Search NASA⌕ Search

Engineering topics

Barklow, Tim

Publications and source records attributed to Barklow, Tim.

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Beam delivery and beamstrahlung considerations for ultra-high energy linear colliders

As part of the Snowmass'21 community planning excercise, the Advanced Accelerator Concepts (AAC) community proposed future linear colliders with center-of-mass energies up to 15 TeV and luminosities up to 50 × 1034 cm -2 s -1 in a compact footprint. In addition to being compact, these machines must also be energy efficient. We identify two challenges that must be addressed in the design of these machines. First, the Beam Delivery System (BDS) must not add significant length to the accelerator complex. Second, beam parameters must be chosen to mitigate beamstrahlung effects and maximize the luminosity-per-power of the machine. In this paper, we review advances in plasma lens technology that will help to reduce the length of the BDS system, and we detail new Particle-in-Cell simulation studies that will provide insight into beamstrahlung mitigation techniques. We apply our analysis to both $e$ + $e$ - and $γγ$ colliders. The challenges and solutions described in this paper are considered independently. In conclusion, a unified, self-consistent concept for a BDS system for a 15 TeV linear collider will be the subject of future work.

47 OTHER INSTRUMENTATION↗

Accelerators for Electroweak Physics and Higgs Boson Studies

We discuss the goals, the designs, the state of technical readiness, and the critical R&D needs of the accelerators that are currently under discussion as Higgs and electroweak factories. We also address the respective staging options enabling future energy-frontier colliders. The accelerators covered are based on many different techniques and approaches. They include several circular colliders, various linear colliders, colliders based on energy recovery linacs (ERLs), ERL-ring combinations, as well as γγ colliders. The linear colliders proposed consist of options for the International Linear Collider (ILC), for the Compact Linear Collider (CLIC), for the Cold Copper Collider (C 3 ), and for the more recent Higgs-Energy Lepton Collider (HELEN). ERLs are key components of the Recycling Linear e + e - Collider (ReLiC),of the Energy Recovery Linear Collider (ERLC), and of the Circular Energy Recovery Collider (CERC). Among the more conventional ring colliders the following proposals are featured: the Future Circular Collider (FCC-ee), the Circular Electron Positron Collider (CEPC), the Electron Positron Circular Collider at Fermilab (EPCCF), and the Large Electron Positron collider #3 (LEP-3). In addition, we consider the X-ray FEL based gamma- gamma Collider Higgs Factory (XCC) and the High-Energy High-Luminosity γ-γ collider (HE&HL γγ). Finally, a Higgs factory based on a circular muon collider is mentioned for completeness.

43 PARTICLE ACCELERATORS↗