Search NASA⌕ Search

Engineering topics

Blackler, I.

Publications and source records attributed to Blackler, I..

Activation estimates of the RHIC beam dump

In anticipation of the expiration of the RHIC ASE in December 2025 and the need to demonstrate compliance with nuclear facility rule (10CFR830), this study quantifies the radionuclide inventory and respective activity at the beam dumps by simulating a period of five years of operation using conservative assumptions. Simulations were performed with the Monte Carlo particle transport and interaction code FLUKA and its dosimetry results were compared with measured dose rate data, showing good agreement. The beam dump was deemed to constitute the main hotspot of residual radiation and also representative of a worst case scenario in terms of induced activation. The activation levels calculated indicate that the RHIC tunnel will be well below the thresholds of a DOE’s category-3 nuclear facility classification.

43 PARTICLE ACCELERATORS↗

Gold-gold luminosity increase in RHIC for a beam energy scan with colliding beam energies extending below the nominal injection energy

The Beam Energy Scan phase II (BES-II), performed in the Relativistic Heavy Ion Collider (RHIC) from 2019 to 2021, explored the phase transition between quark-gluon plasma and hadronic gas. BES-II exceeded the goal of a fourfold increase in the average luminosity over that achieved during Beam Energy Scan phase I (BES-I), at five gold beam energies: 9.8, 7.3, 5.75, 4.59, and 3.85 GeV / nucleon. This was accomplished by addressing several beam dynamics effects, including intrabeam scattering, beam-beam, space charge, beam instability, and field errors induced by superconducting magnet persistent currents. Some of these effects are especially detrimental at low energies. BES-II achievements are presented, and the measures taken to improve RHIC performance are described. These measures span the whole RHIC complex, including ion beam sources, injectors, beam lifetime improvements in RHIC, and operation with the world’s first bunched beam Low Energy RHIC electron Cooler (LEReC).

43 PARTICLE ACCELERATORS↗