Search NASASearch

Engineering topics

Armando Delgado

Publications and source records attributed to Armando Delgado.

Rocket Propulsion Test Design and Analysis

As the small satellite launch vehicle (SSLV) market grows and NASA continues to prepare for upcoming missions in the Artemis program, John C. Stennis Space Center’s (SSC) testing facilities must adapt to the increasing demand in liquid rocket engine testing. The Rocket Propulsion Test Design and Analysis Project for this rotation focused in both of this areas through two separate subprojects, the creation of a Private Rocket Engine Database and the automatization of the A1-Set Point Prediction Model. To identify the testing requirements of future Stennis Space Center (SSC) costumers, an excel spread sheet was commissioned as a database to collect technical and non-technical features of over one hundred privately developed liquid and hybrid rocket engine. Similarly, The A-1 Set Point Sheet Model is used to satisfy Aerojet Rocketdyne’s testing requirements of Net Positive Suction Pressure (NPSP) for the RS-25 staged combustion cycle engine. To expand the capabilities of this prediction model, a feed back loop was programmed to automate the search of setpoints using Excel Visual Basic for Applications (VBA).

John Paul Ortiz

High Pressure Vent Line Mishap: Investigation Summary

During testing on the E-1 Test Stand, the High Pressure (HP) Liquid Hydrogen (LH) vent line was displaced off its supports, damaging the expansion joints (EJ), piping, and pipe supports of the line. The damage to the vent line is believed to have occurred during Cell 3 testing on Thursday, September 21, during the first test of the day. The fuel systems being used for Cell 3 testing are connected to the LP and HP LH Vent systems and are being used in Liquid Natural Gas (LNG) service. The Cell 3 interface bleed valve that discharges to the HP LH Vent system was inadvertently left at 100% open during the chill-in process for longer than the typical amount of time. Since this valve is usually at a lower set point or intermittently closed during the chill-in process, more than the typical amount of LNG flowed into the vent line as pre-test procedures continued as normal. The open bleed valve was noticed before test preparations were completed and prior to refilling of the HP LH Tank before test. The test sequence was started, run, and shutdown normally. Video of the flare stack showed an atypical discharge of liquid at the flare stack exit. Pressure downstream of the Cell 3 interface bleed valve (a valve connected to the southernmost part of the vent system) spiked to a higher-than-normal level. No evidence of damage was captured at the time of the event. The system was used in a typical fashion after the event and for 4 subsequent tests on Thursday and Friday, before the damage was observed. A drive-by inspection of the flare stack was performed on Friday (September 22nd) morning before sunrise and before test activities began, but no damage of the vent line was observed at that time. No abnormal system behavior was observed during testing on Friday. The damage was discovered and reported to NASA Test Operations on Monday, initiating the Incident Response Team. The Mishap appointment letter was issued September 27th to formally initiate the Mishap Investigation.

LNG