Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects: Hypothesis of Hot Tank Failure

Work has begun on a Design Basis Document / Owner’s Technical Specification for parabolic trough and central receiver power plants using nitrate salt as the heat transport fluid and the thermal storage medium. A principal topic of recent interest is the failures of the hot salt tanks in central receiver projects. The paper outlines a hypothesis for the source of the failures, and discusses a range of possible solutions.

14 SOLAR ENERGY↗

Repowering Coal Plants as Pumped Thermal Energy Storage

This conference presentation presents the results from a DOE FE funded study on the integration of a Malta Pumped Heat Energy Storage system with a retiring coal-fired power plant, and the economic benefits to the asset owner and the local community.

20 FOSSIL-FUELED POWER PLANTS↗

Repurposing Fossil-Fueled Assets For Energy Storage

The annual retirement of U.S. coal-fired electricity generation units (CF-EGU) is at an all-time high and is expected to continue. This loss of reliable baseload generation, combined with predicted growth of variable renewable energy (VRE) generation, is expected to stress grid reliability as the number of load-following resources drops below the experienced load variability. Many regions are already experiencing challenges, and fossil retirement-related warnings by the North American Electric Reliability Corp. are becoming more dire. All CF-EGU retirements pose significant challenges to asset owners, local workforces, and their communities. Repurposing a retiring CF-EGU as a long-duration energy storage plant can address these challenges and offer a suite of additional benefits to asset owners, the grid, and society. This project performed a techno-economic evaluation and assessment of repurposing a Duke Energy fossil-fueled asset (in particular, a coal plant) into an energy storage system by integrating the retiring asset with a Malta long duration Pumped Heat Energy Storage (PHES) system. The project validated the technoeconomic benefits of repurposing retiring coal plants into long-duration energy storage using Malta’s PHES. Key findings for this project are summarized below: (1) Technical: (a) Retiring coal plants (and other steam turbine fossil generation) can be repurposed to enable the clean energy transition using Malta’s technology. (b) For older retiring coal plants, repurposing the site and electrical interconnection for a standalone PHES plant is the most economically favorable option. (c) For newer coal plants where there is also a local peaking capacity need, repowering the steam cycle into a hybrid integration with PHES is attractive. (d) A process was developed to assist fossil generation owners in choosing the best path for each plant’s circumstances. (2) Economic (a) Communities facing economic challenges caused by the retirement of fossil generation would benefit from repurposing the plant as long-duration energy storage using Malta’s PHES. (b) On a $/MW basis, repowering retiring coal units into Malta PHES plants can maintain the same number and types of jobs and economic activity. (c) For a 70% carbon reduction scenario, a 10-hour Malta PHES plant is more economic for the asset owner than similar-power 4-hour batteries. This project showed that repurposing a retiring coal unit into thermal energy storage, by integrating it with a Malta PHES system, makes techno-economic sense. At least two integration options are available, with the optimal solution depending on the coal plant and its location. Repurposing retiring coal plant into energy storage results in economic benefits for the plant owner and local communities.

20 FOSSIL-FUELED POWER PLANTS↗

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects [Slides]

Develop a Design Basis Document / Owner’s Technical Specification for nitrate salt systems in commercial parabolic trough and central receiver projects. A Design Basis Document is to a project what a heat exchanger specification is to a heat exchanger, Extensive commercial experience in salt equipment and system design, much of it gained through mistakes and associated expenses. Distill the successful experience with nitrate salt systems from as many commercial projects as possible. Starting from 7 historical Design Basis Documents, compile a consensus description of commercial equipment and system designs.