Search NASA⌕ Search

Engineering topics

Bachimanchi, R.

Publications and source records attributed to Bachimanchi, R..

The Continuous Electron Beam Accelerator Facility at 12 GeV

This review paper describes the energy-upgraded Continuous Electron Beam Accelerator Facility (CEBAF) accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing 88 superconducting cavities that have operated cw at an average accelerating gradient of 20 MV / m . After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for the beam delivered to each of the experimental halls are summarized in the Appendix. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Improved Beam Loss Accounting with Fast Data Acquisition (DAQ) Chassis

Identifying the source of beam loss events in the CE-BAF accelerator can be a challenging task. However, with our new prototype system, this task becomes more effi-cient. The system, developed in the fall of 2022, utilizes a dispersive beam position monitor (BPM) and the exist-ing switched electrode electronics BPM hardware. Previ-ously a commercial off-the-shelf data acquisition (DAQ) system was employed to capture BPM wire signals at a sample rate of 20 kS/s. The fast shutdown signal triggered the system, which disables the beam at the injector. Analysis of beam position and energy variation before a beam loss event was used to determine if the beam loss event was associated with an energy transient. The proto-type system, implemented using National Instruments hardware and LabVIEW® software, relied on a software trigger. Manual post-processing was required to ascertain whether the fault was due to an un-tripped cavity with a gradient or phase transient. This work focuses on deploying a Fast DAQ Chassis to monitor BPM hardware in real time and during beam loss events. This system was originally developed and in-stalled in CEBAF to monitor the time-domain RF control signals in the legacy analog RF systems. This technology was leveraged to also monitor BPM signals. As the new system employs a hardware trigger, developing tools to automatically identify faults linked to energy transients unrelated to cavity faults will be straightforward. This paper will discuss the project's initial updates, underlin-ing the crucial role of each member of our team in this achievement

Tiskumara, J.↗

First SELAP Algorithm Operational Experience of the New LLRF 3.0 RF Control System

The JLAB LLRF 3.0 system has been developed and is replacing the 30-year-old LLRF systems in the CEBAF accelerator. The LLRF system builds upon 25 years of design and operational RF control experience (digital and analog), and our recent collaboration in the design of the LCLSII LLRF system. The new system also incorporates a cavity control algorithm using a fully functional phase and amplitude locked Self Exciting Loop (SELAP). The first system (controlling 8 cavities) was installed and commissioned in August of 2021. Since then the new LLRF system has been operating with cavity gradients up to 20 MV/m, and electron beam currents up to 350 uA. This paper discusses the operational experience of the LLRF 3.0 SELAP algorithm along with other software and firmware tools like cavity and klystron characterization and quench detection.

Plawski, T. E.↗

Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility

Since the early 1990s, the in­jec­tor of the CEBAF ac­cel­er­a­tor at Jef­fer­son Lab has re­lied on a nor­mal-con­duct­ing RF graded-beta cap­ture sec­tion to boost the ki­netic en­ergy of the elec­tron beam from 100 / 130 keV to 600 keV for sub­se­quent ac­cel­er­a­tion using a cry­omod­ule hous­ing two su­per­con­duct­ing 5-cell cav­i­ties sim­i­lar to those used through­out the ac­cel­er­a­tor. To sim­plify the in­jec­tor de­sign and im­prove the beam qual­ity, the nor­mal-con­duct­ing RF cap­ture sec­tion and the cry­omod­ule will be re­placed with a new sin­gle booster cry­omod­ule em­ploy­ing a su­per­con­duct­ing, β = 0.6, 2-cell-cav­ity cap­ture sec­tion and a sin­gle, β = 0.97, 7-cell cav­ity. The Up­graded In­jec­tor Test Fa­cil­ity at Jef­fer­son Lab is cur­rently host­ing the new cry­omod­ule to eval­u­ate its per­for­mance with beam be­fore in­stal­la­tion at CEBAF. While demon­strat­ing sat­is­fac­tory per­for­mance of the booster and good agree­ment with sim­u­la­tions, our beam test re­sults also speak to lim­i­ta­tions of ac­cel­er­a­tor op­er­a­tions in a noisy, ther­mally un­reg­u­lated en­vi­ron­ment.

Bruker, M. W.↗

SRF Cavity Instability Detection with Machine Learning at CEBAF

During the operation of CEBAF, one or more unstable superconducting radio-frequency (SRF) cavities often cause beam loss trips while the unstable cavities themselves do not necessarily trip off. Identifying an unstable cavity out of the hundreds of cavities installed at CEBAF is difficult and time-consuming. The present RF controls for the legacy cavities report at only 1 Hz, which is too slow to detect fast transient instabilities. A fast data acquisition system for the legacy SRF cavities is being developed which samples and reports at 5 kHz to allow for detection of transients. A prototype chassis has been installed and tested in CEBAF. An autoencoder based machine learning model is being developed to identify anomalous SRF cavity behavior. The model is presently being trained on the slow (1 Hz) data that is currently available, and a separate model will be developed and trained using the fast (5 kHz) DAQ data once it becomes available. This paper will discuss the present status of the new fast data acquisition system and results of testing the prototype chassis. This paper will also detail the initial performance metrics of the autoencoder model.

Carpenter, A.↗

Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility

Since the early 1990s, the in­jec­tor of the CEBAF ac­cel­er­a­tor at Jef­fer­son Lab has re­lied on a nor­mal-con­duct­ing RF graded-beta cap­ture sec­tion to boost the ki­netic en­ergy of the elec­tron beam from 100 / 130 keV to 600 keV for sub­se­quent ac­cel­er­a­tion using a cry­omod­ule hous­ing two su­per­con­duct­ing 5-cell cav­i­ties sim­i­lar to those used through­out the ac­cel­er­a­tor. To sim­plify the in­jec­tor de­sign and im­prove the beam qual­ity, the nor­mal-con­duct­ing RF cap­ture sec­tion and the cry­omod­ule will be re­placed with a new sin­gle booster cry­omod­ule em­ploy­ing a su­per­con­duct­ing, β = 0.6, 2-cell-cav­ity cap­ture sec­tion and a sin­gle, β = 0.97, 7-cell cav­ity. The Up­graded In­jec­tor Test Fa­cil­ity at Jef­fer­son Lab is cur­rently host­ing the new cry­omod­ule to eval­u­ate its per­for­mance with beam be­fore in­stal­la­tion at CEBAF. While demon­strat­ing sat­is­fac­tory per­for­mance of the booster and good agree­ment with sim­u­la­tions, our beam test re­sults also speak to lim­i­ta­tions of ac­cel­er­a­tor op­er­a­tions in a noisy, ther­mally un­reg­u­lated en­vi­ron­ment.

Bruker, M. W.↗

SRF Cavity Instability Detection with Machine Learning at CEBAF

During the operation of CEBAF, one or more unstable superconducting radio-frequency (SRF) cavities often cause beam loss trips while the unstable cavities themselves do not necessarily trip off. Identifying an unstable cavity out of the hundreds of cavities installed at CEBAF is difficult and time-consuming. The present RF controls for the legacy cavities report at only 1 Hz, which is too slow to detect fast transient instabilities. A fast data acquisition system for the legacy SRF cavities is being developed which samples and reports at 5 kHz to allow for detection of transients. A prototype chassis has been installed and tested in CEBAF. An autoencoder based machine learning model is being developed to identify anomalous SRF cavity behavior. The model is presently being trained on the slow (1 Hz) data that is currently available, and a separate model will be developed and trained using the fast (5 kHz) DAQ data once it becomes available. This paper will discuss the present status of the new fast data acquisition system and results of testing the prototype chassis. This paper will also detail the initial performance metrics of the autoencoder model.

Carpenter, A.↗

JLAB LLRF 3.0 Development and Tests

The Jefferson Lab LLRF 3.0 system is being developed to replace legacy LLRF systems in the CEBAF accelerator. The new design builds upon 25 years of design and operational RF control experience, and our recent collaboration in the design of the LCLSII LLRF system. The new cavity control algorithm is a fully functional phase and amplitude locked Self Exciting Loop (SEL). This paper discusses the progress of the LLRF 3.0 hardware design, FPGA firmware development, User Datagram Protocol (UDP) operation, and recent LLRF 3.0 system tests on the CEBAF Booster cryomodule in the Upgrade Injector Test Facility (UITF).

Plawski, T. E.↗

The CLAS12 superconducting magnets

As part of the Jefferson Lab 12 GeV upgrade, the Hall B CLAS12 system requires two superconducting iron-free magnets — a torus and a solenoid. The physics requirements to maximize space for the detectors guided engineers toward particular coil designs for each of the magnets which, in turn, led to the choice of using conduction cooling. The torus consists of 6 trapezoidal NbTi coils connected in series with an operating current of 3770 A. The solenoid is an actively shielded 5 T magnet consisting of 5 NbTi coils connected in series operating at 2416 A. Within the hall, the two magnets are located in close proximity to each other and are completely covered both inside and outside by particle detectors. Stringent size limitations were imposed for both magnets and introduced particular design and fabrication challenges. This paper describes the design, construction, installation, commissioning, and operation of the two magnets.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Development of FPGA-based multi-sensor excitation low voltage (MSELV) chassis at Jefferson Lab

The design and development of the sensor excitation and read back chassis was driven by the requirements for the monitoring and control of two conduction-cooled superconducting magnets in Hall B for the 12 GeV accelerator upgrade. The torus and solenoid superconducting magnets require extensive instrumentation. Sensor selection was accomplished by applying Jefferson Lab’s (JLab) risk mitigation process, which employed a failure modes and effects analysis approach. The goal was to accommodate all sensor types for monitoring and control and to develop a generic multisensor excitation low voltage chassis that would be used across both magnet systems with a reduced set of functions. As a result, the chassis has been deployed in experimental Hall B at JLab and has been performing successfully since July 2016.

47 OTHER INSTRUMENTATION↗

Commissioning the JLab LERF Cryomodule Test Facility

The JLab Low Energy Recirculating Facility, LERF, has been modified to support concurrent testing of two LCLS-II cryomodules. The cryomodules are installed in a similar fashion as they would be in the L1 section of the LCLS-II linac, including the floor slope and using all of the LCLS-II hardware and controls for cryomodule cryogenics, vacuum, and RF (SSA and LLRF). From the start, it was intended to use LCLS-II electronics and EPICS software controls for cryomodule testing. In affect the LERF test facility becomes the first opportunity to commission and operate the LCLS-II LINAC hardware and software controls. Support for specific cryomodule high level test applications like Q0 and HOMs measurements, are being developed from the basic cryomodule control suite. To support the testing, 2 K He is supplied from the CEBAF south linac cryogenic system, where care must be taken when using the LERF test facility to not upset the CEBAF cryogenics plant. This paper discusses the commissioning of the hardware and software development for testing the first two LCLS-II cryomodules.

Hovater, C.↗