Bonicelli, T

Publications and source records attributed to Bonicelli, T.

Status of the 1 MeV Accelerator Design for ITER NBI

The beam source of neutral beam heating/current drive system for ITER is needed to accelerate the negative ion beam of 40A with D{sup -} at 1 MeV for 3600 sec. In order to realize the beam source, design and R and D works are being developed in many institutions under the coordination of ITER organization. The development of the key issues of the ion source including source plasma uniformity, suppression of co-extracted electron in D beam operation and also after the long beam duration time of over a few 100 sec, is progressed mainly in IPP with the facilities of BATMAN, MANITU and RADI. In the near future, ELISE, that will be tested the half size of the ITER ion source, will start the operation in 2011, and then SPIDER, which demonstrates negative ion production and extraction with the same size and same structure as the ITER ion source, will start the operation in 2014 as part of the NBTF. The development of the accelerator is progressed mainly in JAEA with the MeV test facility, and also the computer simulation of beam optics also developed in JAEA, CEA and RFX. The full ITER heating and current drive beam performance will be demonstrated in MITICA, which will start operation in 2016 as part of the NBTF.

43 PARTICLE ACCELERATORS↗

Progress in design and integration of the ITER Electron Cyclotron H&CD system

The Electron Cyclotron system for ITER is an in-kind procurement shared between five parties and the total installed power will be 24 MW, corresponding to a nominal injected power of 20 MW to the plasma, with a possible upgrade up to 48 MW (corresponding to 40 MW injected). Some critical issues have been raised and changes are proposed to simplify these procurements and to facilitate the integration into ITER. The progress in the design and the integration of the EC system into the whole project is presented in this paper, as well as some issues still under studies and some recommendations made by external expert committees.

43 PARTICLE ACCELERATORS↗

Progress on the heating and current drive systems for ITER

The electron cyclotron (EC), ion cyclotron (IC), heating-neutral beam (H-NB) and, although not in the day 1 baseline, lower hybrid (LH) systems intended for ITER have been reviewed in 2007/2008 in light of progress of physics and technology in the field. Although the overall specifications are unchanged, notable changes have been approved. Firstly, it has been emphasized that the H&CD systems are vital for the ITER programme. Consequently, the full 73 MW should be commissioned and available on a routine basis before the D/T phase. Secondly, significant changes have been approved at system level, most notably: the possibility to operate the heating beams at full power during the hydrogen phase requiring new shine through protection; the possibility to operate IC with 2 antennas with increased robustness (no moving parts); the possible increase to 2 MW of key components of the EC transmission systems in order to provide an easier upgrading of the EC power as may be required by the project; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognised. The review describes these changes and their rationale.

08 HYDROGEN↗

Negative Ion Based Heating and Diagnostic Neutral Beams for ITER

To meet the requirements of the four operating and one start-up scenarios foreseen in the International Tokamak Experimental Reactor (ITER) a flexible heating mix will be required, which has to include a reliable contribution from neutral beams. The current baseline of ITER foresees 2 Heating Neutral Beam (HNB) systems based on negative ion technology, each operating at 1 MeV 40 A D{sup -} ions, and each capable of delivering up to 16.7 MW of D deg. to the ITER plasma. A 3rd HNB injector is foreseen as an upgrade option. In addition a dedicated Diagnostic Neutral Beam (DNB) injecting 100 keV 60 A of negative hydrogen ions will be available for charge exchange resonant spectroscopy (CXRS). The significant R and D effort necessary to meet the design requirements will be provided in the Neutral Beam Test Facility (NBTF), which is to be constructed in Padua, Italy. This paper gives an overview of the current status of the neutral beam (NB) systems and the chosen configuration. The ongoing integration effort into the ITER plant is highlighted and open interface issues are identified. It is shown how installation and maintenance logistics has influenced the design. ITER operating scenarios are briefly discussed, including start-up and commissioning. For example it is now envisaged to have a low current hydrogen phase of ITER operations, essentially for commissioning of the many auxiliary systems used on ITER. The low current limits the achievable plasma density, and hence the NB energy due to shine through limitations. Therefore a possible reconfiguration of the auxiliary heating systems is now being discussed. Other NB related issues identified by the ongoing design review process are emphasized and possible impact on the implementations of the HNB and DNB systems is indicated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗