Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

Plasma Ignition and Combustion Stabilization Technology to Improve Flexible Operation, Reliability and Economics of an Existing Coal-Fired Boiler

GE Steam Power, Inc. (GE) proposed to improve reliability, flexibility, and economics of an existing coal-fired power plant by applying a new advanced technology developed by GE, a plasma-assisted pulverized fuel firing system. The objective of this program is to demonstrate the achievement of lower load by improved flame stabilization and therefore lower operating costs in a full-scale field installation at coal-fired electric utility. GE’s Plasma Ignition and Combustion Stabilization System is designed to operate continuously to support low load operation. With the plasma on, the flame will be attached and stable, removing the firing system as a limitation to low load operation. In addition, GE’s exclusively from ABENZ company licensed AC based technology has a 90+% system efficiency compared to all other systems at which are DC and operate with ~75% efficiency. Plant operating costs are lowered by eliminating use of expensive support fuel as well as the ability to operate at lower loads. The utilities’ ability to better match the demand curve will result in significant savings. Maintenance is lower for an AC system than a DC system as it operates at lower current. This eliminates the need for a demineralized cooling water system and provides longer electrode life which translates into both material and labor savings. It is the objective of GE to not only demonstrate the additional low load achievable with a plasma system after best achievable tuning, sensor and software approach has been exhausted, but also the increased stability of the flame at all loads with plasma assistance as well as cost savings at all low loads using plasma instead of oil. Upon successful completion of this project, GE will have sufficient field experience to rapidly deploy the Plasma Technology. The project objectives were achieved through the implementation of plasma ignitor technology at PacifiCorp Hunter Station Unit 3. A plasma ignitor system was retrofitted on ten wall-fired burners, Mill 3-4 combustion system. The Plasma Ignitors installed at Hunter proved that this GE technology is a direct and complete replacement for the original oil ignitors. The Hunter Unit 3 burner management system allows the plasma system to be used in all applications that originally required oil to be burned. This includes any time the Mill 3-4 is started or stopped for any reason including boiler starts, load changes, and low load support.