Search NASA⌕ Search

Engineering topics

Brachmann, A.

Publications and source records attributed to Brachmann, A..

23 records · Page 2

Operation and Upgrades of the LCLS*

The LCLS FEL began user operations in September 2009 with photon energies from 800eV to 2 KeV and pulse energies above 2 mJ. Both long pulse (50-200 femtosecond FWHM) and short pulse (<10 femtosecond FWHM at 150 uJ) pulses were delivered at user request. In addition the FEL was operated at fundamental photon energies up to 10 KeV in preparation for hard X-ray experiments. FEL operating parameters, performance and reliability results will be presented, in addition to plans for upgrades to the facility.

Accelerators,ACCPHY, XFEL↗

FEL Gain Length and Taper Measurements at LCLS

We present experimental studies of the gain length and saturation power level from 1.5 nm to 1.5 {angstrom} at the Linac Coherent Light Source (LCLS). By disrupting the FEL process with an orbit kick, we are able to measure the X-ray intensity as a function of undulator length. This kick method is cross-checked with the method of removing undulator sections. We also study the FEL-induced electron energy loss after saturation to determine the optimal taper of the undulator K values. The experimental results are compared to theory and simulations.

43 PARTICLE ACCELERATORS↗

Operational Performance of LCLS Beam Instrumentation

The Linac Coherent Light Source (LCLS) X-ray FEL utilizing the last km of the SLAC linac has been operational since April 2009 and finished its first successful user run last December. The various diagnostics for electron beam properties including beam position monitors, wire scanners, beam profile monitors, and bunch length diagnostics are presented as well as diagnostics for the X-ray beam. The low emittance and ultra-short electron beam required for X-ray FEL operation has implications on the transverse and longitudinal diagnostics. The coherence effects of the beam profile monitors and the challenges of measuring fs long bunches are discussed.

43 PARTICLE ACCELERATORS↗

Commissioning of the LCLS LINAC

The Linac Coherent Light Source (LCLS) X-ray free electron laser project is currently under construction at the Stanford Linear Accelerator Center (SLAC). A new injector and upgrades to the existing accelerator were installed in two phases in 2006 and 2007. We report on the commissioning of the injector, the two new bunch compressors at 250MeV and 4.3 GeV, and transverse and longitudinal beam diagnostics up to the end of the existing linac at 13.6 GeV. The commissioning of the new transfer line from the end of the linac to the undulator is scheduled to start in November 2008 and for the undulator in March 2009 with first light to be expected in July 2009.

43 PARTICLE ACCELERATORS↗