Search NASA⌕ Search

Engineering topics

Bolzon, B

Publications and source records attributed to Bolzon, B.

Status of the Super-B factory Design

The SuperB international team continues to optimize the design of an electron-positron collider, which will allow the enhanced study of the origins of flavor physics. The project combines the best features of a linear collider (high single-collision luminosity) and a storage-ring collider (high repetition rate), bringing together all accelerator physics aspects to make a very high luminosity of 10{sup 36} cm{sup -2} sec{sup -1}. This asymmetric-energy collider with a polarized electron beam will produce hundreds of millions of B-mesons at the Y(4S) resonance. The present design is based on extremely low emittance beams colliding at a large Piwinski angle to allow very low {beta}{sub y} without the need for ultra short bunches. Use of crab-waist sextupoles will enhance the luminosity, suppressing dangerous resonances and allowing for a higher beam-beam parameter. The project has flexible beam parameters, improved dynamic aperture, and spin-rotators in the Low Energy Ring for longitudinal polarization of the electron beam at the Interaction Point. Optimized for best colliding-beam performance, the facility may also provide high-brightness photon beams for synchrotron radiation applications.

43 PARTICLE ACCELERATORS↗

Site Studies for the SuperB Collider and Synchrotron Radiation Facility Project

The SuperB complex project aims at the construction of a very high luminosity (10{sup 36} cm{sup -2}s{sup -1}) asymmetric e{sup +}e{sup -} B-factory and a few X-ray synchrotron beam lines (SR). The project has been recently approved by the Italian Government as part of the National Research Plan. The Tor Vergata University location has been chosen and a Consortium among INFN, University of Rome II Tor Vergata and the Research Ministry is being signed, allowing for the constitution of the 'Cabibbo Laboratory', where the SuperB project will be hosted. This paper presents and describes the status of the preliminary design of the site layout, related issues for the chosen site and the preliminary ground motion (GM) measurement results.

43 PARTICLE ACCELERATORS↗

ATF2 Summary and Status

The Accelerator Test Facility (ATF) [1] at KEK was originally constructed as a Damping Ring (DR) demonstration facility for the next generation of electron linear colliders. It consists of a 1.3 GeV s-band linac and a 136m circumference damping ring which can routinely generate 1.6 nC electron bunches with very small vertical emittances (<10pm.rad). Completed in December of 2008, a new extraction line and final focus optics was built, this is referred to as ATF2 [2]. The location of ATF in-relation to the KEK site can be seen in Figure 1. ATF is a general-purpose facility for accelerator physics related R and D activities, with approximately 50% of the available beam time currently devoted to the ATF2 program. The ATF2 extraction line (EXT) and final focus system (FFS) extends about 90 meters from the DR extraction point, a sketch of this system can be seen in figure 2, along with the location of key instrumentation. The primary purpose of the ATF2 beam line is to demonstrate a new style of magnetic focusing optics intended for use at future linear colliders, such as ILC or CLIC based on a local chromaticity correction scheme. The primary goal of the collaboration is to demonstrate the ability of this optics to focus an electron beam of similar emittance to the ILC using a FFS of the same design chromaticity. A comparison of some of the ATF2 design parameters with those of the ILC and CLIC are shown in table 1. With the 1.3 GeV beam energy of ATF2, the target spot size to prove the operability of this optics for ILC is 37nm. This is referred to as 'Goal 1'. In addition, Goal 1 requires the demonstration of stable operations with such a beam size at the Interaction Point (IP). 'Goal 2' is to demonstrate nm-level stability with respect to the IP beam monitors, such as is required for stable beam collisions at ILC or CLIC. A further goal is to attempt to increase the chromaticity of the final focus optics, reducing the IP beta functions to a level where the system more closely resembles the CLIC FFS, and also for some of the newly proposed ILC parameters. It is anticipated that the difficulty of successfully tuning the FFS to deliver design IP beam spot sizes scales with the chromaticity of the system. The design of the achromatic focusing system involves fine cancelation of first, second and third order aberrations at the IP. One needs more accurate cancelation the tighter one attempts to focus the beam, also including more higher order terms. By gradually pushing the system to smaller IP beta functions and higher chromaticity we hope to learn what the limits of such a design are when applied practically. This will give confidence in the design philosophy behind future high-luminosity colliders and in the simulations used to predict their behaviour.

43 PARTICLE ACCELERATORS↗

Present Status And First Results of the Final Focus Beam Line at the KEK Accelerator Test Facility

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European, and U.S. scientists. The present status and first results are described.

43 PARTICLE ACCELERATORS↗

Recent SuperB Design Choices Improve Next-Generation e e___ B-Factory Collider

The SuperB international team continues to optimize the design of an electron-positron collider, which will allow the enhanced study of the origins of flavor physics. The project combines the best features of a linear collider (high single-collision luminosity) and a storage-ring collider (high repetition rate), bringing together all accelerator physics aspects to make a very high luminosity of 10{sup 36} cm{sup -2} sec{sup -1}. This asymmetric-energy collider with a polarized electron beam will produce hundreds of millions of B-mesons at the {Upsilon}(4S) resonance. The present design is based on extremely low emittance beams colliding at a large Piwinski angle to allow very low {beta}*{sub y} without the need for ultra short bunches. Use of crab-waist sextupoles will enhance the luminosity, suppressing dangerous resonances and allowing for a higher beam-beam parameter. The project has flexible beam parameters, improved dynamic aperture, and spin-rotators in the Low Energy Ring for longitudinal polarization of the electron beam at the Interaction Point. Optimized for best colliding-beam performance, the facility may also provide high-brightness photon beams for synchrotron radiation applications.

43 PARTICLE ACCELERATORS↗

Vibration Budget for SuperB

We present a vibration budget for the SuperB accelerator. We include ground motion data, motion sensitivity of machine components, and beam feedback system requirements. The SuperB accelerator design attains at least 50 times higher than current B-factories due to smaller beam sizes and a crabbed waist crossing angle scheme at the IP (interaction point). The beam size (1{sigma}) at the IP will be about 10 {micro}m (horizontal) by 40 nm (vertical). These small beam sizes will make the luminosity very sensitive to mechanical vibration and electrical noise. Relative vertical misalignment of the two beams at the IP by only 8 nm will result in a 1% reduction in luminosity. The corresponding horizontal alignment tolerance of is 250x looser (2 {micro}m). The vertical beam angle at the IP for a 1% luminosity loss is fairly loose at 200 {micro}rad, and the horizontal beam angle tolerance is looser still. We will focus on vertical beam position at the IP, since this presents the greatest alignment challenge. The values presented here are for a closed orbit with tunes near a half-integer in the SuperB v.12 lattice.

43 PARTICLE ACCELERATORS↗

A Superconducting Magnet Upgrade of the ATF2 Final Focus

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R and D FF prototype under construction at BNL.

43 PARTICLE ACCELERATORS↗

ATF2 Commissioning

ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

43 PARTICLE ACCELERATORS↗