Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Continuous-time look-ahead flexible ramp scheduling in real-time operation

This paper develops a novel continuous-time look-ahead optimization model for co-optimizing balancing energy and flexible ramp products in real-time power systems operation. In addition, a continuous-time day-ahead operation model is developed to commit and schedule an adequate subset of generating units for providing balancing energy and ramping requirements in real-time operation. The up and down flexible ramp products are defined as continuous-time decision trajectories that continuously supply the real-time up and down ramping requirements of the system. The deliverability of flexible ramp products is secured through reserving the respective power requirements in generation capacity constraints of generating units. A function space solution method is proposed to reduce the dimensionality of day-ahead and real-time models through projecting them into finite-dimensional function spaces spanned by Bernstein polynomials, where the real-time operation decisions are modeled with a higher accuracy level than day-ahead decisions. Simulations are conducted on the IEEE-RTS system using CAISO load data, and the numerical results showcase the effectiveness of the proposed model in supplying the energy and flexible ramp requirements and avoiding ramping scarcity in the system, while reducing the operation costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗