Search NASA⌕ Search

Engineering topics

Atwood, Corwin L.

Publications and source records attributed to Atwood, Corwin L..

Developing Component-Specific Prior Distributions for Common Cause Failure Alpha Factors

This report presents the development of component-specific common cause failure (CCF) prior distributions for five component categories: pump, valve, strainer, generator, and other. For ease in comparing these component-specific CCF priors with the 2015 generic CCF priors, the same method used to develop the 2015 generic CCF priors was also employed in this report, along with the same set of failure data (1997–2015) featured in INL/EXT-21-43723. For selected CCF templates, this report also evaluates the effects of applying component-specific priors to CCF parameters.

99 GENERAL AND MISCELLANEOUS↗

Developing Generic Prior Distributions for Common Cause Failure Alpha Factors and Causal Alpha Factors

This report is a revision of the original report, INL/LTD-17-43723. Distribution of the original report was to the Nuclear Regulatory Commission (NRC) only, and the report was not made available to the public. The original report was revised as this report for public distribution. This report presents the latest update of generic prior distributions for common cause failure (CCF) alpha factors, as well as the development of new generic prior distributions for CCF causal alpha factors. The history of CCF treatment and parameter estimations is reviewed. The existing process for developing generic prior distributions is reviewed and used to develop new priors for CCF alpha factors and causal alpha factors. For causal alpha factors, different priors are developed for the five different CCF cause groups: Component (GC), Design (GD), Environment (GE), Human (GH), and Other (GO). These generic prior distributions could be used in the Standardized Plant Analysis Risk (SPAR) models for CCF parameter estimation. The issues and preliminary thoughts regarding prior distribution development are documented. Potential future work is then proposed for improving the process of developing priors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗