Search NASA⌕ Search

Engineering topics

Barzi, E.

Publications and source records attributed to Barzi, E..

At least 37 records · Page 2

Advancing Superconducting Magnet Diagnostics for Future Colliders

Future colliders will operate at increasingly high magnetic fields pushing limits of electromagnetic and mechanical stress on the conductor [1]. Understanding factors affecting superconducting (SC) magnet performance in challenging conditions of high mechanical stress and cryogenic temperatures is only possible with the use of advanced magnet diagnostics. Diagnostics provide a unique observation window into mechanical and electromagnetic processes associated with magnet operation, and give essential feedback to magnet design, simulations and material research activities. Development of novel diagnostic capabilities is therefore an integral part of next-generation magnet development. In this paper, we summarize diagnostics development needs from a prospective of the US Magnet Development Program (MDP), and define main research directions that could shape this field in the near future.

43 PARTICLE ACCELERATORS↗

Development of a Small-Aperture Cos-theta Dipole Insert Coil Based on Bi2212 Rutherford Cable and Stress Management Structure

The U.S. Magnet Development Program (US-MDP) is developing high-field accelerator magnets with magnetic fields beyond the limits of Nb3Sn technology based on high temperature superconductor Bi 2 Sr 2 CaCu 2 O 8-x (Bi2212). However, Bi2212 wires and cables are sensitive to transverse stresses and strains, which are substantial in high-field accelerator magnets. To prevent large degradation of the Bi2212 coils and achieve the required field quality, an innovative design which provides turn positioning during coil fabrication and operation and manage azimuthal and radial strains/stresses in the coil has been proposed at FNAL. This paper describes the development of a small-aperture two-layer Bi2212 dipole coil with stress management. The main parameters of the Bi2212 wire and Rutherford cable, the design of coil stress management structure and its plastic model, the coil mechanical analysis in the dipole mirror configuration are presented and discussed.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

High Energy & High Luminosity $\gamma \gamma$ Colliders

With the best of modern standard lasers, high-energy $\gamma\gamma$ colliders from electron beams of E larger than 250 GeV are possible at the expense of photon luminosity, i.e. 10 times lower than for photon colliders at c.m. energies below 0.5 TeV. This Snowmass21 Contributed Paper shows how Free Electron Lasers (FEL) pave the way for High Energy & High Luminosity $\gamma\gamma$ colliders. We present and assess a conceptual design study of the Free Electron Laser that would be required for high luminosity $\gamma\gamma$ colliders as second interaction region of 0.5 TeV to 10 TeV c.m. $e^+e^-$ colliders.

43 PARTICLE ACCELERATORS↗

Promising Technologies and R&D Directions for the Future Muon Collider Detectors

Among the post-LHC generation of particle accelerators, the muon collider represents a unique machine with capability to provide very high energy leptonic collisions and to open the path to a vast and mostly unexplored physics programme. However, on the experimental side, such great physics potential is accompanied by unprecedented technological challenges, due to the fact that muons are unstable particles. Their decay products interact with the machine elements and produce an intense flux of background particles that eventually reach the detector and may degrade its performance. In this paper, we present technologies that have a potential to match the challenging specifications of a muon collider detector and outline a path forward for the future R&D efforts.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Towards 20 T Hybrid Accelerator Dipole Magnets

We report the most effective way to achieve very high collision energies in a circular particle accelerator is to maximize the field strength of the main bending dipoles. In dipole magnets using Nb-Ti superconductor the practical field limit is considered to be 8-9 T. When Nb 3 Sn superconductor material is utilized, a field level of 15-16 T can be achieved. To further push the magnetic field beyond the Nb 3 Sn limits, High Temperature Superconductors (HTS) need to be considered in the magnet design. The most promising HTS materials for particle accelerator magnets are Bi2212 and REBCO. However, their outstanding performance comes with a significantly higher cost. Therefore, an economically viable option towards 20 T dipole magnets could consist in an “hybrid” solution, where both HTS and Nb3Sn materials are used. We discuss in this paper preliminary conceptual designs of various 20 T hybrid magnet concepts. After the definition of the overall design criteria, the coil dimensions and parameters are investigated with finite element models based on simple sector coils. Preliminary 2D cross-section computation results are then presented and three main layouts compared: cos-theta, block, and common-coil. Both traditional designs and more advanced stress-management options are considered.

43 PARTICLE ACCELERATORS↗

Test of Superconducting Wires and Rutherford Cables With High Specific Heat

High-field accelerator magnets made of state-of-the-art Nb 3 Sn Rutherford cables demonstrate relatively long trainings due to sudden heat depositions originated by thermo-mechanical perturbations in the magnet coils. Coil sensitivity to these perturbations can be reduced by increasing the specific heat, Cp, of major coil components - strands, or whole cable, or epoxy. The R&D on all these three approaches is in progress. This paper studies feasibility of increasing the Cp of Rutherford-type cables by using a thin composite Cu/Gd 2 O 3 tape. The tape can be either wrapped around the cable, placed on the cable wide faces under the insulation, and/or inserted as a core. In this work, Cu/Gd 2 O 3 ribbons with ~30% of Gd 2 O 3 powder and two different thicknesses were produced by Hyper Tech Research, Inc. Wire and cable samples outfitted with these high-Cp ribbons, or tapes, were prepared and tested at FNAL for the Minimum Quench Energy (MQE). At 80%Ic, the MQE gain average over the tested magnetic field range of the NbTi cable with high-Cp tape on both sides was ~1.3. The MQE gain average of the NbTi wire wrapped with the high-Cp ribbon was 3.1.

43 PARTICLE ACCELERATORS↗

Field Measurement Results of the 15 T Nb 3 Sn Dipole Demonstrator MDPCT1b

A 15 T Nb 3 Sn dipole with cos-theta-type coils was developed to demonstrate a possible magnet design for a post-LHC proton-proton Collider. The magnet has 4-layer coils with 60-mm aperture, and has graded current density between the inner and outer layers to maximize performance. The coils are constrained by vertically-split, thick iron laminations, connected by aluminum Iclamps, and a thick stainless-steel skin. The magnet was previously tested at the Vertical Magnet Test Facility (VMTF) at Fermilab with reduced pre-load, and achieved record 14.1 T fields at maximum current. Now the magnet has been reassembled with full pre-load and has been cryogenically retested at VMTF. We report here on the magnetic measurements results of these tests, including field strength, geometrical harmonics, coil magnetization, and iron saturation characteristics of the demonstrator.

43 PARTICLE ACCELERATORS↗

Reassembly and Test of High-Field Nb3Sn Dipole Demonstrator MDPCT1

In the framework of the U.S. Magnet Development Program (MDP), Fermilab has developed and tested a high-field Nb$_3$Sn dipole demonstrator MDPCT1 for a post-LHC Hadron Collider. The magnet was first assembled with a lower coil pre-load to minimize the risk of coil damage during assembly and test. In the first test the magnet reached its test goal producing a world record field of 14.1 T at 4.5 K. Next the magnet was reassembled with nominal pre-load to achieve its design field limit of 15 T. This paper describes the details of MDPCT1 inspection, design modifications and reassembly. The magnet quench performance, including training, ramp rate and temperature dependences in the temperature range of 1.9-4.5 K, is presented and discussed.

43 PARTICLE ACCELERATORS↗

Involving the new generations in particle physics endeavours

Since 1984 INFN and University of Pisa scientists performing experiments at Fermilab have been running a two-month summer training program for Italian students at the lab. In 1984 the program involved only a few physics students from the University of Pisa, but it was later extended to other INFN groups and to engineering students. Since 2004 the program has been supported in part by the US Department of Energy (DOE) in the frame of an exchange agreement with INFN and has been run by the Cultural Association of Italians at Fermilab (CAIF). In 2007 the Sant’Anna School of Advanced Studies (Pisa) established an agreement with Fermilab to share the cost of four engineering students each year. In the almost 40 years of its history, the program has hosted at Fermilab approximately 550 Italian students from more than 20 Italian universities and from some non-Italian universities. In addition, in the years 2010-2019, with the support of the Italian National Institute of Astrophyics (INAF), the Italian Space Agency (ASI), and CAIF, 30 students were hosted in other US laboratories and universities. The Fermilab training programs spanned from data analysis to design and construction of particle detectors and accelerator components, R/D on superconductive elements, theory of accelerators, and analysis of astrophysical data. At the other US laboratories the offered training was on Space Science. In 2015 the University of Pisa endorsed the program as one of its own Summer Schools. The interns are enrolled as Pisa students for the duration of the internship. They are required to write summary reports published in the Fermilab and University of Pisa web pages. Upon positive evaluation by a University board, students are acknowledged 6 ECTS credits. The entire program is expected to expand further under CAIF management. An agreement has been signed between ASI and CAIF, for ASI to support yearly three two-months fellowships in US space science. In the following we inform on student recruiting, training programs, and final evaluation

Barzi, E.↗

Development and First Test of the 15 T Nb$_3$Sn Dipole Demonstrator MDPCT1

Fermilab in the framework of the U.S. Magnet Devel-opment Program (MDP) has developed a Nb$_3$Sn dipole demonstrator for a post-LHC hadron collider. The magnet uses 60-mm aperture 4-layer shell-type graded coils. The cable in the two inner-most layers has 28 strands 1.0 mm in diameter and the cable in the two outermost layers has 40 strands 0.7 mm in diameter. An inno-vative mechanical structure based on aluminum I-clamps and a thick stainless steel skin is used to preload Nb$_3$Sn coils and support large Lorentz forces. The maximum field for this magnet is limited by 15 T due to mechanical considerations. The first magnet assembly was done with lower coil pre-load to achieve 14 T and minimize the risk of coil damage during assembly. This paper describes the magnet design and the details of its assembly procedure, and re-ports the results of its cold tests.

43 PARTICLE ACCELERATORS↗

Development and First Test of the 15 T Nb 3 Sn Dipole Demonstrator MDFCT1

Fermilab in the framework of the U.S. Magnet Development Pro-gram (US-MDP) has developed and fabricated a 15 T Nb 3 Sn dipole demonstrator for a post-LHC hadron collider. In June 2019 the magnet was tested and reached a world record field in the aperture of 14.1T at 4.5 K.

43 PARTICLE ACCELERATORS↗

First Field Quality Measurements of a 15 T Nb3Sn Dipole Demonstrator

Outline: Data collection; Magnetic Measurement System; Measurement sensitivity; Centering Corrections; Measurement discussion; Transfer Function (magnitude of the field); Loop (Dynamic effects, eddy current); Z-scan (behavior along magnet length); Harmonics from Stair Step (geometric harmonics); Comparison with Simulation; Decay and Snapback; Summary

43 PARTICLE ACCELERATORS↗

Advantage and Challenges of $Nb_3Sn$ Superconducting Undulators

Utilization of Nb3Sn superconducting wires offers the possibility to increase undulators’ nominal operation field and temperature margin, but requires overcoming chal-lenges that are described in this paper. The achievable field levels for a Nb3Sn version of superconducting undulators being developed at APS-ANL and the conductor choice are also presented and discussed.

Zlobin, A. V.↗

Field Quality Measurements in the FNAL Twin-Aperture 11 T Dipole for LHC Upgrades

FNAL and CERN are developing an 11 T Nb3Sn dipole suitable for installation in the LHC to provide room for additional collimators. Two 1 m long collared coils previously tested at FNAL in single-aperture dipole configuration were assembled into the twin-aperture configuration and tested including magnet quench performance and field quality. The results of magnetic measurements are reported and discussed in this paper.

43 PARTICLE ACCELERATORS↗

Development of a 15 T Nb 3 Sn accelerator dipole demonstrator at Fermilab

Here, a 100 TeV scale Hadron Collider (HC) with a nominal operation field of at least 15 T is being considered for the post-LHC era, which requires using the Nb 3 Sn technology. Practical demonstration of this field level in an accelerator-quality magnet and substantial reduction of the magnet costs are the key conditions for realization of such a machine. FNAL has started the development of a 15 T Nb 3 Sn dipole demonstrator for a 100 TeV scale HC. The magnet design is based on 4-layer shell type coils, graded between the inner and outer layers to maximize the performance and reduce the cost. The experience gained during the Nb 3 Sn magnet R&D is applied to different aspects of the magnet design. This paper describes the magnetic and structural designs and parameters of the 15 T Nb 3 Sn dipole and the steps towards the demonstration model fabrication.

43 PARTICLE ACCELERATORS↗

The 11 T dipole for HL-LHC: Status and plan

The upgrade of the Large Hadron Collider (LHC) collimation system includes additional collimators in the LHC lattice. The longitudinal space for these collimators will be created by replacing some of the LHC main dipoles with shorter but stronger dipoles compatible with the LHC lattice and main systems. The project plan comprises the construction of two cryoassemblies containing each of the two 11-T dipoles of 5.5-m length for possible installation on either side of interaction point 2 of LHC in the years 2018-2019 for ion operation, and the installation of two cryoassemblies on either side of interaction point 7 of LHC in the years 2023-2024 for proton operation. The development program conducted in conjunction between the Fermilab and CERN magnet groups is progressing well. The development activities carried out on the side of Fermilab were concluded in the middle of 2015 with the fabrication and test of a 1-m-long two-in-one model and those on the CERN side are ramping up with the construction of 2-m-long models and the preparation of the tooling for the fabrication of the first full-length prototype. The engineering design of the cryomagnet is well advanced, including the definition of the various interfaces, e.g., with the collimator, powering, protection, and vacuum systems. Several practice coils of 5.5-m length have been already fabricated. This paper describes the overall progress of the project, the final design of the cryomagnet, and the performance of the most recent models. Furthermore, the overall plan toward the fabrication of the series magnets for the two phases of the upgrade of the LHC collimation system is also presented.

43 PARTICLE ACCELERATORS↗

Nb 3 Sn RRP® strand and Rutherford cable development for a 15 T dipole demonstrator

Keystoned Rutherford cables made of 28 strands and with a stainless steel core were developed and manufactured using 1 mm Nb3Sn composite wires produced by Oxford Superconducting Technology with 127 and 169 restacks using the Restacked-Rod-Process ® . Furthermore, the performance and properties of these cables were studied to evaluate possible candidates for 15 T accelerator magnets.

43 PARTICLE ACCELERATORS↗