Search NASA⌕ Search

Engineering topics

Bank, Jason

Publications and source records attributed to Bank, Jason.

Improving Solar and Solar+Storage Screening Techniques to Reduce Utility Interconnection Time and Costs (Final Technical Report)

Residential PV installations have increased rapidly over the last decade, and the increased application volume has caused permitting delays and lower overall adoption rates. In this project, we developed and evaluated whether data-driven secondary modeling and screening techniques can help utilities assess customer applications more accurately than traditional screening shortcuts. Secondary topologies are predicted using decision trees and commonly available information, such as service transformer, customer, and street locations. Conductors were predicted using a logistic regression method based on real world object (RWO) types, service transformer ratings, conductor length, and distance to transformer. After developing the combined primary and secondary distribution network model, hosting capacity results were used to train a random forest model to predict the pass/fail likelihood of a customer application. Powerflow based models with predicted secondaries and data-driven methods both increased the screening success rate, relative to common utility heuristics, by as much as 55 percentage points. Data-driven screening techniques were described by one utility as a "right-sized" approach for residential customers given the low-risk of small errors and the high-cost of accurate modeling.

14 SOLAR ENERGY↗

Supervised Learning for Distribution Secondary Systems Modeling: Improving Solar Interconnection Processes

The current interconnection process and hosting capacity analysis for distributed energy resources (DERs), such as photovoltaics (PV) and battery energy storage systems, are based on analyzing grid network constraints (voltage and thermal) using only medium-voltage distribution network models. This is because most utilities do not have secondary low-voltage system models that connect service transformers and residential customers. This is important because in many cases the main impact of interconnecting DERs could occur on the low-voltage distribution systems. This paper proposes a supervised learning method to approximate local secondary models to improve the interconnection process. The proposed supervised learning method includes a decision tree model that predicts the secondary topology and a logistic regression model that predicts conductor types. The case studies demonstrate the benefits of including secondary low-voltage circuits in the interconnection process. We report the proposed modeling methodology is readily scalable and thus can reduce the cost and effort of PV interconnection for the industry and stakeholders.

14 SOLAR ENERGY↗

Model-Based Integrated High Penetration Renewables Planning and Control Analysis

Increasing adoption of Solar Photovoltaic (PV) generation at the distribution level poses several changes for the reliable operation of electrical power distribution systems. The addition of a significant amount of PV to a distribution network can introduce a variety of operational problems, including steady-state overvoltages, reverse flows, voltage flicker and excessive controller movement among others. These adverse impacts can be mitigated through a variety of equipment upgrades which represent a cost to either the electric utility or the owner of the PV site. The study performed here aims to quantify the levels of PV generation which present operational problems on a distribution circuit and how those problems might be alleviated. The study performed here included 20 distribution feeders selected from Pepco Holdings, Inc. (PHI) service territory. These feeders are located in the states of Delaware, Maryland and New Jersey. A hosting capacity study was performed on each feeder to determine how much additional PV it could support in its current configuration. Several improvements were then performed on these circuits including phase balancing, capacitor redesign, reducing the voltage regulator set points, fixed power factor operation on the PV inverters and the installation of battery storage. After each of these improvements the hosting capacity of the circuit was reevaluated in order to determine how that particular improvement impacted the amount of PV that could be hosted by the circuit. Each of these improvements represents a real cost in terms of labor and equipment in order to be implemented. They are expected to provide a benefit in terms of the amount of additional PV generation which can be safely interconnected to the distribution feeder. A cost benefit analysis was performed in order to evaluate the expected costs of each feeder improvement and how each one was able to increase the PV hosting capacity of each feeder. It is hoped that these results can be utilized by other distribution utilities in order to understand how they can improve the hosting capacity of their feeders and facilitate the deployment of more PV generation at the distribution level. Admittedly other utility companies will most likely have different feeder architectures and differing labor and equipment costs so the realized cost benefit numbers may be significantly different.

14 SOLAR ENERGY↗

High Penetration Photovoltaic Case Study Report

Technical concerns with integrating higher penetrations of photovoltaic (PV) systems include grid stability, voltage regulation, power quality (voltage rise, sags, flicker, and frequency fluctuations), and protection and coordination. The current utility grid was designed to accommodate power flows from the central generation source to the transmission system and eventually to the distribution feeders. At the distribution level, the system was designed to carry power from the substation toward the load. Renewable distributed generation, particularly solar PV, provides power at the distribution level challenging this classical paradigm. As these resources become more commonplace the nature of the distribution network and its operation is changing to handle power flow in both directions. A large portion of distribution system components, including voltage regulators and protection systems, were not designed to coordinate with bidirectional power flow and bidirectional fault currents from distributed generation and PV systems in particular. Coordinating these devices in the presence of high penetration PV areas introduces additional challenges to feasibility and system impact studies. Some cases require modification of existing protection schemes, additional distribution equipment, or reactive power requirements on the PV inverters. This report is focused on large PV installations in which penetration is significantly greater than 15% of maximum daytime feeder load. To date the impact on the electric utility and its customers has not been problematic in any of these cases. The PV system installations described in this report exceeds what most experts consider high penetration scenarios. The voltage, power quality, and other operating parameters have been maintained within the required ranges with minimal negative impact on distribution operations and utility customers. These case studies are intended to demonstrate success stories with integration of large PV plants at the distribution level as well as some of the solutions used by the utility to ensure safe, reliable operation of both the PV system and the distribution network.

14 SOLAR ENERGY↗

Extraction and Visualization of Power System Interarea Oscillatory Modes

Interarea oscillatory modes pose a threat to power system stability. An algorithm is presented for the identification and analysis of such modes from high resolution phasor measurement data. The entire process is outlined including data collection, conditioning, extraction of the primary oscillatory frequency, and determination of participating areas of the system. Additionally a visualization methodology is presented which displays these results. Using the tools developed here the dominant modes and their associated regions of influence in a power system can be determined directly from measurement data.

24 POWER TRANSMISSION AND DISTRIBUTION↗