An Overview of the U.S. Department of Energy's GeoVision Report: Preprint

The U.S. Department of Energy's (DOE's) Geothermal Technologies Office (GTO) engaged in a multiyear research collaboration among national laboratories, industry experts, and academia to identify a vision for growth of the domestic geothermal industry across a range of geothermal energy types. The effort, called the GeoVision analysis, assessed opportunities to expand geothermal energy deployment by improving technologies, reducing costs, and mitigating barriers. The analysis also evaluated the economic and environmental impacts of such deployment - including industry growth, consumer energy prices, water use, and air emissions - and investigated opportunities for desalination, mineral recovery, and hybridization with other energy technologies for greater efficiencies and lower costs. The GeoVision analysis used a suite of modeling tools and scenarios to evaluate the performance of geothermal technologies relative to other energy technologies. The assessment included evaluating the potential role of existing and future geothermal deployment in both the electric sector and the heating and cooling sector. In the electric sector, the GeoVision analysis considered electricity generation from existing conventional (hydrothermal) geothermal resources as well as unconventional geothermal resources, such as enhanced geothermal systems (EGS). In the heating and cooling sector, the analysis modeled geothermal heat pumps (GHPs, also called ground source heat pumps) and district-heating systems using both conventional and EGS resources. The analysis culminated in a summary report, GeoVision: Harnessing the Heat Beneath Our Feet (DOE 2019), as well as eight supporting task force reports (Lowry et al. 2017, Doughty et al. 2018, Wendt et al. 2018, Augustine et al. 2019, Liu et al. 2019, McCabe et al. 2019, Millstein et al. 2019, Young et al. 2019). Among other results, key findings of the analysis indicate that optimized permitting could potentially double geothermal capacity by 2050; technology improvements could increase geothermal power generation nearly 26-fold from today; and increased geothermal deployment can provide economic and environmental benefits to the United States. The analysis also concludes that GHPs can provide heating and cooling solutions to the equivalent of 28 million households and geothermal district-heating systems could experience exponential growth - from 21 installations today to 17,500 nationwide. In addition to summarizing analytical results about geothermal energy opportunities, the report includes a Roadmap of actionable items on which the stakeholder community can engage to achieve the outcomes of the analysis. The GeoVision Roadmap is a comprehensive call to action to encourage and guide stakeholders toward the shared goal of realizing the deployment levels and resulting benefits identified in the GeoVision analysis.

15 GEOTHERMAL ENERGY↗

2018 Research Highlight in Manufacturing: Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

Currently, geothermal project developers customize the size of the power plant to fit the resource being developed. The turbine is designed and sized to optimize efficiency and resource utilization for electricity production; most often, other power plant components are then chosen to complement the turbine design. These custom turbine designs demand one-off manufacturing processes, which result in higher manufacturing setup costs, longer lead-times, and higher capital costs overall in comparison to larger-volume line manufacturing processes. In contrast, turbines produced in standard increments, manufactured in larger volumes, could result in lower costs per turbine. In this study, we developed a manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. Then we used discounted cash flow (DCF) analysis to calculate the minimum sustainable price (MSP). We analyzed three different cases 1) 1 MWe geothermal ORC turboexpander 2) 5 MWe ORC turboexpander and 3) 20 MWe geothermal steam turbine, and calculated the cost of manufacturing the major components, such as the impellers/blades, shaft/rotor, nozzles, inlet guide lanes, disks, and casings. The results showed that MSP could highly vary between 893 $/kW and 30 $/kW based on turbine size, standardization and volume of manufacturing. The analysis also showed that the economy of scale applies both to the size of the turbine and the number manufactured in a single run. As an example, the unit price of a 5 MW standard design turbine could be 150 $/W cheaper than the custom design. Sensitivity analysis indicated that these savings come largely from reduced labor costs for design and engineering and manufacturing setup. In addition to manufacturing cost savings, there is a delivery time saving up to 10 months, which could have a positive effect to construction financing operation time. Another advantage of these standard turbines is their adaptability to different geothermal systems by operating at off-design conditions. We also modeled off-design turbine efficiencies within the commercially-favorable operating range of a standard ORC compared to custom-designed ORC equipment. Than we used these performance calculations and power output capacities in a discounted cash flow (DCF) analysis of plant operations and financing, thereby creating representative techno economic models of a total geothermal power plant. I this scope we used NREL's System Advisor model (SAM) and performed DCF analysis of standard and custom design turbines using results from IPSEpro over range of temperatures of interest. In this scope 63 different off-design cases were analyzed. This helped us to answer the question; 'Can today`s capital cost savings compensate the future revenue losses due to lower electricity generation?' The results showed that, the net capital cost savings for the modeled 5 MW case study may reach up to +$1,298,672. Also, the difference between NPV of standard design and custom design turbine could reach up to +$733,940. To sum up, when all the things mentioned above are taken into consideration, it can be said that, the standard turbines are competitive over a wide range of temperatures and flow rates and the give positive NPV differences for certain cases near their design point.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2017 Annual Technology Baseline

Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), the National Renewable Energy Laboratory annually provides an organized and centralized set of such cost and performance data. The ATB uses the best information from the Department of Energy national laboratories' renewable energy analysts as well as information from the Energy Information Administration for fuel-based technologies. The ATB has been reviewed by experts and it includes the following electricity generation technologies: land-based wind, offshore wind, utility-scale solar photovoltaics (PV), commercial-scale solar PV, residential-scale solar PV, concentrating solar power, geothermal power, hydropower, coal, natural gas, nuclear, and conventional biopower. This webinar presentation introduces the 2017 ATB.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines: Preprint

The global geothermal electricity market has significantly grown over the last decade and is expected to reach a total installed capacity of 18.4 GWe in 2021 (GEA, 2016). Currently, geothermal project developers customize the size of the power plant to fit the resource being developed. In particular, the turbine is designed and sized to optimize efficiency and resource utilization for electricity production; most often, other power plant components are then chosen to complement the turbine design. These custom turbine designs demand one-off manufacturing processes, which result in higher manufacturing setup costs, longer lead-times, and higher capital costs overall in comparison to larger-volume line manufacturing processes. In contrast, turbines produced in standard increments, manufactured in larger volumes, could result in lower costs per turbine. This study focuses on analysis of the global supply chain and manufacturing costs for Organic Rankine Cycle (ORC) turboexpanders and steam turbines used in geothermal power plants. In this study, we developed a manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. We analyzed three different cases 1) 1 MWe geothermal ORC turboexpander 2) 5 MWe ORC turboexpander and 3) 20 MWe geothermal steam turbine, and calculated the cost of manufacturing the major components, such as the impellers/blades, shaft/rotor, nozzles, inlet guide lanes, disks, and casings. Then we used discounted cash flow (DCF) analysis to calculate the minimum sustainable price (MSP). MSP is the minimum price that a company must sell its product for in order to pay back the capital and operating expenses during the plant lifetime (CEMAC, 2017). The results showed that MSP could highly vary between 893 dollar/kW and 30 dollar/kW based on turbine size, standardization and volume of manufacturing. The analysis also showed that the economy of scale applies both to the size of the turbine and the number manufactured in a single run. Sensitivity analysis indicated these savings come largely from reduced labor costs for design and engineering and manufacturing setup.

15 GEOTHERMAL ENERGY↗

Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

The global geothermal electricity market has significantly grown over the last decade and is expected to reach a total installed capacity of 18.4 GWe in 2021 (GEA, 2016). Currently, geothermal project developers customize the size of the power plant to fit the resource being developed. In particular, the turbine is designed and sized to optimize efficiency and resource utilization for electricity production; most often, other power plant components are then chosen to complement the turbine design. These custom turbine designs demand one-off manufacturing processes, which result in higher manufacturing setup costs, longer lead-times, and higher capital costs overall in comparison to larger-volume line manufacturing processes. In contrast, turbines produced in standard increments, manufactured in larger volumes, could result in lower costs per turbine. This study focuses on analysis of the global supply chain and manufacturing costs for Organic Rankine Cycle (ORC) turboexpanders and steam turbines used in geothermal power plants. In this study, we developed a manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. We analyzed three different cases 1) 1 MWe geothermal ORC turboexpander 2) 5 MWe ORC turboexpander and 3) 20 MWe geothermal steam turbine, and calculated the cost of manufacturing the major components, such as the impellers/blades, shaft/rotor, nozzles, inlet guide lanes, disks, and casings. Then we used discounted cash flow (DCF) analysis to calculate the minimum sustainable price (MSP). MSP is the minimum price that a company must sell its product for in order to pay back the capital and operating expenses during the plant lifetime (CEMAC, 2017). The results showed that MSP could highly vary between 893 dollar/kW and 30 dollar/kW based on turbine size, standardization and volume of manufacturing. The analysis also showed that the economy of scale applies both to the size of the turbine and the number manufactured in a single run. Sensitivity analysis indicated these savings come largely from reduced labor costs for design and engineering and manufacturing setup.