Search NASA⌕ Search

Engineering topics

Boddu, S

Publications and source records attributed to Boddu, S.

WE-H-BRC-04: Implement Lean Methodology to Make Our Current Process of CT Simulation to Treatment More Efficient

Purpose: Our goal is to implement lean methodology to make our current process of CT simulation to treatment more efficient. Methods: In this study, we implemented lean methodology and tools and employed flowchart in excel for process-mapping. We formed a group of physicians, physicists, dosimetrists, therapists and a clinical physics assistant and huddled bi-weekly to map current value streams. We performed GEMBA walks and observed current processes from scheduling patient CT Simulations to treatment plan approval. From this, the entire workflow was categorized into processes, sub-processes, and tasks. For each process we gathered data on touch time, first time quality, undesirable effects (UDEs), and wait-times from relevant members of each task. UDEs were binned per frequency of their occurrence. We huddled to map future state and to find solutions to high frequency UDEs. We implemented visual controls, hard stops, and documented issues found during chart checks prior to treatment plan approval. Results: We have identified approximately 64 UDEs in our current workflow that could cause delays, re-work, compromise the quality and safety of patient treatments, or cause wait times between 1 – 6 days. While some UDEs are unavoidable, such as re-planning due to patient weight loss, eliminating avoidable UDEs is our goal. In 2015, we found 399 issues with patient treatment plans, of which 261, 95 and 43 were low, medium and high severity, respectively. We also mapped patient-specific QA processes for IMRT/Rapid Arc and SRS/SBRT, involving 10 and 18 steps, respectively. From these, 13 UDEs were found and 5 were addressed that solved 20% of issues. Conclusion: We have successfully implemented lean methodology and tools. We are further mapping treatment site specific workflows to identify bottlenecks, potential breakdowns and personnel allocation and employ tools like failure mode effects analysis to mitigate risk factors to make this process efficient.

60 APPLIED LIFE SCIENCES↗

TH-C-9A-01: Lean Tools and Methods

Lean thinking has revolutionized the manufacturing industry. Toyota has pioneered and leveraged this aspect of Lean thinking. Application of Lean thinking and Lean Six Sigma techniques into Healthcare and in particular in Radiation Oncology has its merits and challenges. To improve quality, safety and patient satisfaction with available resources or reducing cost in terms of time, staff and resources is demands of today's healthcare. Radiation oncology treatment involves many processes and steps, identifying and removing the non-value added steps in a process can significantly improve the efficiency. Real projects undertaken in radiation oncology department in cutting down the procedure time for MRI guided brachytherapy to 40% less using lean thinking will be narrated. Simple Lean tools and techniques such as Gemba walk, visual control, daily huddles, standard work, value stream mapping, error-proofing, etc. can be applied with existing resources and how that improved the operation in a Radiation Oncology department's two year experience will be discussed. Lean thinking focuses on identifying and solving the root-cause of a problem by asking “Why” and not “Who” and this requires a culture change of no blame. Role of leadership in building lean culture, employee empowerment and trains and develops lean thinkers will be presented. Why Lean initiatives fail and how to implement lean successfully in your clinic will be discussed. Learning Objectives: Concepts of lean management or lean thinking. Lean tools and techniques applied in Radiation Oncology. Implement no blame culture and focus on system and processes. Leadership role in implementing lean culture. Challenges for Lean thinking in healthcare.

54 ENVIRONMENTAL SCIENCES↗