Performance of PIP-II high-beta 650 cryomodule after transatlantic shipping

After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.

43 PARTICLE ACCELERATORS↗

Integration of a new Cryogenic Liquefier into the IB-1 Cryogenic Test Facility

The increase over the last years of the testing activities related to quantum systems, SRF cavities for the PIP-II and the LCLS-II projects, as well as superconducting magnets for the HL-LHC project and Fusion research activities, has required the addition of a new Helium cryogenic plant into the existing IB-1 Industrial Cryogenic Test Facility. The new cryogenic plant is composed of a cryogenic liquefier (Cold Box) able to provide up to 340 L/h, a 4 kL Dewar and two Mycom ® compressors providing up to 120 g/s. AL-AT (Air Liquide Advanced Technologies) has taken part of this project by designing and manufacturing the cryogenic liquefier. This new cryogenic plant is connected through a cryogenic distribution system to a 10 kL Dewar, which is part of the existing cryogenic test facility, itself composed of another Cold Box and a Sullair ® compressor. The new cryogenic plant has two main operating modes: one allows to transfer liquid helium at 1.7 bar between the two Dewars, the other allows to transfer supercritical Helium at 2 bar or more between the new Cold Box and the 10 kL Dewar. The entire industrial cryogenic facility is handled by a common Inventory Control System, composed of three control valves, and 9 tanks giving a total buffer volume of more than 1000 m3. This paper presents the technical features of the new Helium cryogenic plant, as well as the main results of the liquefier commissioning phase and details of the helium transfer between the two Dewars, making the connection between the cryogenic plants at the IB-1 Industrial Cryogenic Test Facility.

43 PARTICLE ACCELERATORS↗

Conservation of Helium while Maintaining High System Purity

Recent helium shortages and helium price increases have lead to an increased emphasis being placed on conserving helium. The need to conserve helium must be balanced with need to maintain the high levels of purity necessary to prevent operational problems caused by contamination. Helium losses and contamination control are especially important for test stands that have cryogenic distribution systems operating continuously with frequent changeover of cryogenic temperature components that are being tested. This paper describes a mathematical model to estimate the quantity of helium lost and the purity of the helium after the pump and backfill procedure is complete. The process to determine the optimal time during pump down to cut off pumping and start backfilling is described. There is a tradeoff between trying to achieve the lowest possible pressure during pumping and the quantity of air leaking into the volume while pumping is occurring. An additional benefit of careful sel ection of pump and backfill parameters in conjunction with real-time pressure monitoring can reduce the labor and time required to complete a successful pump and backfill procedure. This paper is intended to be a tool for engineers to review their pump and backfill procedures and measured data to optimize helium losses, system purity, and labor required.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Integration of a new Cryogenic Liquefier into the IB-1 Cryogenic Test Facility

aThe increase over the last years of the testing activities related to superconducting quantum materials, SRF cavities for the PIP-II and the LCLS-II projects, as well as superconducting magnets for the HL-LHC project and Fusion research activities, has required the addition of a new Helium cryogenic plant into the existing IB-1 Industrial Cryogenic Test Facility. The new cryogenic plant is composed of a cryogenic liquefier (Cold Box) able to provide up to 340 L/h, a 4kL Dewar and two Mycom compressors providing up to 120 g/s. AL-AT (Air Liquide Advanced Technologies) has taken part of this project by designing and manufacturing the cryogenic liquefier. This new cryogenic plant is connected through a cryogenic distribution system to a 10 kL Dewar, which is part of the existing cryogenic test facility, itself composed of another Cold Box and a Sullair compressor. The new cryogenic plant has two main operating modes: one allows to transfer liquid helium at 1.7 bar between the two Dewars, the other allows to transfer supercritical Helium at 2 bar or more between the new Cold Box and the 10 kL Dewar. The entire industrial cryogenic facility is handled by a common Inventory Control System, composed of three regulatory valves, and 9 tanks giving a total buffer volume of more than 1000 m3. This paper presents the technical features of the new Helium cryogenic plant, as well as the main results of the liquefier commissioning phase and details of the helium transfer between the two dewars, making the connection between the cryogenic plants at the IB-1 Industrial Cryogenic Test Facility.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗