Estimating Prices of Products

Company-wide or process-wide production simulated. Price Estimation Guidelines (IPEG) program provides simple, accurate estimates of prices of manufactured products. Simplification of SAMIS allows analyst with limited time and computing resources to perform greater number of sensitivity studies. Although developed for photovoltaic industry, readily adaptable to standard assembly-line type of manufacturing industry. IPEG program estimates annual production price per unit. IPEG/PC program written in TURBO PASCAL.

Aster, R. W.

Sensitivity analysis for solar plates

Economic evaluation methods and analyses of emerging photovoltaic (PV) technology since 1976 was prepared. This type of analysis was applied to the silicon research portion of the PV Program in order to determine the importance of this research effort in relationship to the successful development of commercial PV systems. All four generic types of PV that use silicon were addressed: crystal ingots grown either by the Czochralski method or an ingot casting method; ribbons pulled directly from molten silicon; an amorphous silicon thin film; and use of high concentration lenses. Three technologies were analyzed: the Union Carbide fluidized bed reactor process, the Hemlock process, and the Union Carbide Komatsu process. The major components of each process were assessed in terms of the costs of capital equipment, labor, materials, and utilities. These assessments were encoded as the probabilities assigned by experts for achieving various cost values or production rates.

Aster, R. W.

Price Estimation Guidelines

Improved Price Estimation Guidelines, IPEG4, program provides comparatively simple, yet relatively accurate estimate of price of manufactured product. IPEG4 processes user supplied input data to determine estimate of price per unit of production. Input data include equipment cost, space required, labor cost, materials and supplies cost, utility expenses, and production volume on industry wide or process wide basis.

Chamberlain, R. G.

Flat-plate module efficiency versus cost tradeoffs

The Five Year Research Plan energy cost methodology and in depth analyses based on the extensive data that are relevant to PV systems are used to facilitate the accomplishment of the $0.15/kWh energy cost goal. An equation is given for the five year energy cost methodology. The allocation guidelines are designed to be consistent with flat solar array (FSA) milestones for module cost, module efficiency, and the programmatic goal for energy cost. They are research targets that appear to be achievable, given prior accomplishments and planned activities in the areas of low cost silicon purification, low cost sheet material, high efficiency cell processing, low cost, long life encapsulants, and automated fabrication method. Extensive sensitivity analysis work has been performed that shows that these guidelines represent an efficient way to meet the intent of the DOE program.

Aster, R. W.

Economic implications of current systems

The primary goals of this study are to estimate the value of R&D to photovoltaic (PV) metallization systems cost, and to provide a method for selecting an optimal metallization method for any given PV system. The value-added cost and relative electrical performance of 25 state-of-the-art (SOA) and advanced metallization system techniques are compared.

Daniel, R. E.

Automation of the longwall mining system

Cost effective, safe, and technologically sound applications of automation technology to underground coal mining were identified. The longwall analysis commenced with a general search for government and industry experience of mining automation technology. A brief industry survey was conducted to identify longwall operational, safety, and design problems. The prime automation candidates resulting from the industry experience and survey were: (1) the shearer operation, (2) shield and conveyor pan line advance, (3) a management information system to allow improved mine logistics support, and (4) component fault isolation and diagnostics to reduce untimely maintenance delays. A system network analysis indicated that a 40% improvement in productivity was feasible if system delays associated with all of the above four areas were removed. A technology assessment and conceptual system design of each of the four automation candidate areas showed that state of the art digital computer, servomechanism, and actuator technologies could be applied to automate the longwall system.

Zimmerman, W.

Project analysis and integration area

A simulation program that investigates the relationship between manpower requirements and equipment availability in the presence of scheduled and unscheduled maintenance is presented. A method for optimization of metallization patterns is presented.

Aster, R. W.

SAMICS: Input data preparation

The Solar Array Manufacturing Industry Costing Standards (SAMICS) provide standard formats, data, assumptions, and procedures for estimating the price that a manufacturer would have to charge for the product of a specified manufacturing process sequence. A line-by-line explanation is given of those standard formats which describe the economically important characteristics of the manufacturing processes and the technological structure of the companies and the industry. This revision provides an updated presentation of Format A Process Description, consistent with the October 1978 version of that form. A checklist of items which should be entered on Format A as direct expenses is included.