Could on-site fuel storage economically reduce power plant-gas grid dependence in pipeline constrained areas like New England?

In the Northeastern United States, natural gas supply constraints have led to periods when gas shortages have caused up to a quarter of all unscheduled power plant outages. Dual fuel oil/gas generators or local gas storage might mitigate gas supply shortages. We use historical power plant operational and availability data to develop a supply curve of the costs required for generators to mitigate fuel shortage failures in New England. Based on 2012–2018 data, we find that the historical fuel shortages at approximately 2 GW worth of gas-fired capacity could be mitigated using on-site fuel storage. For comparison, New England’s average reserve margin was 1.7–2.8 GW over our sample period. Oil dual fuel plants would recoup their investment if compensated with a reliability adder of $\$ 3-7$/MWh during their normal operations, while $\$ 7-16$/MWh would incentivize using onsite, compressed natural gas storage. We estimate that the capital expenses associated with the fuel storage options would be less expensive than installing battery backup for resource adequacy at current battery prices.

03 NATURAL GAS↗

Joint Electricity and Natural Gas Transmission Planning with Endogenous Market Feedbacks

Recent trends in gas-fired power plant installation has increased the connections between the electric power and natural gas industries. Despite these dependencies, both industries must meet commercial, political, operational and technical requirements that often force the industries to plan and operate in isolation. As a result, undesired situations may arise, such as those experienced by both systems during the winter of 2013/2014 in the northeastern United States. In this work, we consider the technical challenges and present a Combined Electricity and Gas Expansion (CEGE) planning model. The CEGE model minimizes the cost of meeting gas and electricity demand during high stress conditions and introduces an elasticity model for analysis of gas-price volatility caused by congestion. The underlying mathematical formulation considers recent advances in convex approximations to make the problem computationally tractable when applied to large-scale CEGE instances. We conduct an indepth analysis on integrated test systems that include the New England area.

03 NATURAL GAS↗

Final report for EEB Hub, Task 10.2, Metrics Development, BP2

The long-term EEB Hub goal quantified during BP2 is to accelerate the adoption of advanced energy retrofits to reduce building energy use 20% by 2020 for commercial buildings in the greater Philadelphia region. For each budget period, the EEB Hub develops deliverables targeted at methods and means to achieve this long-term goal. The purpose of metrics is to regularly measure progress towards achieving the annual budget-period deliverables.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗