NASA Exploration Systems Maintainability Standards for Artemis and Beyond

This assessment was requested by the NASA Engineering and Safety Center (NESC), which, based on findings from the NESC study “Safe Human Expeditions Beyond Low Earth Orbit (LEO)” (Valinia et al., 2022), determined its topic to be an underrecognized critical and urgent Agency need, due to impending Artemis vehicle procurements. The principal objective of this assessment was to review and update current Agency-level maintainability requirements for space systems to support crew on expeditions beyond LEO in both preventive and corrective maintenance. This report contains the results of the NESC assessment.

Orbital Replacement Units↗

Risk Trade-Space Analysis for Safe Human Expeditions to Mars

We assessed the integrated safety, health, and performance risk to crews on long-duration missions, specifically to Mars. Using a systems approach rather than one focused on individual countermeasures, we examined the trade space around several such risks to identify high-potential risk mitigation strategies and characterize aspects of Mars mission architectures that could lower aggregated risk. Current Mars Design Reference missions would require durations well over two years and would increase crew exposure to radiation and microgravity well beyond ISS levels, likely resulting in significantly reduced performance beyond our current capability to mitigate that could jeopardize mission success. A “fast Mars transit” round-trip mission concept was studied using an innovative flight dynamics approach to quantify the minimum total mission energy required for a Mars transit with total mission duration less than 400 days. This approach holds promise for sending humans to Mars and returning them safely with acceptable, potentially mitigatable, exposure to microgravity and radiation using current or near-term technologies. The fast transit concept would also result in fewer time-driven vehicle failures and enable sustainable deployment of humans and infrastructure to Mars on a regular cadence, allowing steady exploration and colonization of Mars. Finally, we conclude that reliance on the Low Earth Orbit (LEO) mission operations paradigm – i.e., one of near-complete real-time dependence on experts at Mission Control to manage the combined state of the mission, vehicle, and crew – is high risk given the communication delays and limited resupply of any Mars mission, and this risk is not eliminated by the shorter missions durations of fast transit scenarios. Based on historical trends, it is highly likely that the crew will face a high-consequence problem of uncertain origin during Mars transit when ground support will be greatly reduced. While it may be possible to reduce anomaly rates through improved reliability analysis and testing, and to reduce anomaly impacts through added robustness, such mitigations address only known failure modes and known uncertainties. Therefore, a radical shift in the Human-Systems Integration Architecture (HSIA) that defines the operational paradigm, systems design, and human-systems interactions is required to improve the risk posture to an acceptable level regardless of mission duration.

Mars↗

Unique Science from the Moon in the Artemis Era

Since the beginning of the space age, the Moon has been proposed as a platform for astronomy. The Moon provides unique capabilities for astrophysics observations. NASA’s Artemis plan to return humans to the Moon in the mid-2020s in a sustainable manner provides an opportunity to advance synergistic approaches between human and robotic exploration. This NASA Engineering and Safety Center (NESC) workshop assesses the feasibility and value proposition of using the Moon as a location for performing unique science observations, leveraging Artemis-era infrastructure while evaluating risks and key engineering challenges.

NASA Engineering and Safety Center↗

Safe Human Expeditions Beyond Low Earth Orbit (LEO)

The NASA Engineering and Safety Center (NESC) conducted an interdisciplinary study and workshop focusing on capabilities needed for crew health and safety on long-duration deep space expeditions in support of the Artemis Program and missions to Mars. The study focused on integration among four disciplines: 1) space weather monitoring and forecasting, 2) shielding technologies, 3) human health research, and 4) human factors engineering tools. An integrated risk assessment was performed to inform characteristics of mission architecture and capabilities needed for safe, long-duration human expeditions beyond low Earth orbit. This report contains the outcome of the NESC assessment.

Low Earth Orbit↗

Arecibo Observatory Auxiliary M4N Socket Termination Failure Investigation

The NASA Engineering and Safety Center (NESC) was requested to support the Arecibo Observatory failure investigation in determining the root cause of the Auxiliary M4N cable failure. The NESC and Kennedy Space Center led an integrated NASA investigation with support from Marshall Space Flight Center and The Aerospace Corporation that included forensic investigation of failed hardware, finite element modeling, materials characterization, and root cause analysis. This document contains the outcome of the NESC Assessment.

Zinc Spelter Sockets↗

The Role of NASA Engineering & Safety Center (NESC) in Advancing NASA's Earth Science Missions (Past, Present, and Future)

The NASA Engineering & Safety Center (NESC) was established in 2003 to provide an independent technical resource for the resolution of challenging technical problems (through the use of studies, analysis, tests, etc.). Since its inception, NESC has completed nearly 1000 technical assessments for NASA’s Human Exploration and Operation Mission Directorate (HEOMD), Science Mission Directorate (SMD), Space Technology Mission Directorate (STMD), and Aeronautics Research Mission Directorate (ARMD). Of the SMD related assessments, several were for the resolution of technical problems, analysis, or studies related to NASA’s Earth science missions in various phases of the project from design to operation. Some of the recent examples of NESC technical support for NASA (or NOAA) Earth science missions have been for: Soil Moisture Active Passive (SMAP), Deep Space Climate Observatory (DSCOVR), Cyclone Global Navigation Satellite System (CYGNSS), Ice, Cloud, and Land Elevation Satellite (ICESat-II), Joint Polar Satellite System (JPSS), and the soon to be launched collaboration mission with India, NASA-ISRO Synthetic Aperture Radar (NISAR). In this paper, we outline some of the technical challenges faced by these Earth science missions and describe how NESC contributed to their resolution. The case studies cover a wide range of disciplines involving space lidars, radars, electronics, attitude control systems, as well as Micrometeoroid Orbital Debris (MMOD) risk assessment impact to NASA missions. The efforts include strategies for risk mitigation, technical resolution of challenging problems, and failure root cause investigations combined with lessons learned reports to advance discipline knowledge, enhance NASA capabilities, and avoid future problems.

NASA↗

The Role of NASA Engineering & Safety Center (NESC) in Advancing NASA’s Astrophysics Missions (Past, Present, and Future)

The NASA Engineering & Safety Center (NESC) was established in 2003 (after the Columbia accident) to provide an independent technical resource for the resolution of challenging technical problems (through the use of studies, analysis, tests, etc.) for NASA programs and projects. Since its inception, NESC has completed nearly 1000 technical assessments for NASA’s Human Exploration and Operation Mission Directorate (HEOMD), Science Mission Directorate (SMD), Space Technology Mission Directorate (STMD), and Aeronautics Research Mission Directorate (ARMD). Of the SMD related assessments, several were for the resolution of technical problems, analysis, or studies related to NASA’s astrophysics missions in various phases of the project from design to operation. Some of the recent examples of NESC technical support for NASA astrophysics missions have been for: Hubble Space Telescope (HST), Chandra X-ray Observatory (CXO), Fermi Gamma-ray Space Telescope, Kepler Space Telescope, Transiting Exoplanet Survey Satellite (TESS), James Webb Space Telescope (JWST), and Laser Interferometer Space Antenna (LISA). In this paper, we outline some of the technical challenges faced by these astrophysics missions and describe how NESC contributed to their resolution. The case studies cover a wide range of disciplines involving space telescopes, detectors, lasers, and attitude control systems. These efforts include innovative solutions for extending the life of the missions, technical resolution of challenging problems, strategies for risk mitigation, and failure investigations combined with lessons learned reports to advance discipline knowledge, enhance NASA capabilities, and avoid future problems.

NASA↗

A Decade of NASA Strategic Astrophysics Technology Investments: Technology Maturation, Infusion, and Other Benefits

NASA’s Astrophysics Division (APD) funds development of cutting-edge technology to enable its missions to achieve ambitious and groundbreaking science goals. These technology development efforts are managed by the Physics of the Cosmos (PCOS), Cosmic Origins (COR), and Exoplanet Exploration (ExE) Programs. The NASA Strategic Astrophysics Technology (SAT) Program was established in 2009 as a new technology maturation program to fill the gap in the Technology Readiness Level (TRL) range from 3 to 6. Since program inception, 100 SAT grants have been openly competed and awarded, along with dozens of direct-funded projects, leading to a host of technologies advancing their TRLs and/or being infused into space and suborbital missions and ground-based projects. We present the portfolio distribution in terms of specific technology areas addressed, including optics, detectors, coatings, coronagraphs, starshades, lasers, electronics, cooling systems, and micro-thruster subsystems. We show an analysis of the rate of TRL advances, infusion success stories, and other benefits such as training the future astrophysics workforce, including students and postdoctoral fellows hired by projects. Finally, we present APD’s current strategic technology maturation priorities for investment, enabling a range of future strategic astrophysics missions

NASA, astrophysics, technology development, optics↗

Lessons Learned from the Arecibo Observatory Auxiliary M4N Socket Analysis and Implications for Future Observatory Designs

The Arecibo Observatory collapsed after a progressive structural failure stemming from the failure of a single socket joint cable termination. A failure investigation was conducted to identify the cause of the first failed cable termination socket. Due to the nature of the suspended observatory receiver, the dominant source of loading in the suspension cables was due to deadload, with secondary contributions coming from environmental effects and observatory operation. The high ratio of deadload vs. live load applied to the cable over many years resulted in a creep failure mode of the cast zinc within the socket which further induced stress into the highly stress wires at the entrance of the socket. The design of the socket joint did not explicitly consider socket constituent stress margins and time-dependent damage mechanisms such as creep. Lessons learned from this investigation led to recommendations for revising civil engineering cable standards, and recommendations for manufacturers and designers. The design of cables employing socket terminations should consider the cumulative damage effects from creep and cyclic loading identify their corresponding worst-case inspectable defects or establish a sufficiently high factor of safety so that the design is sufficiently robust to defects and time-dependent failure modes. The design should specify end-of-life capability and set service life inspection intervals with pass/fail inspection criteria. Finally, trial studies on design iterations were conducted to increase the reliability of cables with socket joints.

Pavel Babuska↗

Fast Earth-Mars Roundtrip Trajectories to Reduce Health and Safety Risks for Crewed Missions

The extended mission duration of a crewed Mars mission compounds integrated risks to crew health and safety. Shortening mission duration would therefore have a direct impact on reducing many human health and performance risk factors. This paper describes trajectory feasibility analyses performed to examine trajectory options for a fast crewed mission to Mars. Studies were conducted to examine options with short overall mission durations (≤ 400-day roundtrip) and options that focus on minimizing astronaut time in deep space, while allowing for longer Mars surface stays. Trade studies were performed to determine ∆v requirements for a range of launch dates, Mars orbit periods, Mars stay times, and Earth-to-Mars flight time maxima. The implications of a Venus gravity assist are also described. The analyses presented here build on and specifically aim to optimize and address key concerns of assumptions made in previously published studies of fast crewed Mars missions.

Mars↗