Search NASA⌕ Search

Engineering topics

Becht, P.

Publications and source records attributed to Becht, P..

56 records · Page 4

Measurement of inclusive charged-particle b-jet production in pp and p-Pb collisions at $\sqrt{s_{\mathrm{NN}}}$ = 5.02 TeV

A measurement of the inclusive b-jet production cross section is presented in pp and p-Pb collisions at $\sqrt{s_{NN}}$ = 5.02 TeV, using data collected with the ALICE detector at the LHC. The jets were reconstructed in the central rapidity region |η| < 0.5 from charged particles using the anti-k T algorithm with resolution parameter R = 0.4. Identification of b jets exploits the long lifetime of b hadrons, using the properties of secondary vertices and impact parameter distributions. The p T -differential inclusive production cross section of b jets, as well as the corresponding inclusive b-jet fraction, are reported for pp and p-Pb collisions in the jet transverse momentum range 10 ≤ p T,ch jet ≤ 100 GeV/c, together with the nuclear modification factor, $R^{b-jet}_{pPb}$. The analysis thus extends the lower p T limit of b-jet measurements at the LHC. The nuclear modification factor is found to be consistent with unity, indicating that the production of b jets in p-Pb at $\sqrt{s_{NN}}$ = 5.02 TeV is not affected by cold nuclear matter effects within the current precision. The measurements are well reproduced by POWHEG NLO pQCD calculations with PYTHIA fragmentation.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The upgrade of the ALICE TPC with GEMs and continuous readout

The upgrade of the ALICE TPC will allow the experiment to cope with the high interaction rates foreseen for the forthcoming Run 3 and Run 4 at the CERN LHC. In this article, we describe the design of new readout chambers and front-end electronics, which are driven by the goals of the experiment. Gas Electron Multiplier (GEM) detectors arranged in stacks containing four GEMs each, and continuous readout electronics based on the SAMPA chip, an ALICE development, are replacing the previous elements. The construction of these new elements, together with their associated quality control procedures, is explained in detail. Finally, the readout chamber and front-end electronics cards replacement, together with the commissioning of the detector prior to installation in the experimental cavern, are presented. After a nine-year period of R&D, construction, and assembly, the upgrade of the TPC was completed in 2020.

47 OTHER INSTRUMENTATION↗