Bora, D

Publications and source records attributed to Bora, D.

Status of the ITER IC H and CD System

The ITER Ion Cyclotron Heating and Current Drive system will deliver 20 MW of radio frequency power to the plasma in quasi continuous operation during the different phases of the experimental programme. The system also has to perform conditioning of the tokamak first wall at low power between main plasma discharges. This broad range of requirements imposes a high flexibility and a high availability. The paper highlights the physics and design requirements on the IC system, the main features of its subsystems, the predicted performance, and the current procurement and installation schedule.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Progress on the heating and current drive systems for ITER

The electron cyclotron (EC), ion cyclotron (IC), heating-neutral beam (H-NB) and, although not in the day 1 baseline, lower hybrid (LH) systems intended for ITER have been reviewed in 2007/2008 in light of progress of physics and technology in the field. Although the overall specifications are unchanged, notable changes have been approved. Firstly, it has been emphasized that the H&CD systems are vital for the ITER programme. Consequently, the full 73 MW should be commissioned and available on a routine basis before the D/T phase. Secondly, significant changes have been approved at system level, most notably: the possibility to operate the heating beams at full power during the hydrogen phase requiring new shine through protection; the possibility to operate IC with 2 antennas with increased robustness (no moving parts); the possible increase to 2 MW of key components of the EC transmission systems in order to provide an easier upgrading of the EC power as may be required by the project; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognised. The review describes these changes and their rationale.

08 HYDROGEN↗

Status of the Negative Ion Based Heating and Diagnostic Neutral Beams for ITER

The current baseline of ITER foresees 2 Heating Neutral Beam (HNB's) systems based on negative ion technology, each accelerating to 1 MeV 40 A of D{sup -} and capable of delivering 16.5 MW of D{sup 0} to the ITER plasma, with a 3rd HNB injector foreseen as an upgrade option. In addition a dedicated Diagnostic Neutral Beam (DNB) accelerating 60 A of H{sup -} to 100 keV will inject {approx_equal}15 A equivalent of H{sup 0} for charge exchange recombination spectroscopy and other diagnostics. Recently the RF driven negative ion source developed by IPP Garching has replaced the filamented ion source as the reference ITER design. The RF source developed at IPP, which is approximately a quarter scale of the source needed for ITER, is expected to have reduced caesium consumption compared to the filamented arc driven ion source. The RF driven source has demonstrated adequate accelerated D{sup -} and H{sup -} current densities as well as long-pulse operation. It is foreseen that the HNB's and the DNB will use the same negative ion source. Experiments with a half ITER-size ion source are on-going at IPP and the operation of a full-scale ion source will be demonstrated, at full power and pulse length, in the dedicated Ion Source Test Bed (ISTF), which will be part of the Neutral Beam Test Facility (NBTF), in Padua, Italy. This facility will carry out the necessary R and D for the HNB's for ITER and demonstrate operation of the full-scale HNB beamline. An overview of the current status of the neutral beam (NB) systems and the chosen configuration will be given and the ongoing integration effort into the ITER plant will be highlighted. It will be demonstrated how installation and maintenance logistics have influenced the design, notably the top access scheme facilitating access for maintenance and installation. The impact of the ITER Design Review and recent design change requests (DCRs) will be briefly discussed, including start-up and commissioning issues. The low current hydrogen phase now envisaged for start-up imposed specific requirements for operating the HNB's at full beam power. It has been decided to address the shinethrough issue by installing wall armour protection, which increases the operational space in all scenarios. Other NB related issues identified by the Design Review process will be discussed and the possible changes to the ITER baseline indicated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Negative Ion Based Heating and Diagnostic Neutral Beams for ITER

To meet the requirements of the four operating and one start-up scenarios foreseen in the International Tokamak Experimental Reactor (ITER) a flexible heating mix will be required, which has to include a reliable contribution from neutral beams. The current baseline of ITER foresees 2 Heating Neutral Beam (HNB) systems based on negative ion technology, each operating at 1 MeV 40 A D{sup -} ions, and each capable of delivering up to 16.7 MW of D deg. to the ITER plasma. A 3rd HNB injector is foreseen as an upgrade option. In addition a dedicated Diagnostic Neutral Beam (DNB) injecting 100 keV 60 A of negative hydrogen ions will be available for charge exchange resonant spectroscopy (CXRS). The significant R and D effort necessary to meet the design requirements will be provided in the Neutral Beam Test Facility (NBTF), which is to be constructed in Padua, Italy. This paper gives an overview of the current status of the neutral beam (NB) systems and the chosen configuration. The ongoing integration effort into the ITER plant is highlighted and open interface issues are identified. It is shown how installation and maintenance logistics has influenced the design. ITER operating scenarios are briefly discussed, including start-up and commissioning. For example it is now envisaged to have a low current hydrogen phase of ITER operations, essentially for commissioning of the many auxiliary systems used on ITER. The low current limits the achievable plasma density, and hence the NB energy due to shine through limitations. Therefore a possible reconfiguration of the auxiliary heating systems is now being discussed. Other NB related issues identified by the ongoing design review process are emphasized and possible impact on the implementations of the HNB and DNB systems is indicated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Microwave Produced Plasma Study in a Cylindrical System

Hydrogen plasma using electron cyclotron resonance (ECR) technique is produced and is studied in a small linear system for breakdown parameters. Microwave power in the experimental system is delivered by a magnetron at 2.45 GHz for 30 ms during which the breakdown of neutral gas occurs. The axial magnetic field required for ECR in the system is such that the fundamental ECR surface (B = 875 G) resides at the geometrical centre of the plasma system. ECR breakdown parameters such as plasma delay and plasma decay time are observed from plasma density measurements, carried out at the centre of plasma system using a specially designed Langmuir probe. The operating parameters such as working gas pressure (10{sup -5}-10{sup -2} mbar) and input microwave power (160-800 W) are varied and the corresponding effect on the breakdown parameters is observed and the parameter space for operating the pulsed experimental system has been identified. All the relevant experimental results obtained are presented.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗