Search NASA⌕ Search

Engineering topics

Atz, Milos I.

Publications and source records attributed to Atz, Milos I..

A Framework to Assess Advanced Reactor Spent Fuel Management Facility Deployment

Advanced nuclear reactors offer various operational advantages over existing light water reactors but could produce types of spent nuclear fuel (SNF) with a wide variety of forms and characteristics depending on how many different concepts are deployed. Each advanced reactor SNF type potentially poses unique management challenges. New planning efforts will be necessary to anticipate how the management requirements of advanced reactor SNF will affect the deployment of an integrated waste management system. This paper applies a framework of high-level facility deployment milestones to a generic SNF management system, reviewing them together with the advanced reactor SNF characteristics and management requirements. This allows for the investigation of factors that influence facility and system deployment, and ultimately, the identification of challenges facing the deployment of different kinds of SNF management facilities. Here, the back end of the once-through fuel cycle is examined for four advanced reactor system technology types: sodium-cooled fast reactors, high-temperature gas-cooled reactors, liquid-fuel molten salt reactors, and lead-cooled fast reactors. It is observed that milestones earlier in the facility deployment process (e.g., siting and facility design) are more impacted by the uniqueness of advanced reactor SNF characteristics than others (e.g., construction and testing). Ultimately, none of the differences are seen as fundamentally disqualifying in a technical sense; however, they should be considered early, potentially as part of reactor design, to avoid issues in the future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Framework to Assess Advanced Reactor Spent Fuel Management Facility Deployment

Previous planning and prioritization for LWR SNF management investigated the risks and uncertainties of deploying facilities such as consolidated interim storage [1, 2, 3, 4]. As part of that work, activities and milestones were collected into success precedence diagrams that charted a path to achieving facility deployment [1]. In that framework, activities are any research, development, design, or decision required to achieve an intermediate goal; milestones are activity endpoints and mark the completion of deliverables. Milestones can be thought of as achievements required to reach the final goal of facility deployment; activities are the means by which milestones are accomplished. In planning, activities and milestones are compiled into comprehensive flow charts that visualize the steps necessary for deployment. This framework has been used to quantify risks, timelines, and costs of deploying SNF management facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗