Search NASA⌕ Search

Engineering topics

Bluth, Marcel

Publications and source records attributed to Bluth, Marcel.

Sub-Picometer Dynamic Measurements of a Diffuse Surface

Future space observatory missions are forecasting the need for sensing and controlling wave front error and system alignment stability to picometer scale. Picometer stability performance demands precision knowledge of the mirror and metering structure materials to the same degree. A high-speed electronic speckle pattern interferometer was designed and built to demonstrate measurements of both static and dynamic responses of picometer amplitudes in materials of diffuse surface subjected to very low energy disturbances. This paper describes the details of a test to impart a dynamic disturbance of picometer scale and measure the response of a composite material.The results of the test are also reported and show conclusively that sub-picometer scale effects can be accurately measured in an open test environment outside a vacuum chamber.

Saif, Babak↗

JWST Optical Telescope Element Center of Curvature Test

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) completed element level integration and test programs and were integrated to the next level of assembly called OTE/ISIM (OTIS) at Goddard Space Flight Center (GSFC) in Greenbelt, Maryland in 2016. Before shipping the OTIS to Johnson Space Center (JSC) for optical test at cryogenic temperature a series of vibration and acoustic tests were performed. To help ensure that the OTIS was ready to be shipped to JSC an optical center of curvature (CoC) test was performed to measure changes in the mirror's optical performance to verify that the telescope's primary mirror was not adversely impacted by the environmental testing and help us in understanding potential anomalies identified during the JSC tests. The primary is a 6.5 meter diameter mirror consisting of 18 individual hexagonal segments. Each segment is an off-axis asphere. There are a total of three prescriptions repeated six times each. As part of the CoC test each segment was individually measured using a high-speed interferometer (HSI) designed and built specifically for this test. This interferometer is capable of characterizing both static and dynamic characteristics of the mirrors. The latter capability was used, with the aid of a vibration stinger applying a low-level input force, to measure the dynamic characteristic changes of the PM backplane structure. This paper describes the CoC test setup and both static and dynamic test results.

interferometer↗

New Method for Characterizing the State of Optical and Opto-Mechanical Systems

James Webb Space Telescope Optical Telescope Element (OTE) is a three mirror anastigmat consisting of a 6.5 m primary mirror (PM), secondary mirror (SM) and a tertiary mirror. The primary mirror is made out of 18 segments. The telescope and instruments will be assembled at Goddard Space Flight Center (GSFC) to make it the Optical Telescope Element-Integrated Science Instrument Module (OTIS). The OTIS will go through environmental testing at GSFC before being transported to Johnson Space Center for testing at cryogenic temperature. The objective of the primary mirror Center of Curvature test (CoC) is to characterize the PM before and after the environmental testing for workmanship. This paper discusses the CoC test including both a surface figure test and a new method for characterizing the state of the primary mirror using high speed dynamics interferometry.

Optical Testing↗

Integrated Modeling Activities for the James Webb Space Telescope (JWST): Structural-Thermal-Optical Analysis

This is a continuation of a series of papers on modeling activities for JWST. The structural-thermal- optical, often referred to as "STOP", analysis process is used to predict the effect of thermal distortion on optical performance. The benchmark STOP analysis for JWST assesses the effect of an observatory slew on wavefront error. The paper begins an overview of multi-disciplinary engineering analysis, or integrated modeling, which is a critical element of the JWST mission. The STOP analysis process is then described. This process consists of the following steps: thermal analysis, structural analysis, and optical analysis. Temperatures predicted using geometric and thermal math models are mapped to the structural finite element model in order to predict thermally-induced deformations. Motions and deformations at optical surfaces are input to optical models and optical performance is predicted using either an optical ray trace or WFE estimation techniques based on prior ray traces or first order optics. Following the discussion of the analysis process, results based on models representing the design at the time of the System Requirements Review. In addition to baseline performance predictions, sensitivity studies are performed to assess modeling uncertainties. Of particular interest is the sensitivity of optical performance to uncertainties in temperature predictions and variations in metal properties. The paper concludes with a discussion of modeling uncertainty as it pertains to STOP analysis.

Johnston, John D.↗

Integrated Modeling Activities for the James Webb Space Telescope: Structural-Thermal-Optical Analysis

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. This is a continuation of a series of papers on modeling activities for JWST. The structural-thermal-optical, often referred to as STOP, analysis process is used to predict the effect of thermal distortion on optical performance. The benchmark STOP analysis for JWST assesses the effect of an observatory slew on wavefront error. Temperatures predicted using geometric and thermal math models are mapped to a structural finite element model in order to predict thermally induced deformations. Motions and deformations at optical surfaces are then input to optical models, and optical performance is predicted using either an optical ray trace or a linear optical analysis tool. In addition to baseline performance predictions, a process for performing sensitivity studies to assess modeling uncertainties is described.

Johnston, John D.↗

The Role of Integrated Modeling in the Design and Verification of the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. System-level verification of critical optical performance requirements will rely on integrated modeling to a considerable degree. In turn, requirements for accuracy of the models are significant. The size of the lightweight observatory structure, coupled with the need to test at cryogenic temperatures, effectively precludes validation of the models and verification of optical performance with a single test in 1-g. Rather, a complex series of steps are planned by which the components of the end-to-end models are validated at various levels of subassembly, and the ultimate verification of optical performance is by analysis using the assembled models. This paper describes the critical optical performance requirements driving the integrated modeling activity, shows how the error budget is used to allocate and track contributions to total performance, and presents examples of integrated modeling methods and results that support the preliminary observatory design. Finally, the concepts for model validation and the role of integrated modeling in the ultimate verification of observatory are described.

Mosier, Gary E.↗