Search NASASearch

Engineering topics

Beckham, W. S., Jr.

Publications and source records attributed to Beckham, W. S., Jr..

MIUS integration and subsystems test program

The MIUS Integration and Subsystems Test (MIST) facility at the Lyndon B. Johnson Space Center was completed and ready in May 1974 for conducting specific tests in direct support of the Modular Integrated Utility System (MIUS). A series of subsystems and integrated tests was conducted since that time, culminating in a series of 24-hour dynamic tests to further demonstrate the capabilities of the MIUS Program concepts to meet typical utility load profiles for a residential area. Results of the MIST Program are presented which achieved demonstrated plant thermal efficiencies ranging from 57 to 65 percent.

Beckham, W. S., Jr.

The MIST /MIUS Integration and Subsystems Test/ laboratory - A testbed for the MIUS /Modular Integrated Utility System/ program

The MIUS (Modular Integrated Utility System) concept is to be an energy-conserving, economically feasible, integrated community utility system to provide five necessary services: electricity generation, space heating and air conditioning, solid waste processing, liquid waste processing, and residential water purification. The MIST (MIUS Integration and Subsystem Test) integrated system testbed constructed at the Johnson Space Center in Houston includes subsystems for power generation, heating, ventilation, and air conditioning (HVAC), wastewater management, solid waste management, and control and monitoring. The key design issues under study include thermal integration and distribution techniques, thermal storage, integration of subsystems controls and displays, incinerator performance, effluent characteristics, and odor control.

Beckham, W. S., Jr.

The MIST (Minus Integration and Subsystems Test) Laboratory: A testbed for the MIUS (Modular Integrated Utility System) program

The MIUS program develops an economically feasible integrated utility system. The MIUS concept integrates utility services in order to achieve resource, energy and environmental benefits. A testbed integrated utility system, called the MIST laboratory, was completed early in 1974 and has begun a long term program to develop data for MIUS. A description of the MIST is presented and the critical design issues which can only be verified by test, are discussed in detail.

Beckham, W. S., Jr.