Optimal subhourly electricity resource dispatch under multiple price signals with high renewable generation availability

This article proposes a system-wide optimal resource dispatch strategy that enables a shift from a primarily energy cost-based approach, to a strategy using simultaneous price signals for energy, power and ramping behavior. A formal method to compute the optimal sub-hourly power trajectory is derived for a system when the price of energy and ramping are both significant. Optimal control functions are obtained in both time and frequency domains, and a discrete-time solution suitable for periodic feedback control systems is presented. The method is applied to North America Western Interconnection for the planning year 2024, and it is shown that an optimal dispatch strategy that simultaneously considers both the cost of energy and the cost of ramping leads to significant cost savings in systems with high levels of renewable generation: the savings exceed 25% of the total system operating cost for a 50% renewables scenario.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

H 2 -optimal transactive control of electric power regulation from fast-acting demand response in the presence of high renewables

Here, this paper presents an H 2 -optimal power regulation scheme for balancing authorities to provide regulation services using both generation and load resources in the presence of a significant amount of intermittent renewable generation. The optimal controller is designed to minimize the loss of total economic surplus due to deviations from the schedule because of generation contingencies. The results show that the optimal controller outperforms the conventional ACE control policy by (1) providing faster return to the schedule under varying demand response levels, (2) reducing the cost of using reserve units for regulation services, and (3) minimizing deviations from the global surplus-maximizing schedule.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transactive control of fast-acting demand response based on thermostatic loads in real-time retail electricity markets

Coordinated operation of distributed thermostatic loads such as heat pumps and air conditioners can reduce energy costs and prevents grid congestion, while maintaining room temperatures in the comfort range set by consumers. This paper furthers efforts towards enabling thermostatically controlled loads (TCLs) to participate in real-time retail electricity markets under a transactive control paradigm. An agent-based approach is used to develop an effective and low complexity demand response control scheme for TCLs. The proposed scheme adjusts aggregated thermostatic loads according to real-time grid conditions under both heating and cooling modes. Here, a case study is presented showing the method reduces consumer electricity costs by over 10% compared to uncoordinated operation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Interconnection-wide hour-ahead scheduling in the presence of intermittent renewables and demand response: A surplus maximizing approach

This study describes a new approach for solving the multi-area electricity resource allocation problem when considering both intermittent renewables and demand response. The method determines the hourly inter-area export/import set that maximizes the interconnection (global) surplus satisfying transmission, generation and load constraints. The optimal inter-area transfer set effectively makes the electricity price uniform over the interconnection apart from constrained areas, which overall increases the consumer surplus more than it decreases the producer surplus. The method is computationally efficient and suitable for use in simulations that depend on optimal scheduling models. The method is demonstrated on a system that represents North America Western Interconnection for the planning year of 2024. Simulation results indicate that effective use of interties reduces the system operation cost substantially. Excluding demand response, both the unconstrained and the constrained scheduling solutions decrease the global production cost (and equivalently increase the global economic surplus) by 12.30B and 10.67B per year, respectively, when compared to the standalone case in which each control area relies only on its local supply resources. This cost saving is equal to 25% and 22% of the annual production cost. Including 5% demand response, the constrained solution decreases the annual production cost by 10.70B, while increases the annual surplus by 9.32B in comparison to the standalone case.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Renewable Energy Resources Portfolio Optimization in the Presence of Demand Response

In this paper we introduce a simple cost model of renewable integration and demand response that can be used to determine the optimal mix of generation and demand response resources. The model includes production cost, demand elasticity, uncertainty costs, capacity expansion costs, retirement and mothballing costs, and wind variability impacts to determine the hourly cost and revenue of electricity delivery. The model is tested on the 2024 planning case for British Columbia and we find that cost is minimized with about 31% renewable generation. We also find that demand responsive does not have a significant impact on cost at the hourly level. The results suggest that the optimal level of renewable resource is not sensitive to a carbon tax or demand elasticity, but it is highly sensitive to the renewable resource installation cost.

Behboodi, Sahand↗