Search NASA⌕ Search

Engineering topics

Bayati, Ilmas

Publications and source records attributed to Bayati, Ilmas.

The IEA Wind Task 49 Reference Floating Wind Array Design Basis

International Energy Agency Wind Technology Collaboration Programme (IEA Wind) Task 49 on Integrated Design of Floating Wind Arrays is an international collaboration aiming to advance the development of large-scale floating wind farms by providing open-access resources to the research and development and planning communities. The work of Task 49 focuses on array-level challenges related to the colocation of many floating wind turbines; their layouts, mooring systems, and cabling systems; failure risks; logistical considerations; marine spatial planning needs; and future research needs and innovation directions. This report provides a general design basis for the development of reference floating wind farm designs. These reference array designs will extend the scope of existing reference floating wind turbine designs to facilitate research on array-level floating wind technology challenges and innovations. The design basis promotes coordination and consistency in developing the reference array designs.

17 WIND ENERGY↗

Verification of a Numerical Model of the Offshore Wind Turbine from the Alpha Ventus Wind Farm Within OC5 Phase III: Preprint

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project, is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project analyzes the Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. This paper shows results of the verification of the OWT models (code-to-code comparison). A subsequent publication will focus on their validation (comparison of simulated results to measured physical system response data). Based on the available data, the participants of Phase III set up numerical models of the OWT in their simulation tools. It was necessary to verify and to tune these models. The verification and tuning were performed against an OWT model available at the University of Stuttgart - Stuttgart Wind Energy (SWE) and documentation provided by Senvion and OWEC Tower. A very good match was achieved between the results from the reference SWE model and models set up by OC5 Phase III participants.

17 WIND ENERGY↗

Verification of a Numerical Model of the Offshore Wind Turbine From the Alpha Ventus Wind Farm Within OC5 Phase III

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project, is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project analyzes the Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. This paper shows results of the verification of the OWT models (code-to-code comparison). A subsequent publication will focus on their validation (comparison of simulated results to measured physical system response data). Based on the available data, the participants of Phase III set up numerical models of the OWT in their simulation tools. It was necessary to verify and to tune these models. The verification and tuning were performed against an OWT model available at the University of Stuttgart - Stuttgart Wind Energy (SWE) and documentation provided by Senvion and OWEC Tower. A very good match was achieved between the results from the reference SWE model and models set up by OC5 Phase III participants.

17 WIND ENERGY↗