Search NASA⌕ Search

Engineering topics

Bond, Alex

Publications and source records attributed to Bond, Alex.

DECOVALEX-2023: Task G, SAFENET Final Report

DECOVALEX Task G deals with fracture mechanics at several scales using a combined approach of experimental work, related model development, benchmarking and experimental analysis. Fig. 0.1 provides a graphical abstract for Task G. The experimental basis for the related mechanical (M), hydro-mechanical (HM), and thermo-mechanical (TM) processes comes from the rock mechanics laboratories of Universities of Freiberg (TUBAF) and Edinburgh, as well as the Korea Institute of Civil Engineering and Building Technology (KICT). The experimental work in the rock laboratories is closely linked to the underground research laboratories (URLs) Reiche Zeche (Germany), KURT (Korea), and Mont Terri (Switzerland). The scientific key questions are related to fracture permeability evolution under THM conditions, anisotropy effects on fracturing processes, and thermal fracture slip, which are being addressed in specific steps of the task. A large variety of numerical methods have been developed and applied for experimental analysis, ranging from continuum to discontinuum approaches. A detailed comparison of mechanical and hydro-mechanical processes is given in the section 3 via the benchmarking exercises. As a result of DECOVALEX-2023 Task G we further improved our understanding and predictability of fracturing processes under THM conditions. This was based on robust numerical simulation methods and in-depth experimental analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DECOVALEX-2023: Task F2 Salt Final Report

The subject of Task F of DECOVALEX-2023 concerns performance assessment modelling of radioactive waste disposal in deep mined repositories. The primary objectives of Task F are to build confidence in the models, methods, and software used for performance assessment (PA) of deep geologic nuclear waste repositories, and/or to bring to the fore additional research and development needed to improve PA methodologies. In Task F2- (salt), these objectives have been accomplished through staged development and comparison of the models and methods used by participating teams in their PA frameworks. Coupled-process submodels and deterministic simulations of the entire PA model for a reference scenario for waste disposal in domal salt have been conducted. The task specification has been updated continuously since the initiation of the project to reflect the staged development of the conceptual repository model and performance metrics. Thermal, hydrological, mechanical, and chemical properties of individual components of the engineered and natural system were chosen for relevance by participating teams. The salt reference case system was characterized using data and measurements collected at relevant underground research laboratories (URLs), field sites, and simulation results from teams with specialized modelling capability. Participating teams made a wide range of model assumptions from compartmentalized networks to full 3D models of the salt formation. No single contributed model includes full-fidelity representation of all the features, events, and processes (FEPs) detailed in the task specification, but almost all features and processes are represented in at least one model. Despite differences in the modelling strategies developed by participating teams, all models indicate that salt compaction and radionuclide diffusion are key processes in the repository, and for the FEPs and model scenario considered, little of the disposed radionuclides will migrate beyond the repository seal over the 100,000 year simulations. In general, the model output quantities have the largest differences over the short term and near the waste. The models tend to be more similar further from waste and at later time. Disparities between the models are believed to be due to differing simplifications from the task specification, some of which are chosen simplifications to reduce complexity, and some are restrictions imposed by the modelling tools. A second round of this task has been accepted for DECOVALEX-2027 in conjunction with Task F1 on crystalline PA modelling. The future round includes waste package heating, improved modelling of salt creep closure, additional comparisons of coupled-process sub-models, and the impact of repository engineering design on radionuclide migration in the repository. Participants will also propose and finalize a set of uncertain inputs for the reference case simulations, propagate these uncertainties in a set of realizations, and conduct sensitivity analyses on the simulation results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International collaboration in disposal research: comparative modeling of coupled processes in the DECOVALEX project

Abstract. This presentation gives an overview of an international research collaboration for advancing the understanding and modeling of coupled thermo-hydro-mechanical-chemical (THMC) processes in geological systems. The creation of the international DECOVALEX project, now running for more than 25 years, was motivated by the recognition that prediction of these coupled effects is an essential part of the performance and safety assessment of geologic disposal systems for radioactive waste and spent nuclear fuel. DECOVALEX emphasizes joint analysis and comparative modeling of state-of-the-art field and laboratory experiments, across a range of host rock options and repository designs. Participating research teams are from radioactive waste management organizations, national research institutes, regulatory agencies, universities, and consulting groups, providing a wide range of perspectives and solutions to these complex problems. The presentation provides examples of the research contributions made collectively in past DECOVALEX tasks and also touches on the unique modeling challenges tackled in the ongoing project phase, referred to as DECOVALEX-2023. The current phase comprises 17 partner organizations, about 50 modeling teams, and 7 modeling tasks, which cover a broad portfolio from fundamental studies on gas migration to full-scale in situ heater experiments in different host rocks to performance assessment studies. Together, these examples illustrate that the insight and scientific knowledge gained within the DECOVALEX project would not have been possible if one group had studied these complex THMC modeling challenges alone rather than within a truly collaborative setting.

Birkholzer, Jens T.↗