Search NASA⌕ Search

Engineering topics

Bolshinsky, I

Publications and source records attributed to Bolshinsky, I.

Air Shipment of Highly Enriched Uranium Spent Nuclear Fuel from Romania

Romania safely air shipped 23.7 kilograms of Russian origin highly enriched uranium (HEU) spent nuclear fuel from the VVR S research reactor at Magurele, Romania, to the Russian Federation in June 2009. This was the world’s first air shipment of spent nuclear fuel transported in a Type B(U) cask under existing international laws without special exceptions for the air transport licenses. This shipment was coordinated by the Russian Research Reactor Fuel Return Program (RRRFR), part of the U.S. Department of Energy Global Threat Reduction Initiative (GTRI), in cooperation with the Romania National Commission for Nuclear Activities Control (CNCAN), the Horia Hulubei National Institute of Physics and Nuclear Engineering (IFIN-HH), and the Russian Federation State Corporation Rosatom. The shipment was transported by truck to and from the respective commercial airports in Romania and the Russian Federation and stored at a secure nuclear facility in Russia where it will be converted into low enriched uranium. With this shipment, Romania became the 3rd country under the RRRFR program and the 14th country under the GTRI program to remove all HEU. This paper describes the work, equipment, and approvals that were required to complete this spent fuel air shipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research Reactor Preparations for the Air Shipment of Highly Enriched Uranium from Romania

In June 2009 two air shipments transported both unirradiated (fresh) and irradiated (spent) Russian-origin highly enriched uranium (HEU) nuclear fuel from two research reactors in Romania to the Russian Federation for conversion to low enriched uranium. The Institute for Nuclear Research at Pitesti (SCN Pitesti) shipped 30.1 kg of HEU fresh fuel pellets to Dimitrovgrad, Russia and the Horia Hulubei National Institute of Physics and Nuclear Engineering (IFIN-HH) shipped 23.7 kilograms of HEU spent fuel assemblies from the VVR S research reactor at Magurele, Romania, to Chelyabinsk, Russia. Both HEU shipments were coordinated by the Russian Research Reactor Fuel Return Program (RRRFR) as part of the U.S. Department of Energy Global Threat Reduction Initiative (GTRI), were managed in Romania by the National Commission for Nuclear Activities Control (CNCAN), and were conducted in cooperation with the Russian Federation State Corporation Rosatom and the International Atomic Energy Agency. Both shipments were transported by truck to and from respective commercial airports in Romania and the Russian Federation and stored at secure nuclear facilities in Russia until the material is converted into low enriched uranium. These shipments resulted in Romania becoming the 3rd country under the RRRFR program and the 14th country under the GTRI program to remove all HEU. This paper describes the research reactor preparations and license approvals that were necessary to safely and securely complete these air shipments of nuclear fuel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparative analysis of neutron sources produced by low-energy electrons and deuterons for driving subcritical assemblies.

A conceptual design of an accelerator driven subcritical assembly has been developed using the existing accelerators at Kharkov Institute of Physics and Technology (KIPT) in Ukraine. Two different external neutron source options were examined for driving the subcritical assembly. Electrons with energies below 200 MeV and deuterons with energies below 100 MeV were considered. Comparative analysis of these two options is presented and discussed. The Comparative analysis of neutron sources produced by low-energy electrons and deuterons show that: (1) An electron accelerator with electron energy in the range of 150 to 200 MeV is preferred for producing neutron source; (2) The uranium target material produces the highest neutron yield per electron; (3) The uranium target with 100 KW electron beam produces 3.3 x 10{sup 14} n/s; (4) The thermal hydraulics analyses of the uranium target operating with the 100 KW electron beam power satisfy the engineering design requirements; and (5) The peak thermal stresses (secondary stress) is less than the yield strength of the uranium target material.

36 MATERIALS SCIENCE↗

Ukraine experimental neutron source facility.

Kharkov Institute of Physics and Technology (KIPT) of Ukraine has a plan to construct an experimental neutron source facility. The facility has been developed for producing medical isotopes, training young nuclear professionals, supporting the Ukraine nuclear industry, providing capability for performing reactor physics, material research, and basic science experiments. Argonne National Laboratory (ANL) of USA is collaborating with KIPT on developing this facility. A driven subcritical assembly utilizing the KIPT electron accelerator with a target assembly is used to generate the neutron source. The target assembly utilizes tungsten or uranium for neutron production through photonuclear reactions with 100-KW of electron beam power. The neutron source intensity, spectrum, and spatial distribution have been studied to maximize the neutron yield and satisfy different engineering requirements. The subcritical assembly is designed to obtain the highest possible neutron flux intensity with a subcriticality of 0.98. Low enrichment uranium is used for the fuel material because it enhances the neutron source performance. Safety, reliability, and environmental considerations are included in the facility conceptual design. Horizontal neutron channels are incorporated for performing basic research including cold neutron source. This paper describes the conceptual design and summarizes some of the related analyses.

43 PARTICLE ACCELERATORS↗