Search NASASearch

Engineering topics

Austin Decker

Publications and source records attributed to Austin Decker.

Artemis I Prelaunch Flight Readiness Analysis

The Prelaunch loads analysis traditionally captures the vehicle and Mobile Launcher (ML) loads associated with stacking in the Vehicle Assembly Building (VAB), rollout to the pad, and high-speed winds while out on the pad prior to liftoff. The following paper details the methodology used in this analysis for loads for the Artemis Flight Readiness assessment. This paper focuses on the stacking and assembly loads, the loads induced by fueling, and the load seen during rollout to the pad. Methods for integrating multiple structural models in dynamic simulations using interface forces, constraint modes, and residual vectors is discussed. Both linear and nonlinear responses are addressed. Simulation results are compared to measured data from the Dynamic Rollout Test (DRT) and Wet Dress Rehearsal (WDR).

SLS

Methodology and Development of SLS Ascent Boost Phase Loads

The methodologies and development of the loads experienced in the boost phase of ascent flight of the NASA Space Launch System (SLS) Block I vehicle will be presented in this paper. As is common practice, a series of fixed time/mass finite element models of the vehicle were developed for the purpose of evaluating the structural loads and accelerations for particular Mach ranges associated with the boost phase of flight. Load contributors, which vary between Mach bins, include the flight mechanics induced portion of the loads (e.g., Static-Elastic (STEL) or Vehicle Load Indicator (VLI) tool results), gust loads, buffet loads, solid rocket motor thrust oscillations, maneuvering loads, and preplanned test input induced loads. Each of these load contributors will be examined in this paper, as well as the boost phase loads combination equation used to generate the final loads.

SLS

Methodology and Development of SLS Liftoff Loads

The methodologies and development of the loads experienced during liftoff of the NASA SLS Block I vehicle will be presented in this paper. The liftoff loads analysis traditionally captures the dynamics of vehicle/pad separation after engine/booster ignition coupled with other launch day environments like wind, overpressure, and engine side loads. Additionally, the liftoff analysis includes an on-pad engine shutdown prior to booster ignition. The SLS liftoff analysis is performed using a Monte Carlo analysis and this paper will explore the Monte Carlo process and the statistical approach to calculating the limit loads.

SLS

Methodology and Development of SLS Ascent Loads

The methodology and development of the Space Launch System (SLS) Block 1 Boost and Core phase Ascent loads will be presented in this paper. As is common practice, a series of fixed time/mass Finite Element Models of the vehicle were developed for the purpose of evaluating the structural loads and accelerations for particular Mach or time ranges associated with the Boost and Core phases of flight. Load contributors, which vary between bins, include the flight mechanic induced portion of the loads (e.g., Static-Elastic (STEL) or Vehicle Load Indicator (VLI) tool results), gust loads, buffet loads, Solid Rocket Booster thrust oscillations, Core Stage Engine thrust oscillations, maneuvering loads, thrust vector-related dispersions, and Programmed Test Input induced loads. Each of these load contributors will be examined in this paper, as well as the Loads Combination Equations used to generate the final loads. In addition to the typical coupled loads analysis, an Ascent loads evaluation is included in the SLS Artemis 1 Day of Launch process; a summary of this evaluation will also be presented in this paper.

SLS

In-Space Loads Analysis of SLS/Orion

This presentation summarizes the in-space loads analysis performed on the SLS/Orion to support the Artemis I Flight Readiness Analysis Cycle.

SLS

Space Launch System: SLS Real Time Rollout Monitoring for MPCV

The NASA Space Launch System (SLS) rocket, Orion spacecraft, and Mobile Launcher (ML) are transported to Pad 39B from the Vehicle Assembly Building on a large, tracked vehicle known as the Crawler Transporter (CT). The CT is a holdover from the Apollo and Space Shuttle programs but has been extensively upgraded to accommodate the SLS. The Dynamic Rollout Test (DRT) on March 17, 2022 marked the first full rollout of the SLS and ML. Analysis indicated that loads and vibrations would be well below design limits, but out of an abundance of caution it was decided to monitor the response in real time during the rollout to assure that loads remained within predicted limits. This first rollout was outfitted with extensive test instrumentation such as accelerometers, pressure sensors, and strain gauges. This instrumentation remained in place following the integrated vehicle modal test and was being used for additional Operational Modal Analysis (OMA) during the rollout in addition to the real-time monitoring. This presentation discusses the specific loads and accelerations monitored during the rollout, how and why those responses were chosen, and how the system was implemented. Finally, a post-rollout loads reconstruction is used to assess the process and the analysis tools used for the rollout analysis.

SLS

Space Launch System Day of Launch Loads for Artemis I

NASA’s Space Launch System (SLS) was successfully launched on November 16, 2022. During the years leading up to the first flight, Artemis I, a DOLILU (Day of Launch I-Load Update) process was developed to design, verify, and upload the first stage flight trajectory on day-of-launch to ensure a safe flight. The evaluation of integrated vehicle loads is a key component of the DOLILU process. The SLS Artemis I DOL loads project has involved methodology development, software development, software testing and certification, operator training, and simulation and launch support. The resulting DOL process successfully calculated loads for all launch opportunities within the window, with the robust nature of the process contributing to all opportunities being go for loads.

SLS

Space Launch System Artemis I Ascent Loads Reconstruction Summary

On November 16, 2022, NASA successfully launched the Space Launch System (SLS) rocket and Orion spacecraft for the first SLS mission, Artemis 1. This first flight was outfitted with Developmental Flight Instrumentation (DFI) such as accelerometers, pressure sensors, and strain gauges. The DFI supports many post-flight activities, one of which is the ascent loads reconstruction effort. The integrated vehicle ascent loads spans both boost phase and Core phase and often produces the largest loads experienced by the vehicle during flight. One of the primary goals of the ascent loads reconstruction is to evaluate applicable Coupled Loads Analysis (CLA) design math models, assumptions, and analysis methodologies. To achieve this goal, all significant ascent subevents have been reconstructed through the use of flight data, reconstructed inputs, and existing CLA simulations. Resulting responses have been compared to available flight measurements. Additionally, reconstructed subevent loads were combined and compared to appropriate flight data and pre-flight predictions.

SLS

SLS Payload Launch Loads Analysis Using the NTRC Method

Norton-Thevenin Receptance Coupling (NTRC), as described in several NASA Engineering and Safety Center (NESC) papers shows promise in enabling loads development for payloads with less computational cost and analyst time as compared to a full integrated vehicle coupled loads analysis (CLA). NTRC allows the free vehicle responses and impedance (accelerance) at the payload to vehicle interface (derived from integrated vehicle CLA) to be used with a payload model in a payload CLA. Due to the NTRC damping differing from the full integrated vehicle damping, results are slightly different, so coverage factors were developed to ensure NTRC results enveloped results from a traditional CLA. NTRC results with coverage factors were very close to full CLA results. The Space Launch System (SLS) coupled loads team has developed an implementation of the NTRC method to enable support of co-manifested payloads with analysis needs that do not fit the primary SLS load cycle schedule. The NTRC method was successfully used to support the European System Providing Refueling, Infrastructure, and Communications (ESPRIT) module for Gateway planned to fly on Artemis V and has been adopted as the SLS approach for supporting payload CLA requests that do not align with vehicle load cycles.

SLS

Application of Norton-Thevenin Receptance Coupling (NTRC) to Space Launch System (SLS) Payload Coupled Loads Analysis (CLA)

Norton-Thevenin Receptance Coupling (NTRC), as described in several NASA Engineering and Safety Center (NESC) papers shows promise in enabling loads development for payloads with less computational cost and analyst time as compared to a full integrated vehicle coupled loads analysis (CLA). NTRC allows the free vehicle responses and impedance (accelerance) at the payload to vehicle interface (derived from integrated vehicle CLA) to be used with a payload model in a payload CLA. Due to the NTRC damping differing from the full integrated vehicle damping, results are slightly different, so coverage factors were developed to ensure NTRC results enveloped results from a traditional CLA. NTRC results with coverage factors were very close to full CLA results. The Space Launch System (SLS) coupled loads team has developed an implementation of the NTRC method to enable support of co-manifested payloads with analysis needs that do not fit the primary SLS load cycle schedule. The NTRC method was successfully used to support the European System Providing Refueling, Infrastructure, and Communications (ESPRIT) module for Gateway planned to fly on Artemis V and has been adopted as the SLS approach for supporting payload CLA requests that do not align with vehicle load cycles.

SLS