Informed Prosumer Aggregator Bidding Strategy via Incorporating Distribution Grid Outage Risk Predictions
Not Available
Engineering topics
Publications and source records attributed to Baembitov, Rashid.
Not Available
This report contains key findings from a project titled Big Data Synchrophasor Monitoring and Analytics for Resiliency Tracking (BDSMART), which was carried out through a collaborative effort of a team of researchers from Texas A&M Engineering Experiment Station, Temple University, and Quanta Technology, LLC. The in-kind support came from OSIsoft (acquired by AVEVA), which provided their PI Historian software to demonstrate the use case of streaming PMU data. The first section of the report describes the project goals and objectives related to the development of Machine Learning (ML) models capable of detecting and classifying events by processing phasor measurements captured in the field by Phasor Measurement Units (PMUs). The data for this study was contributed by the utilities/ISOs from the Western and Eastern interconnects and ERCOT, further referred to as Interconnect B (IC B), Interconnect A (IC A), and Interconnect C (IC C), respectively. The approach that the BDSMART Research Team proposed and the key research tasks defined by the team are outlined in this section. The next section describes the technical approach. We first discuss the data constraints related to the PMU measurements and data interpretation constraints imposed by the data contributors. They provided neither the topological information of the grid nor PMU placement locations and captured recorded data at very few locations in the system with the reporting rate of either 30 or 60 fps. The recordings are mostly positive sequence voltage, frequency, and ROCOF, and in some limited cases, three-phase voltages and currents. We then reflect on the bad data issues that stem from poor recording practices and vague definitions of the PMU status bits to supposedly be used for bad data identification. Finally, the data discovery points to imprecise time stamps with incomplete event start/end time, as well as inconsistent and incomplete event labeling, which combined make the implementation of the data models using supervising learning quite challenging. Following the data discovery study, we hypothesize that because the IC B data has the most complete labels, we should focus our model development on that data and then test it on data from other interconnects. We also define the common metrics used to evaluate the results from the ML algorithm tests. We concluded this section by summarizing the common ML models we used and explaining how we implemented and tested them. The issues from this section are expanded in the Training Dataset Report from this project. The final section of this report deals with the accomplishments and conclusions. As the accomplishments, we formulate the problem we are solving and what is achieved by solving the problem. We then reflect on each of the analytics tools we developed and point out the performance of each tool when applied to solving the mentioned problems. We reference this work for further details to the papers we published on each tool. In the conclusions, we give recommendations on how to improve future PMU recording practices to facilitate the ML algorithm implementation and guidance for the future standardization work aimed at clarifying the ambiguities associated with the PMU status bits. We finally list future tasks that can bring about further improvements in the proposed algorithms. The issues from this section are expanded in the Training, and Test Dataset Report filed at the project completion date.
This paper describes simple and efficient machine learning (ML) methods for efficiently detecting multiple types of power system events captured by PMUs scarcely placed in a large power grid. It uses a single feature from each PMU based on a rectangle area enclosing the event in a given data window. This single feature is sufficient to enable commonly used ML models to detect different types of events quickly and accurately. The feature is used by five ML models on four different data-window sizes. The results indicated a tradeoff between the execution speed and detection accuracy in variety of data-window size choices. The proposed method is insensitive to most data quality issues typical for data from field PMUs, and thus it does not require major data cleansing efforts prior to feature extraction.
This paper describes simple and efficient machine learning (ML) methods for efficiently detecting multiple types of power system events captured by PMUs scarcely placed in a large power grid. It uses a single feature from each PMU based on a rectangle area enclosing the event in a given data window. This single feature is sufficient to enable commonly used ML models to detect different types of events quickly and accurately. The feature is used by five ML models on four different data-window sizes. The results indicated a tradeoff between the execution speed and detection accuracy in variety of data-window size choices. Here, the proposed method is insensitive to most data quality issues typical for data from field PMUs, and thus it does not require major data cleansing efforts prior to feature extraction.
A novel method for fast extraction of fundamental frequency events (FFE) based on measurements of frequency and rate of change of frequency by Phasor Measurement Units (PMU) is introduced. The method is designed to work with exceptionally large historical PMU datasets. Statistical analysis was used to extract the features and train Random Forest and Catboost classifiers. The method is capable of fast extraction of FFE from a historical dataset containing measurements from hundreds of PMUs captured over multiple years. The reported accuracy of the best algorithm for classification expressed as Area Under the receiver operating Characteristic curve reaches 0.98, which was obtained in out-of-sample evaluations on 109 system-wide events over 2 years observed at 43 PMUs. Then Minimum Volume Enclosing Ellipsoid Algorithm was used to further analyze the events. 93.72% events were correctly characterized, where average duration of the event as seen by the PMU was 9.93 sec.