of the system and overcome the stochastic nature of PV power generation. Algorithms to size ESS within an integrated PV and ESS ( PV+ESS) power plant, conventionally, require a large number of high-resolution samples of PV generation. These algorithms are computationally expensive. In this paper, a two-day optimization algorithm that utilizes n-step constant power output dispatch every day from the PV+ESS power plant is proposed to size the ESS. Additionally, an n-step power dispatch every day through the one-year timeframe based optimization of the size of ESS is also performed. The proposed methods are computationally cheaper and provide acceptable accuracy with respect to the conventional sizing methods. The economics identified from the proposed methods are compared with the typical day-ahead hourly dispatch-based power production from the PV+ESS power plant. This comparison has shown similar economic performance showcasing the accuracy of the proposed methods in sizing the ESS. It also shows the potential for operating PV+ESS power plant in n-step constant power generation mode.