First results of AUP Nb3Sn quadrupole horizontal tests

The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It is under construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC. This paper will present the program to fabricate the Nb3Sn superconducting magnets. We are reporting the status of the HL-LHC AUP project present the results from horizontal tests of the first fully assembled cryo-assembly.

43 PARTICLE ACCELERATORS↗

Analysis of the MQXFA Low Beta Quadrupoles for HL-LHC after 50% magnet assembly complete +

The US HL-LHC Accelerator Upgrade Project (AUP) is fabricating the MQXFA magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC (HL-LHC). This is the first production of Nb3Sn magnets for a particle accelerator, together with the MQXFB magnets for Q2a and Q2b. Here we show status and some results of MQXFA magnets fabrication and vertical test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Analysis of MQXFA07 Test Non-Conformity

MQXFA07 did not meet acceptance requirement during vertical test. This report presents the analysis of MQXFA07 components related to the limited test performance, and the damage mechanism as it was understood by the MQXFA team.

43 PARTICLE ACCELERATORS↗

200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab

The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and one 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and the BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.

43 PARTICLE ACCELERATORS↗

RECORD FAST CYCLING ACCELERATOR MAGNET BASED ON HIGH TEMPERATURE SUPERCONDUCTOR

We report on the High Temperature Superconductor (HTS) based prototype accelerator magnet capable to operate at 12 T/s B-field ramping rate with a very low supporting cryogenic cooling power thus indicating a feasibility of its application in the accelerator requiring high repetition rate and high average beam power. The magnet is designed to simultaneously accelerate two particle beams in the separate beam gaps energized by a single conductor. The design, construction and the power test of the prototype fast-cycling HTS based accelerator magnet is presented while the more detailed description and power test data analysis s given in [1]. As example, the measured cryogenic power loss limit is discussed in terms of the feasibility of application of such a magnet for the construction of the 8 GeV dual proton beam Booster.

43 PARTICLE ACCELERATORS↗

Status of LCLS - II QA Systems Collaboration for Cyromodule Construction at TJNAF and FNAL

At the Thomas Jefferson National Accelerator Facility (Jefferson Lab), we are supporting the LCLS-II Project at SLAC. The plan is to build thirty-five 1.3 GHz continuous wave cryomodules, production to be split between JLab and FNAL (Fermilab). This has required a close collaboration between the partner labs, including enhancing our existing quality systems to include this collaboration. This overview describes the current status of the Quality System development as of August 2015, when the partner labs start the assembly of the prototype cryomodules.

43 PARTICLE ACCELERATORS↗