Search NASA⌕ Search

Engineering topics

Bjorklund, Eric A.

Publications and source records attributed to Bjorklund, Eric A..

Replacing the Engine In Your Car While You Are Still Driving It

Replacing your accelerator’s timing system with a completely different architecture is not something that happens very often. Perhaps even rarer is the requirement that the replacement not interfere with the accelerator’s normal operational cycle. In 2011, The Los Alamos Neutron Science Center (LANSCE) began the purchasing and installation phase of a nine-year rolling upgrade project which will eventually result in the complete replacement of the low-level RF system, the timing system, the industrial I/O system, the beam-synchronized data acquisition system, the fastprotect reporting system, and much of the diagnostic equipment. These projects are mostly independent of each other, with their own installation schedules, priorities, and time-lines. All of them, however, must interface with the timing system.

43 PARTICLE ACCELERATORS↗

Replacing The Engine In Your Car While You Are Still Driving It [PowerPoint]

The scope of the project included the following: install new network backbone, replace 201 MHz rf tubes, replace low-level rf system, replace timing system, replace industrial I/O system, replace beam synchronous data acquisition system, replace fast protect reporting system, new wire scanner hardware, and new beam position/phase monitor hardware--all of this to be done while continuing to deliver beam to users. Lessons learned, for anyone contemplating a similarly ambitious upgrade: You can’t replace the whole system at once. Some compatibility must be maintained between the old and new systems. Always have a way to fall back. Have sympathy for the operations staff. You will be surprised.

43 PARTICLE ACCELERATORS↗

Timing Tricks For Complicated Accelerators [PowerPoint]

A brief description of the Los Alamos Neutron Science Center is given first, including static and dynamic scheduling. The principal tricks presented are prescient feed forward and pulser replication. Tricks with flip/flop pulsers are also included.

43 PARTICLE ACCELERATORS↗