Publications and source records attributed to Bitten, Bob.

Challenges and Potential Solutions to Develop and Fund NASA Flagship Missions

Large, strategic "Flagship" missions have unique characteristics that lead to challenging developmental difficulties for the National Aeronautics and Space Administration (NASA). Missions such as the Hubble Space Telescope (HST), James Webb Space Telescope (JWST), and the Mars Science Laboratory (MSL) had technical and programmatic challenges that led to significant schedule delays and subsequent cost growth. Although NASA has instituted policies that have reduced cost growth for more "typical" NASA science missions, NASA Flagship missions remain a distinct challenge due to their requirement to provide unprecedented science or tackle bold exploration goals, typically while concurrently developing new technologies. The unique challenges presented by Flagship missions make it extremely difficult to fully predict cost and schedule given that the technical and programmatic advances needed to meet performance requirements are unprecedented. This paper addresses why Flagship missions are unique and proposes a new programmatic approach to develop and fund Flagship missions.

flagship missions↗

EoC Study Update to Examine the Cost, Schedule and Technical Changes to NASA Projects

The original National Aeronautics and Space Administration (NASA) Explanation of Change (EoC) study was conducted in 2010 to understand the underlying causes of cost and schedule growth. The first study consisted of 25 missions launched from 2000 to 2010 and looked at the events that led to growth. These events were categorized into different bins that were rolled up to quantify whether the growth was due to internal planning, or internal execution, or from external forces and found that the growth was evenly distributed among those three categories. The result of the study presented nine considerations focused at reducing growth due to project external events and internal planning events. Although no one 'magic bullet' consideration was discovered in the previous work, the nine considerations taken as a whole were postulated to help reduce cost and schedule change in future NASA missions. A recent update was conducted that included investigating 8 missions developed since the previous study to determine if the results were different. Cost, schedule, and mass increases were analyzed from the start of Phase B through Preliminary Design Review and Critical Design Review to Launch. As shown in this paper, the results are better with overall cost and schedule growth being reduced. The paper will show a comparison of the previous results to the updated results to show specific reductions and provide an explanation of which recommendations were followed.

growth↗

Explanation of Change Cost and Schedule Growth Study Interim Status Briefing

This slide presentation reviews the study to understand the changes in cost and schedule growth for NASA projects. A second goal was to determine the percentage of growth that was outside the control of the project. The study examined project documentation, conducted interviews with key project personnel, and allocated growth events to an Explanation of Change (EoC) tree to quantify the reasons for growth in the scheduled time. This briefing reviews the results of the study of the first 20 missions.