Search NASA⌕ Search

Engineering topics

Blowers, James

Publications and source records attributed to Blowers, James.

LCLS-II-HE Status at Fermilab

The LCLS-II-HE project is an upgrade to the Linac Coherent Light Source facility at SLAC National Accelerator Laboratory. Fermilab is part of the LCLS-II-HE collaboration and will deliver 14 cryomodules to SLAC for LCLS-II-HE. These cryomodules consist of eight 1.3 GHz 9-cell cavities. Cryomodule production is in progress, and four cryomodules have been delivered to SLAC. One of the cryomodules already delivered is the verification cryomodule that reached 200 MV total voltage in continuous wave mode. Status of cryomodule production, and lessons learned will be presented. Fermilab is also designing a buncher cryomodule as part of a low emittance injector design for the project. The design is near completion, and status will be reported.

Kaluzny, Joshua↗

Challenges and Lessons Learned From Fabrication, Testing, and Analysis of Eight MQXFA Low Beta Quadrupole Magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low-beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some of the criteria and were disassembled. Furthermore, lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this article, we present a summary of 1) the fabrication and test data for all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

MQXFA Series Magnet Production Specification: US HL-LHC Accelerator Upgrade Project

The purpose of this document is to define the specifications for the structure fabrication and assembly of MQXFA series magnets to be used by the US High-Luminosity LHC Accelerator Upgrade Project (AUP). Magnets fabricated according to these specifications are expected to allow MQXFA magnets to meet the MQXFA Functional Requirements Specification. These specifications for the fabrication of MQXFA series magnets are based on the R&D performed by the US LHC Accelerator Research Program (LARP) and the development performed by AUP, in collaboration with CERN, through fabrication and test of pre-series coils and magnets.

43 PARTICLE ACCELERATORS↗

LCLS-II Cryomodules Production Experience and Lessons Learned Towards LCLS-II-HE Project

LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac consists of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF (SRF) continuous wave (CW) cryomodules with high quality factor cavities. Cryomodules were produced at Fermilab and at Jefferson Lab in collaboration with SLAC. Fermilab successfully completed the assembly, testing and delivery of seventeen 1.3 GHz and three 3.9 GHz cryomodules. LCLS-II-HE is a planned upgrade project to LCLS-II. The LCLS-II-HE linac will consist of twenty-three 1.3 GHz cryomodules with high gradient and high quality factor cavities. This paper presents LCLS-II-HE cryomodule production plans, emphasizing the improvements done based on the challenges, mitigations, and lessons learned from LCLS-II.

43 PARTICLE ACCELERATORS↗