Search NASA⌕ Search

Engineering topics

Arimoto, Y.

Publications and source records attributed to Arimoto, Y..

Design Study of a Superconducting Quadrupole Magnet System Sustainable Under Dark Current Heating in ILC Main Linac

The International Linear Collider (ILC) main linac comprises a series of 12 m-long cryomodules. The cryomodule contains eight 9-cell superconducting (SC) RF (SRF) cavities and an SC quadrupole magnet combined with dipole correctors to focus and steer electron and positron beams. The magnets are installed between the SRF cavity string and at the longitudinal center of a common cryomodule/cryostat. These magnets are conductively cooled by pure aluminum channels thermally connected to a 2 K two-phase helium pipe for cooling the SRF cavities. A recent study shows that field-emitted electrons, so-called “dark current” initiated in the SRF cavities, are transmitted through the SRF cavity string and reach the SC magnet. The energy is inevitably absorbed in the SC coil due to the magnetic field, resulting in risks of a quench caused by the coil heating. We are investigating alternate magnet designs by using Nb $_{3}$ Sn or $\text{MgB}_{2}$ SC and by adding the dark current absorber surrounding the beam-pipe to realize sustainable magnet operation under the dark current heating. We report the design study of the magnet system and interfaces to the cryomodule accommodating it with the SRF cavities.

43 PARTICLE ACCELERATORS↗

Study on Conduction Cooling of Superconducting Magnets for the ILC Main Linac

In the main linac of the International Linear Collider (ILC), superconducting magnets for beam focusing and steering will be located periodically in superconducting RF (SRF) cavity string for beam acceleration in common cryomodules. A concept of conduction cooling of the combined-functioned, splittable superconducting magnets has been proposed and investigated to adapt much different features and to meet different requirements for the superconducting magnet and SRF cavity in fabrication, assembly, and operation. It is required to integrate the superconducting magnet after the SRF cavity string assembly which completed under an ultra-clean environment. The magnet must be conductively cooled down through thermal links to a liquid helium supply pipe. According to this concept, a model magnet development was carried out in cooperation with Fermilab and KEK, and has been demonstrated in KEK superconducting RF test facility (STF). In addition, an important issue has been recently identified. High gradient SRF cavities naturally emit field emission electron flux from the inner surface, so-called dark current. It may pass through the subsequent SRF cavity string and penetrate into the superconducting magnets placed downstream. It may heat up the superconducting coils, and may cause a quench. Therefore, further study on reliable conduction cooling and to secure the superconducting magnet operation with a keeping sufficient safety margin is quite essential. In this paper, we report the installation, the improvement achieved in STF, and the R&D progress in the study on the conduction cooling of the superconducting magnet for the ILC main linac.

43 PARTICLE ACCELERATORS↗

SuperKEKB beam final focus superconducting magnet system

The SuperKEKB was designed and constructed as the upgraded accelerator of KEKB. In this accelerator design, the nano-beam scheme of collision was applied and a luminosity of 8 x10 35 cm -2 s -1 was targeted. In the design, the beam final focus system was the key component in the accelerator hardware elements. This final focus system consists of 55 superconducting magnets. In this paper, the designs of the magnets, the cryostats and the cryogenic system are shown, and the field measurement results are reported. The SuperKEKB beam operation with the final focus system started on 2018 March 19, and the magnet quench events up to 2020 December 16 are described.

43 PARTICLE ACCELERATORS↗

Reduction of ETS-VI Laser Communication Equipment Optical-Downlink Telemetry Collected During GOLD

Free-space laser communications experiments were conducted between the laser communication equipment (LCE) on board the Japanese Engineering Test Satellite VI (ETS-VI) and the ground station located at the Table Mountain Facility (TMF) during late 1995 and early 1996. This article describes the on-line data reduction process used to decode LCE telemetry (called E2) downlinked on the optical carrier during the Ground/Orbiter Lasercomm Demonstration (GOLD) experiments. The LCE has the capability of transmitting real-time sensor and status information at 128 kbps by modulating the onboard diode laser. The optical downlink was detected on the ground, bit synchronized, and the resulting data stream stored on a data recorder. The recorded data were subsequently decoded by on-line data processing that included cross-correlation of the known telemetry data format and the downlink data stream. Signals obtained from the processing can be useful not only in evaluating the characteristics of the LCE but also in understanding uplink and downlink signal quality.

Toyoshima, M.↗

Preliminary Results of the Ground/Orbiter Lasercomm Demonstration Experiment between Table Mountain and teh ETS-V1 Satellite

The Ground/Orbiter Lasercomm Demonstration (GOLD) is an optical communications demonstration between the Japanese Engineering Test Satellite (ETS-V1) and an optical ground transmitting and receiving station at the Table Mountain FAcility in Wrightwood California. Laser transmissions to the satellite are performed approximately four hours every third night when the satellite is at apogee above Table Mountain.

optical communications 2-way optical communication↗