Search NASA⌕ Search

Engineering topics

Beckers, Koenraad J

Publications and source records attributed to Beckers, Koenraad J.

Modeling and Simulating Diffused Aeration for Hydrogen Removal from Expansion Tanks of Parabolic Trough Solar Thermal Power Plants

High-temperature decomposition of organic heat transfer fluids (HTFs) can cause hydrogen build-up in the receiver annulus of parabolic trough power plants. This build-up increases the receiver thermal losses and results in a decline in power output. Prior work has shown that removal of hydrogen from the expansion tank can be an effective mitigation strategy. This paper presents a modeling methodology and simulation results for passive and diffused aeration removal of hydrogen from the expansion tank. Focus is on estimating the mass transfer of hydrogen from the HTF into the headspace gas across the surface and bubble liquid/gas interfaces. Simulations for the operation conditions and expansion tank geometry of the Nevada Solar One power plant (located near Las Vegas, Nevada, USA) show that passive removal (surface mass transfer only) may be sufficient to obtain hydrogen removal rates of 1.7 x 10-4 mol/s (minimal removal rate necessary). A diffused aeration system (surface plus bubble mass transfer) with gas injection volume rates up to 100 L/s may be necessary to obtain a hydrogen removal rate of 2.0 x 10-4 mol/s (optimal removal rate).

14 SOLAR ENERGY↗

Technical Requirements for Geothermal Resource Confirmation

In 2017-2018, the Bureau of Land Management's Renewable Energy Coordination Office, through its Geothermal Program, funded the National Renewable Energy Laboratory (NREL) to analyze technical and environmental considerations related to geothermal resource confirmation drilling. NREL solicited input from a group of technical and environmental experts in the geothermal industry, along with analyzing National Environmental Policy Act of 1969 (NEPA) documentation for previously approved projects. The collected data and analysis will be used by the Bureau of Land Management to examine the possibility of developing a new classification of wells and/or expediting the NEPA compliance process, which could potentially reduce permitting and regulatory compliance timelines when compared to the current process for obtaining a geothermal drilling permit for resource confirmation drilling activities. This paper provides a summary of the technical requirements for confirming a geothermal resource. The analysis showed that confirming a geothermal resource requires confirming reservoir temperature, chemistry, permeability, and flow rate. Obtaining these data requires drilling at least two-preferably three-successful wells into the resource to conduct the necessary tests, including an interference test. Bottom-hole well diameters of at least 6'' to 8'' (0.15 to 0.2 m) are needed to limit the wellbore frictional pressure drop to effectively perform well flow and interference tests. Drilling these wells requires a drill rig with a mud pump and derrick capable of holding three drill pipes. This type of rig requires a minimum well-pad size of 2.5 acres (104 m2) including surface area for a 1 million-gallon (3.8 million-liter) pit. Up to 15 acres (5x104 m2) of total surface disturbance are needed for developing access roads and well pads to drill a total of three to five wells.

15 GEOTHERMAL ENERGY↗

Deep Direct-Use for Industrial Applications: Producing Chilled Water for Gas-Turbine Inlet Cooling

Direct use of deep, low-temperature geothermal resources is underutilized due to challenging project economics associated with developing a deep geothermal resource for what are historically small-scale, variable-demand projects. This project assesses the feasibility of geothermal energy integration in natural-gas combined cycle power stations in the Sabine Uplift and Gulf Coast regions of Texas. The low-grade geothermal resource is tapped to drive absorption chillers for production of chilled water at 5-10 degrees C (41-50 degrees F). This chilled water is stockpiled and dispatched to provide turbine inlet cooling (TIC) at the inlet to the compressor of a natural-gas combined cycle power plant, thereby boosting power production during periods of high temperature and high-power demand. This presentation focuses on the system design related to geothermal well-site selection (proximity vs. resource quality), absorption chiller size and location, chilled-water storage capacity, and dispatch logic to realize the maximum financial benefit.

15 GEOTHERMAL ENERGY↗

Hydraulic Fracture Modeling in Support of EGS Collab Treatment Designs

This paper presents ongoing hydraulic fracturing modeling work in support of the Department of Energy's EGS Collab project. CFRAC, a hydraulic fracturing research code with discrete fracture modeling capabilities was used in the modeling. The models are run under different geomechanical conditions to predict the hydraulic fracturing treatments to be pumped within EGS Collab's experiments in Sanford Underground Research Facility (SURF). Effect of the parameters such as a varying stress field and the presence of natural fractures are investigated. The simulations show that when injecting at 0.1 L/s for 180 s with uniform stress field conditions, a penny-shaped fracture with maximum aperture of 0.14 mm at radial extent of about 8 m is created. A disturbance in the stress field, caused by the presence of an offset mine drift, forced the fractures to grow asymmetrically. The presence of an intersecting natural fracture halted growth of the hydraulic fracture. These results agree with other modeling work done within the EGS Collab team.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Geothermal Induced Seismicity National Environmental Policy Act Review

This presentation reviews four National Environmental Policy Act of 1969 (NEPA) documents to understand how Federal agencies, including the U.S. Bureau of Land Management and Department of Energy, review and analyze the potential impacts to the human environment when funding or approving permits for enhanced geothermal system with the potential for induced seismicity.

15 GEOTHERMAL ENERGY↗

Introducing GEOPHIRES v2.0: Updated Geothermal Techno-Economic Simulation Tool: Preprint

This paper presents an updated version of the geothermal techno-economic simulation tool GEOPHIRES (GEOthermal Energy for Production of Heat and electricity (IR) Economically Simulated). GEOPHIRES combines reservoir, wellbore, surface plant and economic models to estimate the capital, and operation and maintenance costs, lifetime energy production, and overall levelized cost of energy of a geothermal plant. The available end-use options are electricity, direct-use heat and cogeneration. The main updates in the new version include conversion of the source code from FORTRAN to Python, the option to couple to an external reservoir simulator, updated cost correlations, and more flexibility in selecting the time step and number of injection and production wells. An overview of all the updates and two case-studies to illustrate the tool's new capabilities are provided in this paper.

15 GEOTHERMAL ENERGY↗

Introducing GEOPHIRES v2.0: Updated Geothermal Techno-Economic Simulation Tool

This paper presents an updated version of the geothermal techno-economic simulation tool GEOPHIRES (GEOthermal energy for Production of Heat and electricity ('IR') Economically Simulated). GEOPHIRES combines engineering models of the reservoir, wellbores, and surface plant facilities of a geothermal plant with an economic model to estimate the capital and operation and maintenance costs, lifetime energy production, and overall levelized cost of energy. The available end-use options are electricity, direct-use heat, and cogeneration. The main updates in the new version include conversion of the source code from FORTRAN to Python, the option to import temperature data (e.g., measured or from stand-alone reservoir simulator), updated cost correlations, and more flexibility in selecting the time step and number of injection and production wells. In this paper, we provide an overview of all the updates and two case studies to illustrate the tool's new capabilities.

15 GEOTHERMAL ENERGY↗

Hybrid Geothermal Heat Pumps for Cooling Telecommunications Data Centers

The technical and economic performance of geothermal heat pump (GHP) systems supplying year-round cooling to representative small data centers with cooling loads less than 500 kWth were analyzed and compared to air-source heat pumps (ASHPs). A numerical model was developed in TRNSYS software to simulate the operation of air-source and geothermal heat pumps with and without supplementary air cooled heat exchangers - dry coolers (DCs). The model was validated using data measured at an experimental geothermal system installed in Ithaca, NY, USA. The coefficient of performance (COP) and cooling capacity of the GHPs were calculated over a 20-year lifetime and compared to the performance of ASHPs. The total cost of ownership (TCO) of each of the cooling systems was calculated to assess its economic performance. Both the length of the geothermal borehole heat exchangers (BHEs) and the dry cooler temperature set point were optimized to minimize the TCO of the geothermal systems. Lastly, a preliminary analysis of the performance of geothermal heat pumps for cooling dominated systems was performed for other locations including Dallas, TX, Sacramento, CA, and Minneapolis, MN.

15 GEOTHERMAL ENERGY↗

Analysis of Geothermal Reservoir and Well Operational Conditions using Monthly Production Reports from Nevada and California

When conducting techno-economic analysis of geothermal systems, assumptions are typically necessary for reservoir and wellbore parameters such as producer/injector well ratio, production temperature drawdown, and production/injection temperature, pressure and flow rate. To decrease uncertainty of several of these parameters, we analyzed field data reported by operators in monthly production reports. This paper presents results of a statistical analysis conducted on monthly production reports at 19 power plants in California and Nevada covering 196 production wells and 175 injection wells. The average production temperature was 304 degrees F (151 degrees C) for binary plants and 310 degrees F (154 degrees C) for flash plants. The average injection temperature was 169 degrees F (76 degrees C) for binary plants and 173 degrees F (78 degrees C) for flash plants. The average production temperature drawdown was 0.5% per year for binary plants and 0.8% per year for flash plants. The average production well flow rate was 112 L/s for binary plant wells and 62 L/s for flash plant wells. For all 19 plants combined, the median injectivity index value was 3.8 L/s/bar, and the average producer/injector well ratio was 1.6. As an additional example of analysis using data from monthly production reports, a coupled reservoir-wellbore model was developed to derive productivity curves at various pump horsepower settings. The workflow and model were applied to two example production wells.

15 GEOTHERMAL ENERGY↗

Geothermal Induced Seismicity National Environmental Policy Act Review

In 2016, the U.S. Bureau of Land Management (BLM) contracted with the National Renewable Energy Laboratory (NREL) to assist the BLM in developing and building upon tools to better understand and evaluate induced seismicity caused by geothermal projects. This review of NEPA documents for four geothermal injection or EGS projects reveals the variety of approaches to analyzing and mitigating induced seismicity. With the exception of the Geysers, where induced seismicity has been observed and monitored for an extended period of time due to large volumes of water being piped in to recharge the hydrothermal reservoir, induced seismicity caused by geothermal projects is a relative new area of study. As this review highlights, determining the level of mitigation required for induced seismic events has varied based on project location, when the review took place, whether the project utilized the International Energy Agency or DOE IS protocols, and the federal agency conducting the review. While the NEPA reviews were relatively consistent for seismic monitoring and historical evaluation of seismic events near the project location, the requirements for public outreach and mitigation for induced seismic events once stimulation has begun varied considerably between the four projects. Not all of the projects were required to notify specific community groups or local government entities before beginning the project, and only one of the reviews specifically stated the project proponent would hold meetings with the public to answer questions or address concerns.

15 GEOTHERMAL ENERGY↗

Update on Geothermal Direct-Use Installations in the United States

Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others; power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.

15 GEOTHERMAL ENERGY↗

Performance, Cost, and Financial Parameters of Geothermal District Heating Systems for Market Penetration Modeling under Various Scenarios

Geothermal district heating (GDH) systems have limited penetration in the U.S., with an estimated installed capacity of only 100 MWth for a total of 21 sites. We see higher deployment in other regions, for example, in Europe with an installed capacity of more than 4,700 MWth for 257 GDH sites. The U.S. Department of Energy Geothermal Vision (GeoVision) Study is currently looking at the potential to increase the deployment in the U.S. and to understand the impact of this increased deployment. This paper reviews 31 performance, cost, and financial parameters as input for numerical simulations describing GDH system deployment in support of the GeoVision effort. The focus is on GDH systems using hydrothermal and Enhanced Geothermal System resources in the U.S.; ground-source heat pumps and heat-to-electricity conversion technology were excluded. Parameters investigated include 1) capital and operation and maintenance costs for both subsurface and surface equipment; 2) performance factors such as resource recovery factors, well flow rates, and system efficiencies; and 3) financial parameters such as inflation, interest, and tax rates. Current values as well as potential future improved values under various scenarios are presented. Sources of data considered include academic and popular literature, software tools such as GETEM and GEOPHIRES, industry interviews, and analysis conducted by other task forces for the GeoVision Study, e.g., on the drilling costs and reservoir performance.

15 GEOTHERMAL ENERGY↗